| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹15.4 LAccepted-AOC MAIN ROAD LATEHAR | LATEHAR | JHARKHAND | 822111 | ₹15.4 L | L2 | Accepted-AOC L1 Technical Non Responsive |
| 2 | L3₹16.3 LRejected-Finance | ₹16.3 L | L3 | Rejected-Finance L3 |
| 3 | L4₹16.4 LRejected-Finance | ₹16.4 L | L4 | Rejected-Finance L4 |
| 4 | L5₹16.7 LRejected-Finance SASANG LATEHAR | LATEHAR | LATEHAR | JHARKHAND | ₹16.7 L | L5 | Rejected-Finance L5 |
| 5 | L6₹16.9 LRejected-Finance STATION ROAD LATEHAR | LATEHAR | LATEHAR | JHARKHAND | ₹16.9 L | L6 | Rejected-Finance L6 |
Tender Value
₹25.0 L
EMD Value
₹50,000
Closing Date
18 Feb 2026, 5:00 pmClosed
E.E.NREP, LATEHAR
E.E.NREP, LATEHAR
Renovation of Hostel Building ,Construction of Toilet Block and Paver Block Pathway at ST Residential School (Boys) Baniyo Block-Balumath District- Latehar
2026_LNREP_110209_1
NREP/LATEHAR/45/2025-26
Open Tender
Civil Works
Percentage
90 days
JHABAR BALUMATH
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
₹50,000
26 Mar 2026
11 Feb 2026
20 Feb 2026
11 Feb 2026
18 Feb 2026
11 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling R.C.C. work including stacking serviceable materials in countable stacks within 15M. Lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | 1 | M3 | 1,993.04 | ₹1,991.05 |
| 2 | Dismantling pucca brick or lime work including stacking serviceable materials in countable stacks within 15 M lead and disposal of unserviceable materials with all leads all complete as per direction of E/I. | - | M3 | 541.67 | - |
| 3 | Earthwork in excavation in foundation trenches in ordinary soil (vide classfication of soil item - A) and disposal of excavated earth a obtained to a distance up to 50M including all lifts with leveling ramming the foundation trenches removing roots of trees shurbs all complete as per approved design and per building specification and direction of E/I. | 1 | cu.m | 151.82 | ₹151.67 |
| 4 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item - A0 and disposal of excavated earth as obtained to a distance upto 50M including all lifts levelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I. | 1 | Cum | - | - |
| 5 | Providing coarse clean sand in filling in foundation trenches or plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts includng cost of all materials, Labour, rotalty and taxes all complete as per building specification and direction of E/I (Mode of measurement compacted volume). | - | cu.m | 589.51 | - |
| 6 | Providing designation 75B one brick flat soling joints fitted with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 1 | Sqm | 330.34 | ₹330.01 |
| 7 | 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | - | Cum | 4,503.43 | - |
| 8 | Providing and laying in position cement concret of specified grade excluding the cost of centering and shuttering - All work up to plinth level in foundation with approved quality of stone chips all complete as per building specification and direction of E/l.Providing P.C.C M15 in foundation and plinth -do- | 1 | Cum | 4,598.23 | ₹4,593.63 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) Foundation | - | cu.m | 5,218 | - |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone
aggregate 40 mm nominal size) | - | Cum | 3,751.64 | - |
stage.html
html • 0.08 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.15 MB
Group_45.pdf
Tender Documents • 0.25 MB
BOQ_149001.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .