| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.6 CrAdmitted-Finance SHOP NO 102 PHASE 3 NEAR GATE NO 3 NEW AUTO MARKET HISAR 125001 HARYANA | HISAR | HISAR | HARYANA | 125001 | L1 | Admitted-Finance | |
| 2 | Rejected-Technical | - | Rejected-Technical Technically Non-Responsive | |
| 3 | Rejected-Technical P O BADARPURGHAT DIST HAILAKANDI ASSAM PIN 788803 | KARIMGANJ | ASSAM | 788803 | - | Rejected-Technical Technically Non-Responsive |
| Sl No | Description | Qty | Unit | KMR Buildcon Private Limited L1 |
|---|---|---|---|---|
| 1.01 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means (Bituminous course) | 3,064.64 | cum | 575 ₹17,62,168 Lowest |
| 1.02 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means
Granular Course | 21,176 | cum | 815 ₹1,72,58,440 Lowest |
| 1.03 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres)
Lime /Cement Concrete
Cement Concrete Grade M-15 & M-20 | 1,132.32 | cum | 2,255 ₹25,53,381.6 Lowest |
| 1.04 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres)
Lime /Cement Concrete
'Prestressed / Reinforced cement concrete grade M-20 & above | 7,117.44 | cum | 2,255 ₹1,60,49,827.2 Lowest |
| 1.05 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(a) Private land | 6,643.43 | Cum | 615 ₹40,85,710.07 Lowest |
| 1.06 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.) | 10,294.69 | cum | 4,300 ₹4,42,67,149.8 Lowest |
| 1.07 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) | 875 | cum | 5,020 ₹43,92,500 Lowest |
| 1.08 | Prime Coat
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(II) With bitumen emulsion-CSS-1 ( IS-8887-2004 ) | 53,235.84 | sqm | 43 ₹22,89,141.12 Lowest |
| 1.09 | Tack Coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(II) With Bitumen Emulsion CSS-1 (IS:8887-2004)
'(c) Granular surfaces treated with primer | 53,235.84 | sqm | 21 ₹11,17,952.64 Lowest |
| 1.10 | Dense Graded Bituminous Macadam (125mm) (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects) ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
(III) with 30/40 or VG-40 grade Bitumen (msa>30) | 6,850.2 | cum | 11,275 ₹7,72,36,005 Lowest |
Tender Value
₹43.5 Cr
EMD Value
₹87.0 L
Closing Date
15 Jun 2026, 5:00 pmClosed
General Manager (P)
General Manager (P) National Highways and Infrastructure Development Corporation Limited. Regional Office, 2nd Floor, Agnishanti Business Park, Opp. AGP Office GNB Road, Ambari, Guwahati- 781001
One Time Improvement from Km 0.000 (Karimganj) to km 12.500 (Ulukandi) of Silchar-Churaibari Section NH 37 (New) in the state of Assam during the year 2026-2027
2026_NHIDC_911016_1
AS/NH37/KXJ/OTI/SilChu/26-27/1
Open Tender
Civil Works
Item Rate
180 days
Assam
Please refer Tender Documents
5 documents required · 5 mandatory
₹11,800
NHIDCL
₹87.0 L
NHIDCL, RO Guwahati
2 Sept 2026
1 Jun 2026
16 Jun 2026
1 Jun 2026
15 Jun 2026
1 Jun 2026
1 Jun 2026 - 8 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Mechanical Means (Bituminous course) | 1 | cum | 100 | ₹99.9 |
| 1.02 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) By Manual Means
Granular Course | - | cum | 100 | - |
| 1.03 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres)
Lime /Cement Concrete
Cement Concrete Grade M-15 & M-20 | 1 | cum | 10 | ₹9.99 |
| 1.04 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material,disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 metres)
Lime /Cement Concrete
'Prestressed / Reinforced cement concrete grade M-20 & above | 1 | cum | 10 | ₹9.99 |
| 1.05 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) ( including compensation of earth.)(a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(a) Private land | 0.4 | Cum | 10 | ₹3.99 |
| 1.06 | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC,and compacting with vibratory roller to achieve the desired density,complete as per cl. 401( with an initial lead of 5 Km.) | 0.4 | cum | 10 | ₹3.99 |
| 1.07 | Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sb-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) | - | cum | 10 | - |
| 1.08 | Prime Coat
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 1.00 kg/sqm using mechanical means.)( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(II) With bitumen emulsion-CSS-1 ( IS-8887-2004 ) | 1 | sqm | 10 | ₹9.99 |
| 1.09 | Tack Coat
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.( Including cost of testing of materials at site and laboratory as directed by the deptt.)
(II) With Bitumen Emulsion CSS-1 (IS:8887-2004)
'(c) Granular surfaces treated with primer | 1 | sqm | 10 | ₹9.99 |
| 1.1 | Dense Graded Bituminous Macadam (125mm) (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT&H specification clause No. 507 complete in all respects) ( including carriage up to initial lead of 5.0 km from quarry and carriage of mixed materials up to 10.0 Km initial lead from mixing plant ) (Including cost of testing of materials at site and laboratory as directed by the deptt.)
(III) with 30/40 or VG-40 grade Bitumen (msa>30) | 1 | cum | 10 | ₹9.99 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_957444.xls
BOQ • 0.29 MB
RFP.pdf
Tender Documents • 1.49 MB
Drawing.pdf
PDF • 1.48 MB
21460.pdf
PDF • 1.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .