Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4,132.18Admitted-Finance | -53.56% | ₹4,132.18 | L1 | Admitted-Finance |
| 2 | L2₹4,715.89Admitted-Finance R O JASROTA KATHUA | KATHUA | JAMMU AND KASHMIR | 184101 | -47.00% | ₹4,715.89 | L2 | Admitted-Finance |
| 3 | L3₹5,231.97Admitted-Finance HAMIRPUR TEHSIL MARHEEN DISTRICT KATHUA | HAMIRPUR | UTTAR PRADESH | 210301 | -41.20% | ₹5,231.97 | L3 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
23 Apr 2026, 4:00 pmClosed
Executive Engineer PWD R and B division kathua
Executive Engineer PWD R and B division kathua
Refer to BOQ
2026_PWDJK_307715_1
E-NIT No 05/2026/469-67/G Dated11.04.2026
Open Tender
Civil Works
365 days
Kathua
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer PWD R and B division kathua
₹50,000
Executive Engineer PWD R and B division kathua
6 May 2026
13 Apr 2026
24 Apr 2026
13 Apr 2026
23 Apr 2026
13 Apr 2026
17 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
Hand packing stones in wire crates including the cost of stones and cost of crates incl. all leads, lifts and carriage of material by MT / H.L. | - | Cum | - | - | BI01010001010000000000000515BI0100001114 | |
Earth work excavation in all kinds of soil by mechanical means in foundation trenches, drains, pipes and cables etc. ( not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5mtr. incl. disposed the excavated earth as per direction of Engineer-in -Charge | - | Cum | - | - | BI01010001010000000000000515BI0100001114 | |
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes.600 mm dia. R.C.C. pipe | - | Rmt | - | - | BI01010001010000000000000515BI0100001114 | |
Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-3 class (Medium duty) R.C.C. pipes.450 mm dia. R.C.C. pipe | - | Rmt | - | - | BI01010001010000000000000515BI0100001114 | |
Supplying and laying including digging, carrying by lorry, filling River Bed Material including watering & consolidation in layers to specified lines, camber, grades and cross sections. Finished work including material, labour and all leads and lifts, carriage of material by MT/HL. | - | Cum | - | - | BI01010001010000000000000515BI0100001114 | |
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared | - | 100 sqm | - | - | BI01010001010000000000000515BI0100001114 | |
Engaging Labour as per requiremt of site | - | No. | - | - | BI01010001010000000000000515BI0100001114 | |
Slip cleranace in soils mixed with moorum/kankar/shingle/boulders incl. disposal lead and lift as per direction of Engineer-in-Charge | - | Cum | - | - | BI01010001010000000000000515BI0100001114 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.06 MB
BOQ_998097.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid