Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.2 LAccepted-Finance NO 102 NORTH STREET KARUKKALACHERRY KARAIKAL | ₹23.2 L | L1 | Accepted-Finance Single |
Tender Value
₹21.3 L
EMD Value
₹42,610
Closing Date
17 Aug 2026, 4:00 pmClosed
Executive Engineer
the Executive Engineer, Irrigation and Public Health Division , PWD, Karaikal
Annual maintenance of cross masonry structures of Channels in Thirunallar section for the year 2026
2026_PWDC3_22686_1
17-01/PW/IPH/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Karaikal
Please refer Tender documents.
2 documents required · 2 mandatory
₹525
₹42,610
18 Aug 2026
7 Aug 2026
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.- in cement mortar | 33 | Cum | 1,852.29 | ₹61,125.57 |
| 2 | Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as per direction of Engineer-in-charge , within a lead of 50m - all kinds of soil | 226 | Cum | 272.13 | ₹61,501.38 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level - 1:4:8 (1 cement : 4 fine aggregate : 8 graded stone aggregate 40mm nominal size) | 20 | Cum | 6,769.41 | ₹1,35,388.2 |
| 4 | Centring and shuttering including strutting , propping etc. and removal of form work for - foundations, footings, bases for columns | 278 | Sqm | 409.56 | ₹1,13,857.68 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level - 1:3:6 (1 cement : 3 fine aggregate : 6 graded stone aggregate 20mm nominal size) | 84 | Cum | 7,313.13 | ₹6,14,302.92 |
| 6 | Centring and shuttering including strutting , propping etc. and removal of form work for - retaining walls, return walls, walls any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 418 | Sqm | 847.05 | ₹3,54,066.9 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc. upto floor five level, excluding the cost of centering ,shuttering and finishing - 1:3:6 (1 cement : 3 fine aggregate : 6 graded stone aggregate 20mm nominal size) | 72 | Cum | 8,676.98 | ₹6,24,742.56 |
| 8 | 16mm cement plaster of mix -1:3 ( 1 cement : 3 fine aggregate) | 418 | Sqm | 276.25 | ₹1,15,472.5 |
| 9 | Finishing walls with water proofing cement paint of required shade - New work (Two or more coats applied @ 3.84 kg / 10 sqm) | 418 | Sqm | 119.6 | ₹49,992.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
Tendernotice_2.pdf
PDF • 1.71 MB
BOQ_23133.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .