| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.6 LAccepted-AOC | 1 | Accepted-AOC Lowest Rate Quoted Tender Accepted | |
| 2 | 2₹4.8 L+₹20,790 (4.54%)Rejected-Finance | 2 | Rejected-Finance Highest Rate Quoted |
| Sl No | Description | Qty | Unit | Kannan Construction L1 | OVIYA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complying with Standard Specifications as per SS 20 A MORTH 24 & 25 | 75 | M3 | 246 ₹18,450 Lowest | 246 ₹18,450 Lowest |
| 2.00 | Plain Cement Concrete 1:4:8 Mix (one part of cement, four part of M.sand and eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with Standard Specifications as per TNDSS No. 28 V, VI (S2) V,VI (S5A) VII | 20.79 | M3 | 5,106 ₹1,06,153.74 Lowest | 6,106 ₹1,26,943.74 |
| 3.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part of sand and four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge. | 28 | M3 | 6,498 ₹1,81,944 Lowest | 6,498 ₹1,81,944 Lowest |
| 4.00Supplying and errecting steel centering to sides and soffits including supports and strutting for side wall sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification as per TNDSS No.30&86 (For Drain,Deck slab & Retainingwall) | |||||
| 4.01 | with struting | 172.2 | m2 | 512 ₹88,166.4 Lowest | 512 ₹88,166.4 Lowest |
| 4.02 | without struting | 6 | m2 | 512 ₹3,072 Lowest | 512 ₹3,072 Lowest |
| 5.00 | Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30 | 200 | kg | 89 ₹17,800 Lowest | 89 ₹17,800 Lowest |
| 6.00 | Reinforced Cement concrete 1:1 1/2:3 (One cement, one and half M.sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30) | 2 | m3 | 8,919 ₹17,838 Lowest | 8,919 ₹17,838 Lowest |
| 7.00 | Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete | 44 | M2 | 550 ₹24,200 Lowest | 550 ₹24,200 Lowest |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
18 Oct 2024, 3:00 pmClosed
Executive Officer
1/1, Vethakara Street, G.N.Palayam, Pudupalayam
Construction of Storm Water Drain at Veeranandal M.G.R. Nagar 1st Street,South Street 4th Street,South Street 5th Street in Pudupalayam Town Panchayat
2024_DTP_479337_3
136-2/2024
Open Tender
Civil Works
Works
90 days
Pudupalayam Town Panchayat
II Class
2 documents required · 2 mandatory
₹0
₹5,000
Pudupalayam Town Panchayat Office
16 Oct 2025
7 Oct 2024
18 Oct 2024
7 Oct 2024
18 Oct 2024
7 Oct 2024
7 Oct 2024 - 18 Oct 2024
7 Oct 2024
Amount
Earth work open excavation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. Complying with Standard Specifications as per SS 20 A MORTH 24 & 25
Plain Cement Concrete 1:4:8 Mix (one part of cement, four part of M.sand and eight part of aggrigate) using 40 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc. complete. Complying with Standard Specifications as per TNDSS No. 28 V, VI (S2) V,VI (S5A) VII
Plain Cement Concrete 1:2:4 Mix (one part cement, two part of sand and four part of aggrigate) using 20 mm size ISS HBG metal from approved quarry including cost and conveyance of all materials to site. Loading and unloading charges and labour charges for mixing. Laying and curing etc., complete as per TNDSS NO: 28 & VI (S2) VI (S5A) VII standard specifications as directed by Engineer incharge.
Supplying and errecting steel centering to sides and soffits including supports and strutting for side wall sides and culvert body wall sides using M.S Sheets of size 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spread at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete Complying with Standard Specification as per TNDSS No.30&86 (For Drain,Deck slab & Retainingwall)
with struting
without struting
Supplying, fabricating and placing in position mild steel or ribbed tor steel for all reinforced cement concrete works as per design given including cost of steel and binding wire with all conveyance and lead charges in all floors etc.complete complying with standard specifications and as directed by the deparmental engineers. TNBP No:30
Reinforced Cement concrete 1:1 1/2:3 (One cement, one and half M.sand and Three aggregate) using machine crushed 20mm gauge hard broken stone jelly for all RCC items of work excluding centering strutting, and reinforcement grills placed in position but including mixing concrete, laying and vibrations charges, curing, etc complete and including providing fixtures like fan clamps in the RCC floor or roof slabs wherever necessary etc. complete complying with standard specification( TNBP No:30)
Finishing the top of flooring with granolethic floor finish in cement concrete 1:2:4 mix using 10-12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
OVIYA CONSTRUCTIONS (BID ID -1167387)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_583986.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .