Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAdmitted-Fee/PreQual/Technical/Finance 135 135A PALANISAMY TOWER DHARMARAJ LAYOUT SOWRIPALAYAM CROSS ROAD RAMANATHAPURAM COIMBATORE 641 045 | COIMBATORE | TAMIL NADU | 641045 | ₹6.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.0 L+₹19,464.80 (2.87%)Admitted-Fee/PreQual/Technical/Finance | ₹7.0 L+₹19,464.80 (2.87%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.1 L+₹32,283.09 (4.76%)Admitted-Fee/PreQual/Technical/Finance 52 GOVINDARAJAPATTINAM THAMARAINAGAR KANNANKURICHI SALEM 636030 | SALEM | SALEM | TAMIL NADU | 636030 | ₹7.1 L+₹32,283.09 (4.76%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹7.1 L+₹32,293.95 (4.76%)Admitted-Fee/PreQual/Technical/Finance | ₹7.1 L+₹32,293.95 (4.76%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹7.1 L+₹32,334.74 (4.76%)Admitted-Fee/PreQual/Technical/Finance NO 1 1 ANNA STREET ETHIRAJ NAGAR WEST MAMBALAM METTUPALAYAM CHENNAI 600 033 | CHENNAI | TAMIL NADU | 600033 | ₹7.1 L+₹32,334.74 (4.76%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | SRK CONSTRUCTIONS L5 | ARV AND CO L2 | TECTUS INFRA PVT LTD L1 | svasit Engineers L4 | S VIJAYAKUMAR L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 1 | m3 | 4,000 ₹3,992.5 | 2,500 ₹2,495.31 | 4,300 ₹4,291.94 | 925 ₹923.27 Lowest | 4,310.69 ₹4,302.61 |
| 2.00 | Desilting in the existing drain as per the direction of departmental officers etc. completed. | 23 | m3 | 100 ₹2,300 | 100 ₹2,300 | 96 ₹2,208 | 10.08 ₹231.84 Lowest | 108.93 ₹2,505.39 |
| 3.00 | Dismantling the damaged Cement Concrete work as per the instruction of Departmental officers. Including all initial lead and other labour charges | 13 | m3 | 450 ₹5,850 | 480 ₹6,240 | 395 ₹5,135 | 100 ₹1,300 Lowest | 486.42 ₹6,323.46 |
| 4.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 134 | m3 | 150 ₹20,099.25 | 100 ₹13,399.5 Lowest | 135 ₹18,089.33 | 180 ₹24,119.1 | 187 ₹25,057.07 |
| 5.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 39 | m3 | 5,000 ₹1,95,000 | 4,500 ₹1,75,500 Lowest | 4,760 ₹1,85,640 | 4,600 ₹1,79,400 | 5,068.12 ₹1,97,656.68 |
| 6.00 | Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 231 | m2 | 427 ₹98,637 Lowest | 450 ₹1,03,950 | 430 ₹99,330 | 460 ₹1,06,260 | 453.99 ₹1,04,871.69 |
| 7.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 39 | m3 | 6,000 ₹2,34,000 | 6,350 ₹2,47,650 | 5,700 ₹2,22,300 Lowest | 6,000 ₹2,34,000 | 5,713.39 ₹2,22,822.21 |
| 8.00 | Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 56 | m2 | 250 ₹14,000 | 100 ₹5,600 Lowest | 260 ₹14,560 | 280 ₹15,680 | 263.14 ₹14,735.84 |
| 9.00 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 19 | m3 | 6,500 ₹1,23,467.5 | 6,950 ₹1,32,015.25 | 5,800 ₹1,10,171 Lowest | 7,000 ₹1,32,965 | 6,176.89 ₹1,17,330.03 |
| 10.00 | Supply & Fixing of SFRC Manhole cover With frame 750mm x750 mm as per standard quality including of all materials and all labour charges for fixing in position etc.completeas Standard specification. | 1 | Nos | 2,003.75 ₹2,003.75 | 250 ₹250 Lowest | 3,100 ₹3,100 | 2,970 ₹2,970 | 2,525.38 ₹2,525.38 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
21 Sept 2026, 3:00 pmClosed
The Assistant Commissioner, Central zone
Central Zone Coimbatore Corporation
Reconstruction of Storm Water Drain and Cement Concrete Road at Krishnarayapuram in ward no 49, Central Zone , Coimbatore Corporation
2026_MAWS_701154_9
e3/2026 Central zone
Open Tender
Civil Works
Works
120 days
Coimbatore corporation-
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
22 Sept 2026
4 Sept 2026
22 Sept 2026
4 Sept 2026
21 Sept 2026
4 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling the damaged Reinforced Cement Concret slab as per the instruction of Departmental officers. Including all initial lead and other labour charges | 1 | m3 | - | - |
| 2 | Desilting in the existing drain as per the direction of departmental officers etc. completed. | 23 | m3 | - | - |
| 3 | Dismantling the damaged Cement Concrete work as per the instruction of Departmental officers. Including all initial lead and other labour charges | 13 | m3 | - | - |
| 4 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 c.u.m. in volume including rough dressing and dumping the excavated materials away from work site manually within 50m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 134 | m3 | - | - |
| 5 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate ) using 40mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 39 | m3 | - | - |
| 6 | Supplying and erecting Shuttering including necessary supports for plane surfaces such as Drain walls etc, using mild steel sheets of size 90x60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 231 | m2 | - | - |
| 7 | Cement concrete 1:3:6 (one cement, three sand and six aggregate ) using 20mm gauge hard broken granite stone jelly for All CC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing etc., complete fixtures in CC works wherever necessary as directed by departmental officer etc., complete. | 39 | m3 | - | - |
| 8 | Plastering with cement mortar 1:5 mix 12 mm thick ( one cement five sand) per direction of departmental officers etc. completed. | 56 | m2 | - | - |
| 9 | Plain Cement Concrete 1:2:4 (one cement, two Crushed Stone Sand (MSand) and four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 19 | m3 | - | - |
| 10 | Supply & Fixing of SFRC Manhole cover With frame 750mm x750 mm as per standard quality including of all materials and all labour charges for fixing in position etc.completeas Standard specification. | 1 | Nos | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
BOQ_842945.xls
BOQ • 0.26 MB
TD.pdf
Tender Documents • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .