Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.1 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.7 L+₹65,529.29 (8.12%)Admitted-Finance MEHLA DADRA BHADIAN KOTHI CHAMBA CHAMBA HIMACHAL PRADESH 176318 INDIA | CHAMBA | HIMACHAL PRADESH | 176318 | L2 | Admitted-Finance | ||
| 3 | L3₹9.6 L+₹1.6 L (19.3%)Admitted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L3 | Admitted-Finance |
Tender Value
₹9.7 L
EMD Value
₹19,440
Closing Date
6 Jan 2026, 2:00 pmClosed
Executive Engineer Irrigation Division No.II Jammu
Jammu
Improvement of Damaged Portion of Canal of D-10A of D-10 of MRC by way of Concrete Section in between RD 3308-3340, 11000-12000, including Ghat area RD 2830-2840 RD 2680-3690 RD 4270-4280 and RD 12350 Left Side 01 No.
2025_IFC_299373_4
Fresh e-NIT No. 25 of 12/2025-26
Open Tender
Civil Works - Canal
Percentage
30 days
Jammu
As per NIT
2 documents required · 2 mandatory
₹500
Executive Engineer Irrigation Division No.II Jammu
₹19,440
21 Jan 2026
29 Dec 2025
7 Jan 2026
29 Dec 2025
6 Jan 2026
29 Dec 2025
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form work for: Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs andsteps etc.
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand)
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth,consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
Carriage of sand bajri for an average distance of 25KM
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
BOQ_971203.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .