| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹4.7 LAccepted-AOC | L-1 | Accepted-AOC L-1 | |
| 2 | L-2₹3.1 L+₹13,816 (1.64%)Accepted-AOC | L-2 | Accepted-AOC L-2 | |
| 3 | Rejected-Technical KASIMPUR RAMASHANKAR YADAV 165 35 TYPE SECOND NEW COLONY KASIMPUR ALIGARH UTTAR PRADESH 202127 | ALIGARH | UTTAR PRADESH | 202127 | - | Rejected-Technical PQC not fulfilled |
Tender Value
₹7.6 L
EMD Value
₹15,000
Closing Date
17 Nov 2020, 2:00 pmClosed
Er Sunil Kumar SE OMC II DTPS Kasimpur
Office of the SE OMC-II DTPS Kasimpur Aligarh Mobile No 9415900792
Preventive and Breakdown Maintenance of Boiler Feed Pump Booster Pump Hydraulic Coupling Condensate Extraction Pump and Vacuum Pumps of Unit 8 and 9 of DTPS Kasimpur
2020_RVUNL_507401_1
ET-18/OMC-II/TMD/20-21
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
Office of the SE OMC-II DTPS Kasimpur Aligarh
As per Tender Documents
4 documents required · 4 mandatory
₹1,180
SAO EPAD HTPS KASIMPUR ALIGARH
₹15,000
13 Sept 2021
2 Sept 2020
19 Nov 2020
2 Sept 2020
17 Nov 2020
2 Sept 2020
2 Sept 2020 - 17 Nov 2020
Amount
Threading out of BFP Cartridge. Time of Completion 48 Hrs
Threading in spare/repaired BFP Cartridge assembly. Time of Completion 48 Hrs
Inspection, Replacement & rectification of NDE Mechanical seals of Boiler Feed Pumps. Time of Completion 08 Hrs
Inspection, Replacement and Rectification of DE Mechanical seals of Boiler Feed Pumps. Time of Completion 08 Hrs
Inspection and Rectification of NDE Thrust cum Journal bearings of BFP. Time of Completion 06 Hrs
Inspection of Thrust pads of NDE bearings of Boiler Feed pumps. Time of Completion 06 Hrs
Inspection and Rectification of DE journal bearing of BFP. Time of Completion 06 Hrs
Attending leakages from stuffing box of BFPs. Time of Completion 24 Hrs
Inspection and Re-visioning of DE water-jackets of Boiler Feed Pumps. Time of Completion 08 Hrs
Inspection and Re-visioning of NDE water-jackets of Boiler Feed Pumps. Time of Completion 08 Hrs
Replacement / Refitting of Damaged half coupling, (Pump /Hydraulic coupling /motor), with new one. Time of Completion 06 Hrs
Replacement/Refitting of complete (both side) damaged coupling between motor & hydraulic coupling / between hydraulic coupling & BFP side, with new one. Time of Completion 10 Hrs
Checking and adjustment of radial and axial alignment of BFP with hydraulic coupling. Time of Completion 06 Hrs
Inspection and Rectification of NDE Thrust cum journal bearing of Booster pump. Time of Completion 06 Hrs
Inspection and Rectification of DE journal bearing of Booster pump. Time of Completion 06 Hrs
Inspection and Rectification of DE mechanical seals of Booster pump. Time of Completion 08 Hrs
Inspection and Rectification of NDE mechanical seals of Booster pump. Time of Completion 08 Hrs
Replacement of Damaged half coupling, (Booster Pump side/motor side), with new one. Time of Completion 06 Hrs
Replacement of complete (both side) damaged coupling between motor & Booster Pump, with new one. Time of Completion 10 Hrs
De-assembly / checking / servicing and rectification of defective booster pump assembly. Time of Completion 24 Hrs
Replacement of spare / repaired booster pump assembly and its commissioning. Time of Completion 24 Hrs
Checking and adjustment of radial and axial alignment of Booster pump with BFP motor. Time of Completion 06 Hrs
Inspection and Re-visioning of cam controller assembly. Time of Completion 08 Hrs
Servicing and rectification of internals of Hydraulic coupling their reassembly and commissioning. Time of Completion 48 Hrs
Inspection and Rectification of thrust bearing no.3 and 4 of Hydraulic coupling. Time of Completion 10 Hrs
Checking and adjustment of radial and axial alignment of hydraulic coupling with BFP motor. Time of Completion 06 Hrs
Replacement/Servicing of bearing of Motor. (Booster Pump side /Hydraulic Coupling side). Time of Completion 06 Hrs
Servicing / cleaning of water cooler of BFP Motor. Time of Completion 24 Hrs
Servicing/Overhauling of Condensate extraction pump Type EN7H-32. Time of Completion 48 Hrs
Inspection and rectification of Thrust Bearing and journal bearing of condensate extraction pumps. Time of Completion 06 Hrs
Re-alignment and adjustment of condensate extraction pump with motor. Time of Completion 02 Hrs
Complete servicing/overhauling of vacuum pump Type- TC-11 Make: NASH. Time of Completion 10 Days
Replacement/Servicing of DE bearing of main vacuum pump. Time of Completion 24 Hrs
Replacement/Servicing of NDE bearing of main vacuum pump. Time of Completion 06 Hrs
Replacement of DE/NDE gland of main pump. Time of Completion 02 Hrs
Alignment & adjustment of vacuum pump with motor. Time of Completion 06 Hrs
M/S AWAM ENGINEERING CO
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .