Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC VILLAGE SAHARNA | ₹1.6 Cr | L1 | Accepted-AOC due to low rate |
| 2 | L2₹1.7 Cr+₹6.7 L (4.25%)Rejected-Finance | ₹1.7 Cr+₹6.7 L (4.25%) | L2 | Rejected-Finance Rejected due to high rate. |
| 3 | L3₹1.7 Cr+₹10.0 L (6.32%)Rejected-Finance FAZILKA | FAZILKA | PUNJAB | 152020 | ₹1.7 Cr+₹10.0 L (6.32%) | L3 | Rejected-Finance Rejected due to high rate. |
| Sl No | Description | Qty | Unit | VIJAY KUMAR GARG CONTRACTOR L2 | M/s Brother Buildcon L3 | HARBANT SINGH CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods | 5,894.21 | Cum | 81 ₹4,77,431.01 | 64 ₹3,77,229.44 | 35 ₹2,06,297.35 Lowest |
| 2.00 | Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods. | 8,106.94 | Cum | 63 ₹5,10,737.22 Lowest | 109 ₹8,83,656.46 | 70 ₹5,67,485.8 |
| 3.00 | Dressing of New Earthwork | 47,577.36 | Sqm | 0.3 ₹14,273.21 Lowest | 1 ₹47,577.36 | 1 ₹47,577.36 |
| 4.00 | Re-handling of earthwork recently executed | 5,894.21 | Cum | 20 ₹1,17,884.2 Lowest | 64 ₹3,77,229.44 | 25 ₹1,47,355.25 |
| 5.00 | Dag belling single kassi stroke minimum 7.5 cm depth. | 22.41 | KM | 100 ₹2,241 Lowest | 848 ₹19,003.68 | 848 ₹19,003.68 |
| 6.00 | Dismantling Brick Work in Cement | 1,310.03 | Cum | 718 ₹9,40,601.54 | 718 ₹9,40,601.54 | 500 ₹6,55,015 Lowest |
| 7.00 | Dressing of Bed and Preparation of Sub-grade for Lining | 9,264.04 | Sqm | 11 ₹1,01,904.44 Lowest | 11 ₹1,01,904.44 Lowest | 11 ₹1,01,904.44 Lowest |
| 8.00 | First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls | 2,141.55 | Cum | 5,800 ₹1,24,20,990 | 5,670 ₹1,21,42,588.5 Lowest | 5,670 ₹1,21,42,588.5 Lowest |
| 9.00 | 10 mm thick Cement Plaster 1:4 on Side Walls | 6,287.06 | Sqm | 172 ₹10,81,374.32 Lowest | 172 ₹10,81,374.32 Lowest | 172 ₹10,81,374.32 Lowest |
| 10.00 | 10 mm thick Cement Plaster 1:4 on Floors | 6,457.02 | Sqm | 132 ₹8,52,326.64 Lowest | 132 ₹8,52,326.64 Lowest | 132 ₹8,52,326.64 Lowest |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
3 Jul 2025, 12:00 pmClosed
Executive Engineer,
Executive Engineer, Bathinda Canal and ground water division, bathinda
Estimate for Relining Water Course of Outlet RD 112910/L of Kotbhai Disty
2025_WR_142577_2
17/22A/2025-26
Open Tender
Civil Works - Canal
Item Rate
Bathinda
Please refer Tender documents.
3 documents required · 3 mandatory
₹1.6 Cr
Yes
₹3.3 L
Yes
21 Aug 2025
16 Jun 2025
3 Jul 2025
16 Jun 2025
3 Jul 2025
16 Jun 2025
Amount
Earthwork Undressed involving an avg. horizontal throw upto 2 mtr. and an avg. Vertical Lift upto 0.5 mtr. including Breaking of Clods
Earthwork Undressed with combined Lead upto 15 mtr. including Breaking of clods.
Dressing of New Earthwork
Re-handling of earthwork recently executed
Dag belling single kassi stroke minimum 7.5 cm depth.
Dismantling Brick Work in Cement
Dressing of Bed and Preparation of Sub-grade for Lining
First Class Burnt Brick laid in 1:6 Cement Sand Mortar for Bed & Side walls
10 mm thick Cement Plaster 1:4 on Side Walls
10 mm thick Cement Plaster 1:4 on Floors
RCC work hand mixed 1:2:4 for slab including steel reinforcement
Shuttering for faces of Concrete foundations and foundation beam & plinth beam (Vertical or battering)
Fixing of frame
Supplying & Laying Dry Brick Bats
VIJAY KUMAR GARG CONTRACTOR (BID ID -657386)
M/s Brother Buildcon (BID ID -656802)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .