Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -29.00% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -27.70% | ₹1.4 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.7 LAdmitted-Fee/PreQual/Technical/Finance | -11.56% | ₹1.7 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | -2.00% | ₹1.9 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹5,880
Closing Date
17 Aug 2026, 4:00 pmClosed
EX ENGINEER REW KULGAM
EX ENGINEER REW KULGAM
C/O CULVATH NEAR LAND TARIQ MAGRAY AT KHRIWAN 408
2026_RDPR_319158_36
e- NIT No. 49 OF REWK/PRI/2026-27 Dated 04-08-2026
Open Tender
Civil Works
Percentage
40 days
KULGAM
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
CONSTRUCTION OF TILE LANE FROM H/O AB AHAD BHAT TO
₹5,880
26 Aug 2026
4 Aug 2026
19 Aug 2026
4 Aug 2026
17 Aug 2026
4 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (Exceeding 30 cm and upto 1.5 mtr in depth, ) including disposal of excavated earth upto 25 mtrs beyond 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed | 2.75 | cum | - | - |
| 2 | Providing and laying of stone soling tightly hand picked by tamping.incl. carriage by m.t lead 10 kms | 2.12 | cum | - | - |
| 3 | Providing and laying cement concrete of specified grade excluding the cost of centering & shuttering using M15 mix. (1:2:4) and by using 20 mm crushed aggregates | 6.49 | cum | - | - |
| 4 | Reinforced cement concrete work in beams, suspended floors, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3(1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 4.54 | cum | - | - |
| 5 | Formwork of ordinary timber planks for in situ concrete work. Abutts | 11.89 | sqm | 1 | ₹11.88 |
| 6 | sus. Floors | 20.7 | sqm | - | - |
| 7 | edges of slab | 15.84 | rm | 1 | ₹15.82 |
| 8 | P/F of steel reinforcement for R.C.C works incl. cutting,bending and placing in position - complete Job | 565.26 | kg | 1 | ₹564.69 |
| 9 | Dewatering/diversion of nallah during exc. Of work/site clearance | 10 | no | - | - |
| 10 | Carriage of sand/aggregates by MT for 15kms. | 15.04 | cum | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
BOQ_1056022.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].