Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-Finance 0 JANTA COLONY LAKHOLI RAJNANDGAON CHHATTISGARH 491441 UDYAM CG 15 0004617 | RAJNANDGAON | CHHATTISGARH | 491441 | ₹7.0 L | L1 | Accepted-Finance QUALIFIED |
| 2 | L2₹7.4 LAccepted-Finance | ₹7.4 L | L2 | Accepted-Finance QUALIFIED |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ANSHIKA ENTERPRISES L2 | M/S SAI TRADERS L1 |
|---|---|---|---|---|---|
| 1.00fo|qr uxjh; forj.k [k.M&33 ds0oh0] VªkUl fgUMu] xkft;kckn vUrxZr vkus okys leLr 33@11 ds0oh0 midsUnzksa ij LFkkfir 33 ds0oh0 oh0lh0ch0 ,oa lh0vkj0 isuy dh vko’;drkuqlkj ejEer dk dk;Z vks0 ,.M ,e0 en esa bZ&fufonk }kjk ckg~; ,tsUlh ds ek/;e ls djkus gsrqA | |||||
| 1.01 | Overhauling and Maintenance alignment mechanism for smooth operation Including replavement of all rusted NUT & BOLT removing old lubrication cleaning of all moving parts & fresh H.Q lubrication alongwith the setting and alignment of trolly and panel. | 8 | No. | 15,000 ₹1.2 L | 10,000 ₹80,000 |
| 1.02 | Repairing of Complete tripping system assembling. | 8 | No. | 20,000 ₹1.6 L | 10,000 ₹80,000 |
| 1.03 | Repairing of gear of charging mechanism. | 8 | No. | 8,000 ₹64,000 | 10,000 ₹80,000 |
| 1.04 | Replacement of Bushing. | 8 | No. | 6,000 ₹48,000 | 6,000 ₹48,000 |
| 1.05 | Provide and Replacement of Damage BusBar. | 8 | No. | 6,000 ₹48,000 | 10,000 ₹80,000 |
| 1.06 | Replacement of interrupter Housing. | 10 | No. | 6,000 ₹60,000 | 9,000 ₹90,000 |
| 1.07 | Repairing of Charging Motor. | 9 | No. | 6,000 ₹54,000 | 5,000 ₹45,000 |
| 1.08 | Carring out comprehensive Test and Tripping Check of wiring of different incoming and outgoing feeder installed at various 33/11 KV S/S. Such as wiring of CT to Feeders Panel and up to Relay and then to auxiliary switch to trip coll in the trolly side by both simulating load at primary of CT and by simulating trip current by relay and there by locating the specific multifunction of the panel | 7 | No. | 14,000 ₹98,000 | 20,000 ₹1.4 L |
| 1.09 | Repairing of Drum Assembly. | 7 | No. | 12,000 ₹84,000 | 8,000 ₹56,000 |
Tender Value
₹8.5 L
EMD Value
₹8,474
Closing Date
3 Apr 2026, 12:00 pmClosed
SUPUERINTENDING ENGINEER, EUDC, ZONE-III, GZB
33/11 KV SUB STATION KALA PATHAR INDIRAPURAM GHAZIABAD
Electrical works
2026_PVVNL_1129626_1
08/W/25-26/D-33KV/EUDC/GZB
Open Tender
Electrical Works
365 days
Under EUDD-33 KV
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Yes
SUPERINTENDING ENGINEER, EUDC-II
₹8,474
Yes
8 Apr 2026
24 Mar 2026
3 Apr 2026
24 Mar 2026
3 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
fo|qr uxjh; forj.k [k.M&33 ds0oh0] VªkUl fgUMu] xkft;kckn vUrxZr vkus okys leLr 33@11 ds0oh0 midsUnzksa ij LFkkfir 33 ds0oh0 oh0lh0ch0 ,oa lh0vkj0 isuy dh vko’;drkuqlkj ejEer dk dk;Z vks0 ,.M ,e0 en esa bZ&fufonk }kjk ckg~; ,tsUlh ds ek/;e ls djkus gsrqA | - | - | - | - | BI01010001010000000000000515BI0100001112 | |
Overhauling and Maintenance alignment mechanism for smooth operation Including replavement of all rusted NUT & BOLT removing old lubrication cleaning of all moving parts & fresh H.Q lubrication alongwith the setting and alignment of trolly and panel. | 8 | No. | - | - | BI01010001010000000000000515BI0100001113 | |
Repairing of Complete tripping system assembling. | 8 | No. | - | - | BI01010001010000000000000515BI0100001113 | |
Repairing of gear of charging mechanism. | 8 | No. | - | - | BI01010001010000000000000515BI0100001113 | |
Replacement of Bushing. | 8 | No. | - | - | BI01010001010000000000000515BI0100001113 | |
Provide and Replacement of Damage BusBar. | 8 | No. | - | - | BI01010001010000000000000515BI0100001113 | |
Replacement of interrupter Housing. | 10 | No. | - | - | BI01010001010000000000000515BI0100001113 | |
Repairing of Charging Motor. | 9 | No. | - | - | BI01010001010000000000000515BI0100001113 | |
Carring out comprehensive Test and Tripping Check of wiring of different incoming and outgoing feeder installed at various 33/11 KV S/S. Such as wiring of CT to Feeders Panel and up to Relay and then to auxiliary switch to trip coll in the trolly side by both simulating load at primary of CT and by simulating trip current by relay and there by locating the specific multifunction of the panel | 7 | No. | - | - | BI01010001010000000000000515BI0100001113 | |
Repairing of Drum Assembly. | 7 | No. | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BOQ_2107162.xls
BOQ • 0.23 MB
TenderDocuments.pdf
Tender Documents • 0.52 MB
Download all tender documents and submit your bid