| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 CrAdmitted-Finance | ₹6.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹7.5 Cr+₹84.2 L (12.7%)Admitted-Finance 803 SATELLITE SHAPATH 1 SARKHEJ GANDHINAGAR HIGHWAY 902 VILLAGE TOWN SATELLITE CITY AHMEDABAD AHMEDABAD GUJARAT 380015 INDIA | AHMADABAD | GUJARAT | 380015 | ₹7.5 Cr+₹84.2 L (12.7%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical RAJENDRA NAGAR KUNWAR SINGH ROAD NEAR SRIJAN APARTMENT NEW ULIDIH MANGO JAMSHEDPUR EAST SINGHBHUM PIN 8310102 | 8310102 | - | - | Rejected-Technical Decision |
| 4 | Rejected-Technical | - | - | Rejected-Technical Decision |
| Sl No | Description | Qty | Unit | Hardware tools and machinery projects pvt ltd L2 | HETVI INFRAPROJECTS PVT. LTD. L1 |
|---|---|---|---|---|---|
| 1.00 | (a)Overhauling of the rope drums, lubricating of wire rope Applying cardium compound servo coal C-120/320 of all radial gates,CLMC emergency gates and sluice gates of RL 164.Through inspection of bearings (greasing of the bearing), tightening or replacement of fixing clamps if required, replacement of damaged wire ropes, nut bolts wherever requied. Checking the Alignment of wire rope. complete job as per specification and direction of E/I..(b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS) | 1 | Job | 58,50,000 ₹58,50,000 | 45,54,000 ₹45,54,000 Lowest |
| 2.00 | (a)Maintenance Works of Central drive assembly of hoisting arrangements of all radial gates,CLMC emergency gates and sluice gates of RL 164 m .One Job includes: (i) Decoupling of motor & worm shaft. (ii) Dismantling of Inspection cover. (iii) Dismantling of all the bearing covers. (iv) Draining of contaminated oil form the Oil chamber. (v) Dismantling and Removal of top cover Gear box of central drive Assembly (vi) Cleaning and Inspection of all the Gears, Gearings and Oil seals. (vii) Greasing of all bearing and refitting of Bearing covers. (viii) Refitting of top cover of Gear box and Filling the fresh oil up to the required level. (ix) Alignment of Motor and Worm shaft Re-Coupling and greasing. (x) overhauling of motors including painting of complete motor housing structure. Refitting of Inspection cover after Replacement of Rubber gasket. complete job as per specification and direction of E/I. (b).5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS) | 1 | Job | 34,50,000 ₹34,50,000 | 34,11,000 ₹34,11,000 Lowest |
| 3.00 | Maintenance work of End gears of rope Drum of hoisting arrangements of all radial gates,CLMC emergency gates and sluice gates of RL 164 m ,one job includes: (a) Dismantling of Inspection cover. (b) Greasing of the all gears. (c)Refitting of Inspection cover .complete job as per specification and direction of E/I. (d)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS) | 1 | Job | 34,00,000 ₹34,00,000 | 33,75,000 ₹33,75,000 Lowest |
| 4.00 | (a)Brake Adjustment of the Central drive unit of hoisting arrangements of all radial gates,CLMC emergency gates and sluice gates of RL 164 m (i) Removal of cover of Brake Assembly. (ii) Cleaning of the Brake Drum using Fine & medium emery paper. (iii) Cleaning of the Brake shoes using Petrol only. (iv) Tightening of the foundation bolts of brake assembly (v) Adjustment of the Brakes & Trial Retightening of check nut for any slip. (vi) If required Replacement of Brake shoe liner By removal of old liner, drilling holes in new liner and riveting. Readjustment of brakes. (Liner and copper rivets shall be arranged be firm) Refitting of cover.complete job as per specification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS) | 1 | Job | 25,00,000 ₹25,00,000 | 21,42,000 ₹21,42,000 Lowest |
| 5.00 | (a)Maintenance work of all trunnions: (i) tightness checking for nut , bolts of trunnion block assembly and its anchorages. (ii) Removal of dirt, grit etc. from trunnion assembly. (iii)Lubrication of trunnion bearing with water resisting grease ( SKF LGHC2 or of similar nature). complete job as per specification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS) | 1 | Job | 31,00,000 ₹31,00,000 | 29,61,000 ₹29,61,000 Lowest |
| 6.00 | (a)Painting and rubber seal changing of CLMC emergency gates for smooth and leak proof operation.complete job as per specification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS). | 1 | Job | 17,80,000 ₹17,80,000 Lowest | 18,81,000 ₹18,81,000 |
| 7.00 | (a)Repair, Maintenance and overhauling of CLMC service gates and sluice gates RL 152 m with all hoisting arrangements (including hydraulic power pack system) complete job as per specification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS) | 1 | Job | 36,00,000 ₹36,00,000 | 28,44,000 ₹28,44,000 Lowest |
| 8.00 | (a)Inspection and maintenance of all electrical equipment’s of hoisting arrangements of all radial gates,CLMC emergency gates and sluice gates of RL 164 as perspecification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS) | 1 | Job | 24,32,000 ₹24,32,000 Lowest | 85,59,000 ₹85,59,000 |
| 9.00 | (a)Inspection and maintenance of all electrical connections,panels and wiring of all gates for smooth operation either from electricity or supply from DG set as per specification and direction of E/I . ( FOR THREE YEARS) This job must include : (i)Replacement of damaged armoured XLPE cable 120mm2 (4 core) of 200 kva D.G. set from dam control room to CLMC emergency gate.(for one time) (ii)Replacement of damaged armoured XLPE cable 50mm2 (4 core) from panel at guard room to CLMC service gate. (for one time) (ii)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS) | 1 | Job | 35,50,000 ₹35,50,000 Lowest | 42,21,000 ₹42,21,000 |
| 10.00 | (a)Supply , fitting , fixing of missing counter weight slab of sluice gate of RL 164m and required reinforcement work as per specification and direction of E/I . (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS) | 1 | Job | 75,50,000 ₹75,50,000 | 27,72,000 ₹27,72,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹2 L
Closing Date
20 Dec 2021, 5:00 pmClosed
EXECUTIVE ENGINEER
Executive Engineer, Subernrekha Dam Division No. 2, Chandil
Pre-monsoon and During monsoon maintenance works at Dam site consisting of hoist assemble (radial gates, canal gates, under sluice gates) and gantry crane at Chandil Dam .
2021_WRD_54008_1
WRD/SMP/SDD-2CHANDIL/NIQ-1
Open Tender
Repair and Maintenance Works
EOI
365 days
Chandil
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹2 L
Yes
1 Apr 2022
6 Dec 2021
23 Dec 2021
6 Dec 2021
20 Dec 2021
6 Dec 2021
Amount
(a)Overhauling of the rope drums, lubricating of wire rope Applying cardium compound servo coal C-120/320 of all radial gates,CLMC emergency gates and sluice gates of RL 164.Through inspection of bearings (greasing of the bearing), tightening or replacement of fixing clamps if required, replacement of damaged wire ropes, nut bolts wherever requied. Checking the Alignment of wire rope. complete job as per specification and direction of E/I..(b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Maintenance Works of Central drive assembly of hoisting arrangements of all radial gates,CLMC emergency gates and sluice gates of RL 164 m .One Job includes: (i) Decoupling of motor & worm shaft. (ii) Dismantling of Inspection cover. (iii) Dismantling of all the bearing covers. (iv) Draining of contaminated oil form the Oil chamber. (v) Dismantling and Removal of top cover Gear box of central drive Assembly (vi) Cleaning and Inspection of all the Gears, Gearings and Oil seals. (vii) Greasing of all bearing and refitting of Bearing covers. (viii) Refitting of top cover of Gear box and Filling the fresh oil up to the required level. (ix) Alignment of Motor and Worm shaft Re-Coupling and greasing. (x) overhauling of motors including painting of complete motor housing structure. Refitting of Inspection cover after Replacement of Rubber gasket. complete job as per specification and direction of E/I. (b).5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
Maintenance work of End gears of rope Drum of hoisting arrangements of all radial gates,CLMC emergency gates and sluice gates of RL 164 m ,one job includes: (a) Dismantling of Inspection cover. (b) Greasing of the all gears. (c)Refitting of Inspection cover .complete job as per specification and direction of E/I. (d)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Brake Adjustment of the Central drive unit of hoisting arrangements of all radial gates,CLMC emergency gates and sluice gates of RL 164 m (i) Removal of cover of Brake Assembly. (ii) Cleaning of the Brake Drum using Fine & medium emery paper. (iii) Cleaning of the Brake shoes using Petrol only. (iv) Tightening of the foundation bolts of brake assembly (v) Adjustment of the Brakes & Trial Retightening of check nut for any slip. (vi) If required Replacement of Brake shoe liner By removal of old liner, drilling holes in new liner and riveting. Readjustment of brakes. (Liner and copper rivets shall be arranged be firm) Refitting of cover.complete job as per specification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Maintenance work of all trunnions: (i) tightness checking for nut , bolts of trunnion block assembly and its anchorages. (ii) Removal of dirt, grit etc. from trunnion assembly. (iii)Lubrication of trunnion bearing with water resisting grease ( SKF LGHC2 or of similar nature). complete job as per specification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Painting and rubber seal changing of CLMC emergency gates for smooth and leak proof operation.complete job as per specification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS).
(a)Repair, Maintenance and overhauling of CLMC service gates and sluice gates RL 152 m with all hoisting arrangements (including hydraulic power pack system) complete job as per specification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Inspection and maintenance of all electrical equipment’s of hoisting arrangements of all radial gates,CLMC emergency gates and sluice gates of RL 164 as perspecification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Inspection and maintenance of all electrical connections,panels and wiring of all gates for smooth operation either from electricity or supply from DG set as per specification and direction of E/I . ( FOR THREE YEARS) This job must include : (i)Replacement of damaged armoured XLPE cable 120mm2 (4 core) of 200 kva D.G. set from dam control room to CLMC emergency gate.(for one time) (ii)Replacement of damaged armoured XLPE cable 50mm2 (4 core) from panel at guard room to CLMC service gate. (for one time) (ii)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Supply , fitting , fixing of missing counter weight slab of sluice gate of RL 164m and required reinforcement work as per specification and direction of E/I . (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
Assistance in attending various defects during running Maintenance of gear boxes, crane, centre drive assembly, Limit Switches, wire ropes etc. during monsoon. Under this scope you will have to depute three Nos. semiskilled and two Nos. skilled fitter for any job of maintenance as and when the requirement arises during full monsoon period .complete job as per specification and direction of E/I.( FOR THREE YEARS)
(a)Draining of contaminated oil and filling of fresh oil in the gear box of hoisting arrangements of Gantry crane. .( FOR THREE YEARS) The Job includes: (i) Making platform for safe working. (ii) Draining of contaminated oil. (iii) Dismantling of Inspection cover of central gear box, 01 no. and End assembly gear boxes, 02 Nos. (iv) Decoupling of motor worm shaft. (v) Inspection of gears, bearings, greasing, filing of the fresh oil and box up of the inspection covers after replacements of their gaskets. (vi) Alignment of the motor-worm shaft and Re coupling and Greasing. Dismantling of Platform.complete job as per specification and direction of E/I. (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Checking of the tightness of clamps of wire ropes of hoisting arrangements and application of Servo coat C 120/140/320 Cardium compound on the entire wire ropes after making platform for safe working and removal of platform after completion of work complete job as per specification and direction of E/I. .( FOR THREE YEARS) (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period..( FOR THREE YEARS)
(a)Replacement of gantry hoist junction(panel) box..( FOR ONE YEAR) (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Inspection and maintenance of all electrical equipments and electrical connections and wireing Repair/Rplacement of AB Switch of gantry crane for smooth operation as per specification and direction of E/I . .( FOR THREE YEARS) (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)overhauling with Painting of 200KVA DG SET .( FOR THREE YEARS) (b) Supply of 02 nos. of new tubular battery for D.G. set complete job as per specification and direction of E/I. .( FOR ONE YEARS) (c)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Repair ,overhauling and Maintenance of 50 Ton Capacity Lift system installed in Chandil Dam , panels, MCB, all cables , Changing of wire ropes ,rope drum , motors etc if required. Complete Job ,as per specification and direction of E/I. .( FOR THREE YEARS) (b) 5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Repair of 500KVA (02 nos.) transformers after dismantling and replacement of damaged spare parts with new one(gasket, bushes, lids, HT & LT brass studs, nut , bolts, bush plates, connectors, cu sleeve and extra if any required). Replacement of damaged H.T and L.T copper wound coil. Complete job as per specification and direction of E/I..( FOR THREE YEARS) (b) 5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Repair of 200KVA(01 nos.) and 100KVA(01 Nos) transformers after dismantling and replacement of damaged spare parts with new one(gasket, bushes, lids, HT & LT brass studs, nut , bolts, bush plates, connectors, cu sleeve and extra if any required). Replacement of damaged H.T and L.T coil. Complete job as per specification and direction of E/I. .( FOR THREE YEARS) (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Maintenance and oil topup of 500 KVA Transformer (fitted behind control room) ,300KVA Transformer (fitted behind new IB) ,200KVA Transformer (fitted behind circle building). .( FOR THREE YEARS) (b) 5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a) Erection and installation of pipe earthing & Lightening arrester with complete material for substation(Total 5nos.) .( FOR ONE YEARS) (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
SupplyFitting, Fixing of L.T pin insulator set L.T shackle insulator including supply of nuts, bolts and straps..( FOR ONE YEARS)
Supply, Fitting, Fixing of L.T stay wire.( FOR ONE YEARS)
Supply Fitting, Fixing of L.T insulator channel( FOR ONE YEARS)
Supply, Fitting, Fixing L.T wire separator( FOR ONE YEARS)
Supply, Fitting, Fixing H.T. bush with complete accessories( FOR ONE YEARS)
Supply, Fitting, Fixing L.T. bush with complete accessories( FOR ONE YEARS)
SupplyFitting, Fixing of H.T disc insulator( FOR ONE YEARS)
Supply,Fitting,Fixing of copper lugs of size 200 mm, 95mm, 50mm ,35mm,25mm ,16mm, 10mm, 8mm, 6mm (10 nos. each)( FOR ONE YEARS)
(a)Repair/Replacement of AB Switch of 500KVA Transformer , fitted behind new IB ,200KVA Transformer(fitted behind circle building),Repair/Replacement of 3 nos AB Switch fitted at Power House, after dismantling and replacement of damaged parts with new one. complete job as per specification and direction of E/I.( FOR ONE YEARS) (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
Supply of 6mm and 8mm gasket sheet .( FOR ONE YEARS)
Cleaning of tree branches and shrubs along transmission line and transformers in use.( FOR THREE YEARS)
Supply of H.T. bush with complete accessories for 200KV Transformer( FOR ONE YEARS)
Supply, L.T. bush with complete accessories for 200KV Transformer( FOR ONE YEARS)
(a)Replacement of 05 nos CCTV Camera System and wiring( wherever required ) fitted at Chandil dam ( FOR ONE YEARS) (b) maintenance of 07 nos. CCTV camera .Complete Job ,as per specification and direction of E/I. ( FOR THREE YEARS) (b)Supply fitting fixing of 1650VA, 200Ah(02 nos.) invertor & double battery system for control room ( FOR ONE YEARS) (c)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.
Repair/Maintenance of hooters (2 Nos.) , Fire Fighting system, fitted at Chandil Dam .Complete Job ,as per specification and direction of E/I.( FOR THREE YEARS)
(a) Supply fitting fixing of 45 ton chain pulley system for CLMC service gate. ( FOR ONE YEARS) (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a)Supply and erection 1.5 HP submersible pump, GI pipe line , 500 Liter water tank(with proper plateform) , steel sink and bib cock other items required for water supply purpose in control room from dam upstream side. ( FOR ONE YEARS) (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR THREE YEARS)
(a) Supply fitting fixing of LED lights17Nos(90Watts) for radial gate hoisting platform and for different points with required wiring and other fixture’s and marking of painting of Radial gate dial and dam level indicator bysynthetic enamel paint of approved quality . (b)5% amount will be deducted from quoted amount from each a/c bill and will be released after successful completion of maintenance period.( FOR ONE YEARS)
Fabrication and erection of 05 gates in parapet wall for stopping unauthorized entry on different points in dam top.( FOR ONE YEARS)
Supply fitting and fixing of 02 nos. of 32 Amp sockets with wirings for guard room with all necessary items , repair of cable tray of 13 numbers of Radial gates of Chandil Dam. ( FOR ONE YEARS)
Installation of Electronic Device with display unit for measuring seepage inside gallery with weekly submission of seepage report on day to day basis .Complete Job, as per specification and direction of E/I.( FOR ONE YEARS)
Providing earthing for all electrical installations fitted at Chandil dam. Complete Job, as per specification and direction of E/I.( FOR ONE YEARS)
Repair of Control Room with false ceiling work, CLMC Emergency gate Room (with replacement of existing windows with MS plate windows and weather proof painting .( FOR ONE YEARS)
Hardware tools and machinery projects pvt ltd
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .