| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L1 | Accepted-Finance lowest | |
| 2 | L2₹1.0 L+₹800 (0.78%)Rejected-Finance BHAGWATI NAGAR JAMMU | L2 | Rejected-Finance not lowest | |
| 3 | L3₹1.0 L+₹1,650 (1.60%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance not lowest |
Tender Value
₹1.1 L
EMD Value
₹2,100
Closing Date
30 Oct 2024, 2:00 pmClosed
Executive Engineer
MID JAMMU
Repairs to electric sub station installed at Lift irrigation station Aijpur Trewa.
2024_IFC_261223_1
MID/J/e-NIT/2024-25/84
Open Tender
Repair and Maintenance Works
Item Wise
10 days
Aijpur Trewa
as per Enit
8 documents required · 8 mandatory
₹200
EXECUTIVE ENGINEER MID JAMMU
₹2,100
Yes
8 Nov 2024
19 Oct 2024
31 Oct 2024
19 Oct 2024
30 Oct 2024
20 Oct 2024
Repairs to electric sub station installed at Lift irrigation station Aijpur Trewa.
Reapirs to 250 KVA electric transformer installed at lift irrigation station Aijpur Trewa by way isolating transformer from 11 KV HT supply, removing of HT cables and LT cables from the transformer. Lifting of transformer from installed position using long boom crane and carriage of transformer to road side from the lift irrigation station. Shifting of transformer to workshop for repairs. Completely dismantling of the transformer after removing the top cover of transformer and extracting out the damaged LV and HV coils from the oil tank. Complete rewinding of HV coils and reconditioning of LV coils using superior quality insulating material. Providing and fitting of 4 no’s LV bushes, 3 no’s HV bushes, LV bush rod 4 no’s, HV bush rod 3 no’s, gasket set and nuts and bolts. Repairs to the core of transformer by replacing the flashed core material. Heating of assembled coils in oven for proper hot air process and to get required meager value. Properly cleaning the oil tank with scrubbers to remove all carbon deposits. Lowering the assembled coils in oil tank. Filtering of the transformer oil and topping up with 150 liters fresh transformer oil. Back shifting of the repaired transformer to the roadside at LIS Aijpur Trewa then with the help of the crane to the lift station and then installation of the repaired transformer to its original position.Complete job includes cost of material, labour charges, carriage back and forth, and welding charges. Note:- The Tenderers are requested to visit the site and quote the rate as per site conditions. The firm should offer rebate on old material.
Rebate on Old Parts
PERFECT ELECTRICAL WORKS (BID ID -2190299)
M/S FASTTRACK ENGINEERS (BID ID -2190576)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .