| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹16.9 L+₹2.1 L (13.9%)Accepted-Finance 248 1 CHHEDIPURWA STATION ROAD BEHIND GURU NANAK SCHOOL GONDA UTTAR PRADESH 271001 | GONDA | UTTAR PRADESH | 271001 | L2 | Accepted-Finance Accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹15.2 L
EMD Value
₹16,000
Closing Date
25 Aug 2023, 5:00 pmClosed
se edc
sonbhadra
Construction of New 11/0.4 KV Sub-station
2023_PVVNV_825971_1
63/edc(so)/2023-24
Open Tender
Electrical Works
Item Rate
90 days
sonbhadra
Pleased Ref Tender Doc.
2 documents required · 2 mandatory
₹3,540
SE EDC SONEBHADRA Bank A/c No.089105000853
₹16,000
4 Oct 2023
2 Aug 2023
26 Aug 2023
2 Aug 2023
25 Aug 2023
2 Aug 2023
Centralized Materials of following materials as per RESSPO/PuVVNL norms at the work site provided by Store Centar Robertsganj
ST pole 11 Mtr Long
PCC Pole 805 Mtr Long
Top Channel MS 125x65x2240 mm Long
M.S. Channel 125x65x1300 mm (T-off)
M.S.Channel Dropper100x50x6mm 2028mm Long
MS Angle 75x75x6,2080mm.with Clampe & boltand Nut (TF Base)
Weasel conductor ACSR
11 K.V. Disc Insulator T&C Type 4500Kg. With Fitting
11 K.V. Pin Insulator With pin
LT PVC Cable Al. 1 X 240 Sq mm
LT PVC Cable Al. 1 X 400 Sq mm
V type Cross Arm
Stay Complete
Earthing Complete
10 KVA Three Phase T/F, 11/0.4 KV
25 KVA Three Phase T/F, 11/0.4 KV
63 KVA Three Phase T/F, 11/0.4 KV
100 KVA Three Phase T/F, 11/0.4 KV
250 KVA Three Phase T/F, 11/0.4 KV
250 KVA Three Phase T/F, 11/0.4 KV Trolly
400 KVA Three Phase T/F, 11/0.4 KV Trolly
Decenterlized Material Provided by Contractor
Cross Arm Holding Clamp With Nut & Bolt
Danger Board With Nut & Botlts
Stone Pade (300x300x75)mm
F- Bracket With Nut & Bolt
Barbed Wire
Top, T-Off & Cross Brassing Asngle Clamp With Nut & Bolt
10 KVA holding clamp
Al. Lug
LT clamp
Work of following material as per Respo/Puvvnl norms at the work site.
Erection of Sectional Double Pole Structure of ST pole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & other required works.
Installation of 10 KVA Three Phase T/F, 11/0.4 KV
Installation of 25 KVA Three Phase T/F, 11/0.4 KV on DP
Installation of 63 KVA Three Phase T/F, 11/0.4 KV on DP
Installation of 100 KVA Three Phase T/F, 11/0.4 KV on DP
Installation of 250 KVA Three Phase T/F, 11/0.4 KV on DP
Installation of 250 KVA Three Phase T/F, 11/0.4 KV on DP Trolly
Installation of 400 KVA Three Phase T/F, 11/0.4 KV on DP Trolly
Plinth for size 2x2x1.5 M
Earthing Complete
LT PVC Cable Al. 1 X 240 Sq mm
LT PVC Cable Al. 1 X 400 Sq mm
Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost)
making of trolly for Trolly TF
M/S SMM INFRATECH PVT Ltd
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .