Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹17.0 LAdmitted-Finance | ₹17.0 L | L1 | Admitted-Finance |
| 2 | L2₹17.1 LAdmitted-Finance | ₹17.1 L | L2 | Admitted-Finance |
| 3 | L3₹20.0 LAdmitted-Finance SHOP NO 10 BMC SHOPPING CENTRE MITHA NAGAR GOREGAON W MUMBAI 400 104 | MUMBAI SUBURBAN | MAHARASHTRA | 400104 | ₹20.0 L | L3 | Admitted-Finance |
| 4 | L4₹20.1 LAdmitted-Finance | ₹20.1 L | L4 | Admitted-Finance |
| 5 | L5₹21.6 LAdmitted-Finance SWAGAT CO OP HSG SOCIETY LTD 22 303 CHATRAPATI SHIVAJI RAJE COMPLEX MHADA COMPLEX OPP EKTA NAGAR KANDIVALI W MUMBAI 400 067 | MUMBAI SUBURBAN | MAHARASHTRA | 400067 | ₹21.6 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R J ENTERPRISES L7 | M/s. Deepak Traders L6 | Shree Ayyappa Engineering L3 | cooltech engineering services L5 | AISWARYA ENTERPRISES L1 | PAUL REFRIGERATION L2 | VEENA ENTERPRISES L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Supplying, installation, testing & commissioning of Retrofit Emission Control Device (RECD) on existing Diesel Generator Set of capacity 62.5 KVA of any make, model and vintage at Main Power house MO Mb Ghatkopar by making necessary modification, welding of suitable size angle and pipe for support structure and suitable size ladder including cutting of old silencer/muffler without damaging diesel generator set to reduce guaranteed specification particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency: Minimum 70% for all DG Sets, emission tested as per D2, 5 mode test cycle as specified in ISO-8178-Part 4 complete all as specified and as directed by Engineer-in-Charge with following Specification:- | 1 | Each | 2,99,711 ₹3.0 L | 3,14,000 ₹3.1 L | 3,09,000 ₹3.1 L | 3,19,000 ₹3.2 L | 3,09,000 ₹3.1 L | 3,80,000 ₹3.8 L | 2,80,000 ₹2.8 L |
| 1.01 | (a) Purification Technology: No filters, No solvents, No Chemicals | - | - | - | - | - | - | - | - | - |
| 1.02 | (b) Pollution Captured: PM 2.5 to PM 10 | - | - | - | - | - | - | - | - | - |
| 1.03 | (c) Electric Supply: 220 Volts AC | - | - | - | - | - | - | - | - | - |
| 1.04 | (d) Material: Mild Steel | - | - | - | - | - | - | - | - | - |
| 1.05 | (e) Reported PM Reduction: 80% to 90% | - | - | - | - | - | - | - | - | - |
| 1.06 | (f) By Product: Soot Particles. | - | - | - | - | - | - | - | - | - |
| 1.07 | (g) Disposal: No burning or dumping of captured partured particles. | - | - | - | - | - | - | - | - | - |
| 1.08 | (h) Collection of captured Particles: Once in 02 Months. | - | - | - | - | - | - | - | - | - |
| 1.09 | (j) Capturing Chamber Material: Stainless Steel. | - | - | - | - | - | - | - | - | - |
Updated dates
Tender Value
₹17 L
EMD Value
₹34,000
Closing Date
28 Apr 2026, 6:00 pmClosed
GE (NW) BHANDUP
MUMBAI
MAINT AND OPERATION OF DG SETS AT MO (MB) GHATKOPAR UNDER GE (NW) BHANDUP
2026_MES_758796_1
8487/B
Open Tender
Civil Works
335 days
MO (MB) GHATKOPAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Yes
GE (NW) BHANDUP
₹34,000
2 Jun 2026
31 Mar 2026
29 Apr 2026
31 Mar 2026
28 Apr 2026
14 Apr 2026
31 Mar 2026 - 10 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Supplying, installation, testing & commissioning of Retrofit Emission Control Device (RECD) on existing Diesel Generator Set of capacity 62.5 KVA of any make, model and vintage at Main Power house MO Mb Ghatkopar by making necessary modification, welding of suitable size angle and pipe for support structure and suitable size ladder including cutting of old silencer/muffler without damaging diesel generator set to reduce guaranteed specification particulate matter (PM 2.5) Carbon Monoxide, Hydrocarbon reduction efficiency: Minimum 70% for all DG Sets, emission tested as per D2, 5 mode test cycle as specified in ISO-8178-Part 4 complete all as specified and as directed by Engineer-in-Charge with following Specification:- | 1 | Each | - | - | |
(a) Purification Technology: No filters, No solvents, No Chemicals | - | - | - | - | |
(b) Pollution Captured: PM 2.5 to PM 10 | - | - | - | - | |
(c) Electric Supply: 220 Volts AC | - | - | - | - | |
(d) Material: Mild Steel | - | - | - | - | |
(e) Reported PM Reduction: 80% to 90% | - | - | - | - | |
(f) By Product: Soot Particles. | - | - | - | - | |
(g) Disposal: No burning or dumping of captured partured particles. | - | - | - | - | |
(h) Collection of captured Particles: Once in 02 Months. | - | - | - | - | |
(j) Capturing Chamber Material: Stainless Steel. | - | - | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_849924.xls
BOQ • 1.05 MB
TENDERDOCUMENTS8487.pdf
Tender Documents • 1.36 MB
Download all tender documents and submit your bid