Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹7.8 LAccepted-Finance | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹8.9 L+₹1.0 L (13.3%)Rejected-Finance | L-2 | Rejected-Finance L-2 |
Tender Value
₹8.6 L
EMD Value
₹17,200
Closing Date
18 Mar 2024, 1:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE, BDGC, BSR
EE, BDGC, BSR
REPAIRING OF VRB AT KM. 30.980, KM. 32.590 AND KM. 37.000 OF MAIN KALDA DY
2024_UPIDC_898387_25
22/EE/2023-24
Open Tender
Civil Works
Fixed-rate
60 days
Bulandshahr
FEE/EMD/TECH
2 documents required · 2 mandatory
₹266
₹17,200
9 Nov 2024
12 Mar 2024
18 Mar 2024
12 Mar 2024
18 Mar 2024
12 Mar 2024
Amount
Earth work in foundation in dry ordinary soil (loam clay or sand) including lift up to 1.5 meter and lead up to 30 meter and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal or surplus earth as directed by the Engineer-in-charge up to a distance of 30M from the foundation
Laying C.C. 1:3:6 in foundation with cement, coarse sand and stone grit 10 to 25 mm. size including all cost of material, labour and T&P etc. complete.
M-150 Brick work in 1:4 cement and coarse sand mortar i/c all cost of material, labour and T&P etc. complete.
P/LCentering & Shuttering for R. C. C. work i/c all cost of material, labour and T&P etc. complete.
Laying R.C.C. in 1:1.5:3 cement, coarse sand and stone grit .Cement concrete with stone ballast in 10 to 25 mm. size in RCC work excluding centering, shuttering and reinforcement and all cost of material, labour and T&P etc. complete.
P/Laying of steel Reinforcement in slab & Lintel i/c cost of all material ,labour and T&P etc
Laying C.C. in 1:1.5:3 cement, coarse sand and stone grit 10-25 mm. size of material, labour and T&P etc. complete.
P/L cement Struck deep pointing in 1:2 cement sand mortar i/c all cost of material, labour and T&P etc. complete.
P/L 12.50mm thick cement plaster in 1:4 cement mortar all material, labour and T&P.
Finishing outer wall with weather coat by (Asian or Berger Brand) of approved make and quality on surface with two or more coat to give an even shade thoroughly brushing the surface free from mortar dropping and other foreign matters and sand papered smooth including supply of all materials, labour, Tools & plants etc. required for proper completion of the work.
Cleaning thick bushes & thorny jungle without uprooting with disposal as per dirction of Engineer in charge
Hiring of Diesal pumps 5HP including operator and POL for dewatering
Removing of slush and lahal for Wet earth work excluding dewatering and disposal upto 1 km As per direction of engineer in charge
Earth work in embankment by power tranported earth with a lead beyond 200m. and upto 1.00 Km. including excavation, loading, unloading, manual compaction, dressing and all lifts complete excluding royalty will be applicable from time to time on Govt. orders.
Earth work in cutting for removing Diversion and disposal on the bank of Dy As per dirction of Engieer in charge
Painting of gates and appurtenances by applying 1 coat of red oxide zinc chromate primer and 2 coat of high build black bituminous paint of standard make after proper cleaning.scrapping the surface including cost of material, all material, labour T&P and scaffolding bridges with proper safety arrangement as required for proper completion of work.
Replacing of Bottom Rubber Seal size 80 x 20 mm as per IS Code IS 1855 by removing old/damaged side rubber seal from gear, scraping & cleaning surface, making holes, fixing and clamping the M.s. Plate by new counters sunk head high tensile bolts, nuts and washer, making adjustment as per requirement of site including cost of all material, labour and T&P required for proper completion of work.
Replacing broken/missing, damage bolts, nuts in hydro mechanical equipments and their components after proper checking of bolts, nuts including cost of all material, labour, T&P etc. as required for proper completion of work.
Rectifying defective alignment of gates by adjusting length of Steel Wire Rope and other allied work as required including cost of all material, labour and T&P, Jigs & fixtures, scaffolding etc as required for proper completion of work.
Fabricating and decking on Super Structure of Regulator Gate by M.s. Chequerred Plate 6mm thickness after dismantling old and damaged wooden planks and measuring, marking, cutting by gas making holes if required in Chequerred plate to the size as per requirement of site, shifting from ground level to super structure platform and welding by diesel generating set including cost of gas, electrodes and other required materials, labour and T&P for proper completion of work.
RAJKESH SHARMA
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .