Loading…
Loading…
Tender Value
₹2.8 Cr
EMD Value
₹5.5 L
Closing Date
15 Jul 2026, 2:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
S AND T
14 conditions · 2 needing a document upload
For works amounting Rs.50 lakhs and above: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of 'total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Any Telecom work involving provision of MIS/LAN/ WAN/ Helpline /UTS/ PRS / FOIS / value added enquiry system/video enquiry system/Data connectivity/ Datacom equipment / video conferencing / wireless communication/secured communication/Wi-Fi/ Telecom work involving computer based enquiry system.
9 conditions · 2 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Demand for the Financial Criteria, Association of Railway Officers, List of Arbitration cases, Court cases and Mandate for NEFT are to be uploaded with a scanned copy duly filled in and signed as per annexure no. IV, V, VI, VII, VIII, IX, XI, VIA, VIB, VI and Annexure-V and Annexure- V(A) of GCC-2022 respectively. These Annexures are available in View Document menu at Home page and is downloadable. The details of the uploaded documents should be produced whenever demanded for verification on written request at any point of time of the tender and contract within 7 days.
1. Tenderer must understand the work before quoting. Submission of tender shall be deemed to have been done after careful study and examination of papers as well as work site and understanding of the implication thereof. 2. Quoted rates shall include all types of taxes (including GST), duties, carrying cost of all materials for the work including loading unloading involved in the concerned work. 3. All the supply materials to be deposited at the store of SSE/Tele/Store/ASN. 4. All material supplied by Railway as well as those supplied by the contractor have to be transported from the store of SSE/Tele/Store/ASN to the site of work by the contractor's own arrangement. 5. All released materials as well as any leftover material intact will have to be transported from the site back to the office of the SSE/Tele/Store/ASN by contractor's own arrangement. 6. Any consumables which is required for execution of the work, not mentioned in this schedule as Rly. supply, contractor has to arrange for the same as per advice of Site Engineer. 7. Items supplied by the contractor will be inspected by the authorized representative of Sr. DSTE/ASN or RDSO/RITES as mentioned in schedule of work. Cost of inspection is as applicable. 8.Contractor have to submit indemnity bond for safe custody and protection of railway materials during transportation (sample may be collected from office) 9. Work to be done as per advice of site engineer.
10.The Contractor & his supervisors, staff must take proper precaution during working in Railway area to prevent any interference with existing Rly. system, working & passengers. 11. Care should be taken to avoid damage to existing gears during the work. Any damages to the Railway property shall be made good by the contractor in his own cost. 12. Payment shall be made as per extant works contract procedure based on actual work done. 13. Latest guideline of Railway Bd.'s vide letter no. 2018/CE-I/CT/9 dated 04.06.2018 regarding "Letter of Credit" as Mode of payment in Works Tenders or Service Tenders is attached in pdf file. 14. An Eastern Railway Guidelines (ER cable cut JPO) for protection of cables while digging work in the vicinity of underground Signalling, Electrical & Telecommunication cable (ER letter No.SG.224/13/0, dt.12.08.2024) has been finalized. Accordingly, while working near underground Signalling, Electrical & Telecommunication cable, proper care should be taken to avoid the cable cut, other wise the penalty amount as per Railway Guidelines will be recovered from the erring contractors.
Asansol Division: Provision of Communication facility at Railway colonies in Asansol Division..
25-SDSTE-ASN-2026-27
25-SDSTE-ASN-2026-27
Open
Works - General
18 Months
Paschim Bardhaman, West Bengal
₹0
₹5.5 L
15 Jul 2026
22 Jun 2026
1 Jul 2026
140 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,09,33,113.75 | ||
| — | 75.00 | — | — | ||
| Excavation of trench in all kinds of soil (1.2 mtr. Depth 300 mm width) and refilling of the trench without Bricks and final back filling, ramming and consolidation of soil as well as the disposal of the soil, if any. This work includes clearing of route from bushes etc, covering of cable laid in trench by loose soil for a layer of 50mm thickness approximately. Note: Payment will be made as per actual work done on pro-rata basis, if the required depth is not available at site. If the depth of trench is not uniform in a span of 100 mtr. of shorter lengths along the cable run, minimum depth will be taken for that particular stretch for payment. Prior permission should be taken before laying of cable if the depth of trenching is less than 1.0 Mtr. Inspection: Consignee. | — | — | — | 73,36,650 | |
| — | 75.00 | — | — | ||
| Laying of HDPE/DWC/GI Pipes in trench as per instruction of of site engineer. | — | — | — | 5,69,250 | |
| — | 75.00 | — | — | ||
| Blowing of armoured optic fiber cable (OFC Cable supplied by Railways) into the HDPE duct by using a blowing machine and associated works. 10% of OFC length to be blown extra on both ends of Duct i.e. total 20% of Duct length. Before blowing the duct integrity shall be tested. The payment shall be made after ensuring duct integrity and corrective action wherever required at his own cost. Payment will be made as per the length of Duct from which OFC is Blown. | — | — | — | 10,46,250 | |
| — | 150.00 | — | — | ||
| Jointing, terminating and Splicing of 6 Fiber Optical Fiber Cable and fixing of termination box/FDF/placing of joint closures in pit required at various location including transportation of all the jointing materials; terminating materials from railway store to the works site and returning left over materials to the railway store. The rate should include all jointing materials. | — | — | — | 3,49,950 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
GCC_April-2022.pdf
ATTACHMENT
TenderDocument_SnT.pdf
ATTACHMENT
2022_CE-I_CT_GCC-2022Policy14.07.2022.pdf
ATTACHMENT
GCC Correction Slip2
ATTACHMENT
mergedGCCCorrectionslip3456.pdf
ATTACHMENT
MergedGCCCorrectionSlip78910.pdf
ATTACHMENT
GCCCorrectionslip11.pdf
ATTACHMENT
2018-CE-I-CT-9dtd.pdf
ATTACHMENT
Annexure-C.pdf
ATTACHMENT
ACS-2toGCC-2022_2022-CE-1-CT-GCC-2022-POLICY_13.12.20221.pdf
ATTACHMENT
AllAnnexure.pdf
ATTACHMENT
CheckList.pdf
ATTACHMENT
AnnexureA.pdf
ATTACHMENT
JPO_telecompolicycircular108_cableroutemarker.pdf
ATTACHMENT
Modified_Cable_cut_JPO_NO._94.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .