Tender Value
₹98,600
EMD Value
₹4,930
Closing Date
7 Sept 2026, 6:55 pm
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
development of graveyard BWO raising and filling near water tankey pethpora Razwen
2026_RDPR_321979_50
NIT_55_REW_Budgam_2026_27
Open Tender
Civil Works
Percentage
30 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹4,930
24 Aug 2026
24 Aug 2026
8 Sept 2026
24 Aug 2026
7 Sept 2026
24 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0_) | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed in all kinds of soil, with disposal lead upto 1 m from cutting edge | 3.09 | Cum | 479.3 | ₹1,481.04 |
| 0_) | Providing/Laying Stone soling Nallah/Plum hand packed on level in foundation trenches including carriages of Stones | 2.95 | Cum | 1,105.35 | ₹3,260.78 |
| 0_) | P/L in position cement concrete of 1:3:6 Nominal mix including curing but excluding the cost of centering and shuttering. All work upto plinth level (1 Cement :3 F.A.(Natural/M-Sand) :6 C.A. ) with 20mm aggregate | 7.72 | Cum | 5,733.6 | ₹44,263.39 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. | 50.65 | Sqm | 286.35 | ₹14,503.63 |
| 0_) | 12 mm thick pluster in 1:6 mix cement mortar | 25.33 | Sqm | 266.2 | ₹6,742.85 |
| 0_) | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer wooden or steel rammers, and rolling every 3rd and top-most layer and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil including carriage upto 5km. | 30.58 | Cum | 722.82 | ₹22,103.84 |
| 0_) | Carriage of Stone aggregate for 20 kmts | 6.95 | Cum | 409.94 | ₹2,849.08 |
| 0_) | Carriage of Sand for 10 kmts | 3.47 | Cum | 279.04 | ₹968.27 |
| 0_) | Add provisions for signboard, Photographes ,carriage of cement ,steel and other unforseen items. | 1 | No | 2,420.12 | ₹2,420.12 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.08 MB
BOQ_1077029.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].