| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.6 LAccepted-AOC NO 430B ARAKKONAM TIRUTHANI ROAD ARAKKONAM RANIPET DISTRICT | ARAKKONAM | RANIPET | TAMIL NADU | ₹25.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹26.3 L+₹68,044.70 (2.65%)Rejected-AOC | ₹26.3 L+₹68,044.70 (2.65%) | L2 | Rejected-AOC L2 |
| 3 | L3₹26.5 L+₹88,392.62 (3.45%)Rejected-AOC D NO 7 267 YELLANALLI KETTI PO | DHARMAPURI | TAMIL NADU | 635106 | ₹26.5 L+₹88,392.62 (3.45%) | L3 | Rejected-AOC L3 |
| 4 | L4₹26.5 L+₹89,710.68 (3.50%)Rejected-AOC | ₹26.5 L+₹89,710.68 (3.50%) | L4 | Rejected-AOC L4 |
| 5 | L5₹26.6 L+₹96,684.48 (3.77%)Rejected-AOC D NO 6 41 SREE THIRUMALAI ILLAM UPPER BAZAAR OOTY | ERODE | TAMIL NADU | 638451 | ₹26.6 L+₹96,684.48 (3.77%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | dhamodharan L3 | ANBUMANI L2 | D HEMALATHA L6 | ravi L5 | MPANDCO L1 | G Velmurugan L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Construction of 60000 Litres OHT Tank (12m staging height) at Sembedu Village H/O Sembedu Panchayat | |||||||||
| 2.00 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 72 | cum | 240 ₹17,280 Lowest | 263.78 ₹18,992 | 260 ₹18,720 | 250 ₹18,000 | 250 ₹18,000 | 250 ₹18,000 |
| 3.00 | Foundation | 9 | cum | 240 ₹2,160 Lowest | 263.78 ₹2,374 | 260 ₹2,340 | 250 ₹2,250 | 263.78 ₹2,374 | 250 ₹2,250 |
| 4.00 | Supplying and filling foundaton and basement with filling sand n layaedrts not more the 15cm thick well remed waterede and compacted complete complying with standard specifcatiion | 5.4 | cum | 2,150 ₹11,610 Lowest | 2,198.14 ₹11,870 | 2,198 ₹11,869 | 2,198 ₹11,869 | 2,198.14 ₹11,870 | 2,154 ₹11,632 |
| 5.00 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 5.4 | cum | 5,900 ₹31,860 Lowest | 5,985.47 ₹32,322 | 5,985 ₹32,319 | 5,985 ₹32,319 | 5,985.47 ₹32,322 | 5,950 ₹32,130 |
| 6.00 | Items 1.50 m to 4.50m below GL | 12.34 | cum | 9,874 ₹1,21,816 Lowest | 9,875.88 ₹1,21,839 | 9,875 ₹1,21,828 | 9,875 ₹1,21,828 | 9,875.88 ₹1,21,839 | 9,875 ₹1,21,828 |
| 7.00 | Items 0 m to 1.50m below GL | 2.53 | cum | 9,736 ₹24,632 Lowest | 9,737.11 ₹24,635 | 9,737.11 ₹24,635 | 9,737 ₹24,635 | 9,737.11 ₹24,635 | 9,737 ₹24,635 |
| 8.00 | Items 0.0 to 4.50m Above GL | 4 | cum | 9,877 ₹39,508 Lowest | 9,878.18 ₹39,513 | 9,878.18 ₹39,513 | 9,878 ₹39,512 | 9,878.18 ₹39,513 | 9,877 ₹39,508 Lowest |
| 9.00 | Items Above 4.51m to 7.32 m | 3.17 | cum | 10,155 ₹32,191 Lowest | 10,156.07 ₹32,195 | 10,156.07 ₹32,195 | 10,156 ₹32,195 | 10,156.07 ₹32,195 | 10,155 ₹32,191 Lowest |
| 10.00 | Items Above GL 7.33m to 10.98m | 3.58 | cum | 10,432 ₹37,347 Lowest | 10,433.96 ₹37,354 | 10,433.96 ₹37,354 | 10,433 ₹37,350 | 10,433.96 ₹37,354 | 10,432 ₹37,347 Lowest |
Tender Value
₹27 L
EMD Value
₹27,000
Closing Date
5 Mar 2026, 3:00 pmClosed
BDO BP AKM
Panchayat Union Arakkonam
Construction of 60000 Litres OHT Tank (12m staging height) at Sembedu Village H/O Sembedu Panchayat
2026_RDTN_668427_1
A2/2046/2025
Open Tender
Civil Works
Item Rate
180 days
Panchayat Union Arakkonam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹27,000
Yes
16 Aug 2026
2 Mar 2026
5 Mar 2026
2 Mar 2026
5 Mar 2026
2 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of 60000 Litres OHT Tank (12m staging height) at Sembedu Village H/O Sembedu Panchayat | - | - | - | - |
| 2 | Earth work Excavation for Foundation in all soils and Sub Soil as per SS20B for foundation etc. complete.SS 20B | 72 | cum | 263.78 | ₹18,992.16 |
| 3 | Foundation | 9 | cum | 263.78 | ₹2,374.02 |
| 4 | Supplying and filling foundaton and basement with filling sand n layaedrts not more the 15cm thick well remed waterede and compacted complete complying with standard specifcatiion | 5.4 | cum | 2,198.14 | ₹11,869.96 |
| 5 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 5.4 | cum | 5,985.47 | ₹32,321.54 |
| 6 | Items 1.50 m to 4.50m below GL | 12.34 | cum | 9,875.88 | ₹1,21,838.73 |
| 7 | Items 0 m to 1.50m below GL | 2.53 | cum | 9,737.11 | ₹24,634.89 |
| 8 | Items 0.0 to 4.50m Above GL | - | cum | 9,878.18 | - |
| 9 | Items Above 4.51m to 7.32 m | 3.17 | cum | 10,156.07 | ₹32,194.74 |
| 10 | Items Above GL 7.33m to 10.98m | 3.58 | cum | 10,433.96 | ₹37,353.58 |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_803096.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .