Loading…
Loading…
Tender Value
Refer Docs
Closing Date
23 Mar 2026, 2:25 pmClosed
Single Packet
Normal Tender
No
Not Applicable
Itemwise/Consigneewise
Lowest to Highest
CONSIGNEE
Not Applicable
60 days
Expenditure
General
83
1 condition
I/We engage to supply the Western Railway with the articles specified above upon the terms of the Indian Railway Standard Condition of Contract latest revision and upon the terms of the Revised Special Conditions and Instructions for the guidance of the Contractors issued by the Western Railway S/137/F Revised May 2011 - Amendment No.3 of June 2016.
21 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Earnest Money Deposit (EMD): (1) EMD shall be submitted by tenderer as specified in tender schedule, along with their online offer. There shall be no exemption from submission of EMD for any tender or by any tenderer except those exempted. (2) Exemption to submit EMD will be given in the following cases : (a) Micro and Small Enterprises (MSEs) against UDYAM certification. (b) Other Railways and Government Departments. (c) Vendors registered with Railways for the trade group of the item tendered.
SECURITY DEPOSIT (SD): 1. All successful tenderer shall deposit Security Deposit (SD) amount @5% of contract value rounded off to nearest higher Rs.10,subject to maximum Rs. 50 lakh for contract value upto Rs 50 Cr. In case of contract value above Rs 50 Cr. SD will be Rs 1 Cr. 2.There shall be no exemption from submission of Security Deposit (SD) for any tender or by any tenderer except following: i. The Contract value up to Rs.25(twenty- five) lakh. ii. Other Railways and Government Departments. iii. PSUs owned by Ministry of Railways and PSUs for the group of items that are manufactured by them. iv. In tenders issued against PAC,OEM in whose favour PAC has been issued. v.Vendors registered with Railways for the trade group of the item tendered for orders valued up to their monetary limit of registration. vi. Vendors appearing on the approved vendor lists of RDSO/PUs/CORE, subject to approval status being valid on the date of tender closing.
1 location across Madhya Pradesh · 10 Numbers total
Updating, printing and supply of system map in A-1, A-2 & A-4 size of NWR as on 01.04.2026. Soft copy of previous year system map-2025 will be provided to the agency in AutoCAD and CDR format. Updated soft copy of the system map as on 01.04.2026 will be provided by the agency in DWG, PDF, JPEG and CDR format along with the hard copy in the specified quantity (updating will include but not limited to all sort of editing, alteration/modification etc. as per discretion of consignee). Nomenclature Number:- 2300 Nos. (One Set) (a) A-1 size ? 1100 Nos. (i) Folded in cover with two pockets - 800 Nos. (700 NWR Wise, 50 District Wise and 50 Constituency Wise) (ii) Unfolded without cover - 300 Nos. (b) A-2 size - 700 Nos. (c) A-4 size - 500 Nos.
83265003~NWR
83265003
Open - Indigenous
Goods
Indore, Madhya Pradesh
₹0
Exempted
23 Mar 2026
2 Mar 2026
1 item · 10 Numbers total
Liquid Level Guard for western lavatory EVAC system, KBIL Part No. 43360 make: Knorr brem se Offer: Make Brand: Self, Inspection against KBI WTC. [ Warranty Period: 30 Months after the date of de livery ] ]
| Delivery Location | State | Quantity |
|---|---|---|
| SENIOR SECTION ENGINEER (C&W) INDORE, WR | Madhya Pradesh | 10.00 Numbers |
| Total | 10 Numbers | |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
5654585.pdf
ATTACHMENT
5580966.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .