Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.9 LAccepted-AOC BASANTPUR KEDLA DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹2.9 L | L-1 | Accepted-AOC Accept |
| 2 | L-2₹3.0 LRejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | KEDLA | RAMGARH | JHARKHAND | ₹3.0 L | L-2 | Rejected-AOC Reject |
| 3 | L-3₹3.0 LRejected-AOC BASANTPUR KEDLA RAMGARH DIST RAMGARH JHARKHAND | ₹3.0 L | L-3 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | CHAHAT CONSTRUCTION COMPANY L3 | TRIDEO CONSTRACTION L1 | TRIBHUWAN ENTERPRISES L2 |
|---|---|---|---|---|---|---|
| 1.00 | Replacement of the belt conveyor belt 1000mm width in unit no 415, 227 & 307 B/Conv. (a) Shifting of conveyor belt at site and old conveyor shifting to scrap yard. | 6.06 | MT | 1,380 ₹8,368.32 | 1,360 ₹8,247.04 | 1,365 ₹8,277.36 |
| 2.00 | (b) Dismantling of old conveyor belt | 3.03 | MT | 2,150 ₹6,518.80 | 2,120 ₹6,427.84 | 2,125 ₹6,443 |
| 3.00 | (c) Installation of conveyor belt (New) | 3.03 | MT | 4,247 ₹12,876.90 | 4,245 ₹12,870.84 | 4,250 ₹12,886 |
| 4.00 | Dismantling of damaged liner plate =40% of new (1.886MT+2.321MT+3.078MT) = 40 % of 7.285 = 2.914 | 2.91 | MT | 5,650 ₹16,464.10 | 5,560 ₹16,201.84 | 5,600 ₹16,318.40 |
| 5.00 | Fabrication & erection of liner plate. | 7.29 | MT | 10,850 ₹79,042.25 | 10,740 ₹78,240.90 | 10,800 ₹78,678 |
| 6.00 | Shifting of damaged liner plate =2.914MT | 2.91 | MT | 1,380 ₹4,021.32 | 1,360 ₹3,963.04 | 1,365 ₹3,977.61 |
| 7.00 | Replacement of new conveyor belt strengthening work & liner plate of unit no. 304 belt conveyor. (a) Shifting of new conveyor belt drive, Iron & steel items at site =5.572+1.116+1.899MT = | 8.59 | MT | 1,380 ₹11,850.06 | 1,360 ₹11,678.32 | 1,365 ₹11,721.25 |
| 8.00 | Dismantling of old conveyor belt 5.572+take-up arrangement 4.400MT= | 9.97 | MT | 2,150 ₹21,439.80 | 2,120 ₹21,140.64 | 2,125 ₹21,190.50 |
| 9.00 | Dismantling of Iron and steel materials and samaged liner plate 40% of new (1.116MT+1.3899MT)=40% of new3.015MT | 1.21 | MT | 5,650 ₹6,813.90 | 5,560 ₹6,705.36 | 5,600 ₹6,753.60 |
| 10.00 | Fabrication & erection of liner plate and strengthening materials (1.116+1.899)=. | 3.02 | MT | 10,850 ₹32,712.75 | 10,740 ₹32,381.10 | 10,800 ₹32,562 |
Tender Value
₹2.9 L
EMD Value
₹3,700
Closing Date
28 Jul 2025, 6:00 pmClosed
Sumit Kumar
Office of the Project Officer, Kedla Washery, Ramgarh
Replacement of the belt conveyor of different units 415, 227, 307, and 304, strengthening work of unit no. 304 and replacement of liner plates in the discharge chute of unit no. 415, 227, 307 and 304 of Kedla Washery
2025_CCL_339707_1
PO/KW/E-TENDER/25-26/10 dated 16.07.2025
Open Tender
Electrical and Maintenance Works
15 days
Kedla Washery, Ramgarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,700
25 Apr 2026
16 Jul 2025
29 Jul 2025
17 Jul 2025
28 Jul 2025
17 Jul 2025
17 Jul 2025 - 22 Jul 2025
Amount
Replacement of the belt conveyor belt 1000mm width in unit no 415, 227 & 307 B/Conv. (a) Shifting of conveyor belt at site and old conveyor shifting to scrap yard.
(b) Dismantling of old conveyor belt
(c) Installation of conveyor belt (New)
Dismantling of damaged liner plate =40% of new (1.886MT+2.321MT+3.078MT) = 40 % of 7.285 = 2.914
Fabrication & erection of liner plate.
Shifting of damaged liner plate =2.914MT
Replacement of new conveyor belt strengthening work & liner plate of unit no. 304 belt conveyor. (a) Shifting of new conveyor belt drive, Iron & steel items at site =5.572+1.116+1.899MT =
Dismantling of old conveyor belt 5.572+take-up arrangement 4.400MT=
Dismantling of Iron and steel materials and samaged liner plate 40% of new (1.116MT+1.3899MT)=40% of new3.015MT
Fabrication & erection of liner plate and strengthening materials (1.116+1.899)=.
Installation & alignment of conveyor belt pulley, take-up arrangement 5.572+4.400MT=9.972MT
Shifting of old conveyor belt + iron & steel materials and damaged liner plate=5.572+1.206MT=6.778MT
Total impact of GST for the purpose of CTC
TRIBHUWAN ENTERPRISES (BID ID -1170961)
CHAHAT CONSTRUCTION COMPANY (BID ID -1171110)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.37 MB
BOQ_352160.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid