Loading…
Loading…
Tender Value
₹13.7 L
EMD Value
₹27,400
Closing Date
17 Sept 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
CARRIAGE
12 conditions · 1 needing a document upload
Please submit a certicate in the prescribed format (please download theformat from the link given below) for verication / conrmation of thedocuments submitted for compliance of eligibility / qualifying criteria.Non submission of the certicate, or submission of certicate either notproperly lled in, or in a format other than the prescribed format shall leadto summary rejection of your oer. ( Click here to download the Format ofSelf Certification
I/we the tenderer (s) am/are signing this document after carefully reading the contents.
I/We the tenderer(s) also accept all the conditions of the tender and have signed all the pages in confirmation thereof.
I/we hereby declare that I/we have downloaded the tender documents from Indian Railway website www.ireps.gov.in . I/we have verified the content of the document from the website and there is no addition, no deletion or no alteration to the content of the tender document. In case of any discrepancy noticed at any stage i.e. evaluation of tenders, execution of work or final payment of the contract, the master copy available with the railway Administration shall be final and binding upon me/us.
I/we declare and certify that I/we have not made any misleading or false representation in the forms, statements and attachments in proof of the qualification requirements.
I/We also understand that my/our offer will be evaluated based on the documents/credentials submitted along with the offer and same shall be binding upon me/us.
I/We declare that the information and documents submitted along with the tender by me/us are correct and I/we are fully responsible for the correctness of the information and documents, submitted by us.
I/we certify that I/we the tenderer(s) is/are not blacklisted or debarred by Railways or any other Ministry / Department of Govt. of India from participation in tender on the date of submission of bids, either in individual capacity or as a HUF/ member of the partnership firm/LLP/JV/Society/Trust.
I/we understand that if the contents of the certificate submitted by us are found to be forged/false at any time during process for evaluation of tenders, it shall lead to forfeiture of the Bid Security and may also lead to any other action provided in the contract including banning of business for a period of upto two year. Further, I/we and all my/our constituents understand that my/our offer shall be summarily rejected.
I/we also understand that if the contents of the certificate submitted by us are found to be false/forged at any time after the award of the contract, it will lead to termination of the contract, along with forfeiture of Bid Security/Security Deposit and Performance guarantee and may also lead to any other action provided in the contract including banning of business for a period of upto two year.
I/We have read the clause regarding restriction on procurement from a bidder of a country which shares a land border with India and certify that I am/We are not from such a country or, if from such a country, have been registered with the competent Authority. I/We hereby certify that I/we fulfil all the requirements in this regard and am/are eligible to be considered (evidence of valid registration by the competent authority is enclosed)
9 conditions · 4 needing a document upload
Please Submit your bank details
All the bidders/tenders should ensure that they are GSTcomplaint and their quoted tax structure/rates are as per GSTLaw.(Please upload certificate of GSTIN registration)
At the time of submission of bid, if you have any specialcondition then upload in scanned PDF copy. However , TheRailway shall have the right to incorporate any such conditionquoted by Tenderer, in the contract, at its discretion
Please enter the percentage of local content in the materialbeing oered. Please enter 0 for fully imported items, and 100 forfully indigenous items. The denition and calculation of localcontent shall be in accordance with the Make in India policy asincorporated in the tender conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
GENERAL CONDITIONS OF CONTRACT: In cases of matter whichare not specied herein, INDIAN RAILWAYS GENERAL CONDITIONSOF CONTRACT GOR WORKS, APRIL 2022 with up- todatecorrections/amendments/ revisions at any point of time will befollowed. However, there will be overall bindings of IR's GCCW,2022 up-to-date corrections slips/amendments/revisions at anypoint of time over the entire tendering process and the entirecontract
SECURITY DEPOSIT: The Security Deposit shall be 5% of thecontract value. Security Deposit may be deposited by theContractor before release of rst on account bill in cash or TermDeposit Receipt issued from Scheduled Bank, or may berecovered at the rate of 6% of the bill amount till the fullSecurity Deposit is recovered. Provided also that in case ofdefaulting Contractor, the Railway may retain any amount duefor payment to the Contractor on the pending "on account bills"so that the amounts so retained (including amount guaranteedthrough Performance Guarantee)
Performance Guarantee: The procedure for obtainingPerformance Guarantee is outlined below: (a) The successfulbidder shall have to submit a Performance Guarantee (PG)within 21 (Twenty one) days from the date of issue of Letter ofAcceptance (LOA). Extension of time for submission of PGbeyond 21 (Twenty one) days and up to 60 days from the date ofissue of LOA may be given by the Authority who is competent tosign the contract agreement. However, a penal interest of 12%per annum shall be charged for the delay beyond 21(Twentyone) days, i.e. from 22nd day after the date of issue of LOA.Further, if the 60th day happens to be a declared holiday in theconcerned office of the Railway, submission of PG can beaccepted on the next working day. In all other cases, if theContractor fails to submit the requisite PG even after 60 daysfrom the date of issue of LOA, the contract is liable to beterminated. In case contract is terminated railway shall beentitled to forfeit Bid security Deposit and other dues payableagainst that contract. In case a tenderer has not submitted Bidsecurity Deposit on the strength of their registration as a Startuprecognized by Department of Industrial Policy and Promotion(DIPP) under Ministry of Commerce and Industry, DIPP shall beinformed to this effect. The failed Contractor shall be debarredfrom participating in re-tender for that work. (b) The successfulbidder shall submit the Performance Guarantee (PG) amountingto 5% of the original contract value and additional PerformanceGuarantee as per clause 16(4)(h) in any of the following forms,:(i) A deposit of Cash; (ii) Irrevocable Bank Guarantee; (iii)Insurance Surety Bond as per Annexure-XVII Note:- In case ofextension of Date of Completion, Selected bidder needs tosubmit extended insurance Surety Bond/Fresh Insurance SuretyBond/fresh Performance Security, in any form as given above,before expiry of existing Insurance Surety Bond. (iv)Government Securities including State Loan Bonds at 5% belowthe market value; (v) Pay Orders and Demand Drafts tenderedby any Scheduled Commercial Bank of India; (vi) GuaranteeBonds executed or Deposits Receipts tendered by all ScheduledCommercial Banks of India; (vii) Deposit in the Post Office SavingBank; (viii) Deposit in the National Savings Certificates; (ix)Twelve years National Defence Certificates; (x) Ten yearsDefence Deposits; (xi) National Defence Bonds and (xii) UnitTrust Certificates at 5% below market value or at the face valuewhichever is less. Also, FDR in favour of FA & CAO, EasternRailway, Kolkata (free from any encumbrance) may be accepted.
The Performance Guarantee shall be submitted by thesuccessful bidder after the Letter of Acceptance (LOA) has beenissued, but before signing of the contract agreement. This P.G.shall be initially valid up to the stipulated date of completion plus60 days beyond that. In case, the time for completion of workgets extended, the Contractor shall get the validity of P.G.extended to cover such extended time for completion of workplus 60 days. (d) The value of PG to be submitted by theContractor is based on original contract value and shall notchange due to subsequent variation(s) in the original contractvalue. (e) The Performance Guarantee (PG) shall be releasedafter physical completion of the work based on 'CompletionCertificate' issued by the competent authority stating that theContractor has completed the work in all respects satisfactorily.( f ) Whenever the contract is rescinded, the PerformanceGuarantee already submitted for the contract shall be en-cashedin addition to forfeiture of Security Deposit available withrailway. (g) The Engineer shall not make a claim under thePerformance Guarantee except for amounts to which thePresident of India is entitled under the contract (notwithstanding and/or without prejudice to any other provisions inthe contract agreement) in the event of: (i)Failure by theContractor to extend the validity of the Performance Guaranteeas described herein above, in which event the Engineer mayclaim the full amount of the Performance Guarantee. (ii) Failureby the Contractor to pay President of India any amount due,either as agreed by the Contractor or determined under any ofthe Clauses/Conditions of the Agreement, within 30 days of theservice of notice to this effect by Engineer. (iii) The Contractbeing determined or rescinded under clause 62 of theseconditions. (h) If a tender is accepted on the quoted rates ofbidder which is below the advertised tender value, an additionalperformance security shall be submitted by the bidder as below:Bid quoted in % of advertised cost below 0-5% (inclusive)theAdditional Performance Guarantee (%) is Nil. Bid quoted in % ofadvertised cost below5% the Additional Performance Guarantee(%) is 5%
Provision of Wheel wise Load Measurement By EIMWB for NACC & NH Weigh Bridge
MC_WC_EIMWB_26~ER
MC_WC_EIMWB_26
Single
Works - General
6 Months
Kolkata, West Bengal
₹0
₹27,400
17 Sept 2026
26 Aug 2026
3 Sept 2026
11 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 5,80,000 | ||
| Upgradation of In-Motion Weigh Bridge Indicator with 140T to comply with wheel wise load measurement (Development + Hardware+ Firmware) | — | — | — | 4,50,000 | |
| Commissioning charges | — | — | — | 80,000 | |
| One time stamping and Freight Charges | — | — | — | 50,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
tenderdocument.pdf
ATTACHMENT
2022_13.12.2022-
ATTACHMENT
LetterofCredit.pdf
ATTACHMENT
GCC_WorksApril-2022_13.12.2022-Ammendment-NEW.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .