Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.9 CrAccepted-AOC NA | NA | NA | 121004 | ₹2.9 Cr | 1 | Accepted-AOC Due to lower rate |
| 2 | 2₹3.0 Cr+₹5.4 L (1.83%)Rejected-AOC RGTPP KHEDAR HISAR HARYANA | HISAR | HARYANA | 125001 | ₹3.0 Cr+₹5.4 L (1.83%) | 2 | Rejected-AOC Due to higher rate |
| 3 | 3₹3.0 Cr+₹5.8 L (2.00%)Rejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹3.0 Cr+₹5.8 L (2.00%) | 3 | Rejected-AOC Due to higher rate |
| 4 | 4₹3.7 Cr+₹77.9 L (26.6%)Rejected-AOC HISAR PHE CIRCLE HARYANA | ₹3.7 Cr+₹77.9 L (26.6%) | 4 | Rejected-AOC Due to higher rate |
| 5 | 5₹3.7 Cr+₹81.4 L (27.8%)Rejected-AOC HSVP PANCHKULA | PANCHKULA | HARYANA | 133301 | ₹3.7 Cr+₹81.4 L (27.8%) | 5 | Rejected-AOC Due to higher rate |
Tender Value
₹3.2 Cr
EMD Value
₹6.4 L
Closing Date
26 May 2025, 3:00 pmClosed
EXECUTIVE ENGINEER
Narwana PHED
Augmentation/Renovation of water supply scheme and Strengthening of distribution system
2025_HRY_447034_1
20250825F704 7FBE 4069 A30E 69680CB38BA3570PUH
Open Tender
Civil Works
Works
425 days
DHAROUDI
4 documents required · 4 mandatory
₹15,000
₹6.4 L
Yes
29 Jul 2025
15 May 2025
26 May 2025
15 May 2025
26 May 2025
15 May 2025
Amount
Supply, erection, testing of reputed make LED light 100 watts with fitting, wiring and accessories complete in respects.
Less credit of Old Bricks.............
Less credit of Old Bricks bats......
Provision for construction of 1 No. Toilet at water works / boosting station including cost of material, labour, loading unloading carriage etc. complete in all respect.....
Supplying, Errection, testing and commissioning Horizontal motor pumping set of Raw water having head 12.00 m as requirements of discharge 700 LPM and power capacity 5.00 BHP as ISI Marked
credit of old steel
Operation and Maintenance of Independent Canal based water works for complete scope of work including distribution system mentioned in the DNIT in the village (Disinfection material supplied by the PHED as per schedule-IV) for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
Himmat Singh Contractor (GSTN-NA) BID ID -1268285
SURENDER CONT (GSTN-NA) BID ID -1268245
KAILASH SINGLA CONTRACTOR (GSTN-NA) BID ID -1267364
ROHTASH KUMAR CONTRACTOR (GSTN-NA) BID ID -1267572
NAFE SINGH CONTRACTOR (GSTN-NA) BID ID -1268134
Himmat Singh Contractor (BID ID -1268285)
NAFE SINGH CONTRACTOR (BID ID -1268134)
KAILASH SINGLA CONTRACTOR (BID ID -1267364)
ROHTASH KUMAR CONTRACTOR (BID ID -1267572)
Himmat Singh Contractor (BID ID -1268285)
SURENDER CONT (BID ID -1268245)
KAILASH SINGLA CONTRACTOR (BID ID -1267364)
ROHTASH KUMAR CONTRACTOR (BID ID -1267572)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .