Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.2 L+₹6,187.42 (5.43%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.2 L+₹6,364.20 (5.58%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.2 L+₹6,788.48 (5.95%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.8 L
EMD Value
₹5,301
Closing Date
18 Jun 2026, 6:00 pmClosed
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
C/O CEMENT CONCRETE PATH FROM FOOD STORE TO QASIM KHATANA, GH MOHIDIN KHATANA AND OTHERS AT MAGRAYPORA BLOCK BRENG
2026_RDPR_312329_2
ENIT28of2026-27
Open Tender
Civil Works
Percentage
30 days
ANANTNAG
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
OFFICE OF THE EXECUTIVE ENGINEER REW ANANTNAG
₹5,301
23 Jun 2026
13 Jun 2026
19 Jun 2026
13 Jun 2026
18 Jun 2026
13 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Site clearence ,including removing vegetation and inequalities ,roots,saplings etc | - | no | - | - |
| 0.0 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil . | - | Sqm | - | - |
| 0.0 | Supply and Placing of Stone Soling hand packed tightly in bed including all carriages | - | Cum | - | - |
| 0.0 | P/L in position C.C of specified grade excluding the cost of centring and shuttering 1: 3: 6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size). | - | Cum | - | - |
| 0.0 | P/F Centring and shuttering including strutting, propping etc. and removal of formwork complete job | 1 | Sqm | - | - |
| 0.0 | Carriage of material by MT of 50 KM lead and 400 m H.L ( sand Aggregates) | - | Cum | 1 | - |
| 0.0 | Provision for carriage of cement,shuttering and other unforseen items | - | L/S | - | - |
| 0.0 | Provision for signboard & photographs. | - | L/S | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.33 MB
BOQ_1010972.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .