Construction of Kitchen Shed at O.Koothur PUM School in Ottakovil Panchayat in Package No.TN 30-06 in Ariyalur Block of Ariyalur District under RCSIDS 2019-20
2020_RDTN_165161_1
A4/77/2020,Dated.20.05.2020
Open Tender
Civil Works - Buildings
Works
180 days
DRDA
As per Tender Document
4 documents required · 4 mandatory
₹0
₹4,600
18 Jun 2020
28 May 2020
5 Jun 2020
28 May 2020
5 Jun 2020
28 May 2020
Amount
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth, earth mixed with small sized boulders and hard gravelly soil as per SS 20B for foundation
Filling in basement with excavated earth in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Supplying and filling in foundation and basement with filling sand in layers of not more than 15cm thick well rammed watered and compacted etc., complete complying with standard specification.
Plain Cement concrete 1:4:8 (one cement, four sand, eight aggregate) using 40mm gauge hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15cm thick and compacted,etc., complete complying with standard specification.
Reinforced Cement concrete 1:1.5 :3 (one cement,one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete as directed by departmental officer etc., complete.
Brick work in CM 1:5 (one cement & five sand) using III class Country bricks of size 8 3/4"X41/4"X 2 1/4" including finishing, curing, etc., complete complying with standard specification
Plastering with cement mortar 1:3 (One Cement, three Sand) 10mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications.
Plastering with cement mortar 1:5 (One Cement, Five Sand) 12mm thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications.
Painting two coats of new plaster surface with Exterior emulsion paint including cost and conveyance of paint and all labour charges etc complete
Painting two coats over new iron works using ready mixed enamel paintincluding cost and conveyance of paint and all labour charges etc complete
Providing Granolethic floor finish in cement concrete 1:2:4 mix using 10 -12mm ISS metal to 25mm thick including cost and conveyance of all materials to site and all labour charges for mixing, laying, curing etc complete
Weathering course concrete using 20mm brick jelly with slacked lime in the ratio of 32:12.5 including cost and conveyance of all materials to site and all labour charges for mixing , laying ,and finishing etc complete
Finishing the top of roof with one course of pressed tiles of size 20x20x2cm with cement mortar 1:3 mix and pointed with the same oiled mortar including cost and conveyance of all materials to site and all labour charges etc complete
Cost and supply of Steel door of size 0.90x2.10m
Cost and supply of Steel window of size 1.20x1.30m
Cost and supply of Glazed Ventilator of size 0.90x0.45m
Labour charges for fixing doors along with frames in position etc., Complete
Labour charges for fixing windows along with frames in position etc., Complete
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Column)
Supplying and erecting steel centering for sides and soffits etc complete complying with standard specifications.(Lintel beam, Roof)
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors as per standard specification.
Cost and supply of Cuddapah slab 20/30mm thick
Supplying and fixing P.V.C rainwater down fall pipe of 110mm dia with necessary shoes, bends,& clamps etc., Complete
Supplying and filling the RWH with brick jelly including cost and conveyance of all materials to site and all labour charges etc., complete
Provision for Name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
G.MURUGAN
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .