Executive Engineer, Krishnagiri
KEDC, 110/33-11KV SS Krishnagiri Campus, Kattiganapally, Rayakotta Road, Krishnagiri 635002
Work Contract for Erection of 1 No of Agriculture Service Connection Normal Priority extend work in M.C Pally Section Town/Krishangiri Sub-Division in Krishnagiri Division.
2023_EB_282517_1
Enq.05/22-23, Dt.19.01.2023/Extend of 1 No AGL
Open Tender
Electrical Works
Works
365 days
Krishnagiri
Should be TNEB Registered Contractor
2 documents required · 2 mandatory
₹0
₹2,500
Yes
10 Feb 2023
19 Jan 2023
3 Feb 2023
19 Jan 2023
2 Feb 2023
19 Jan 2023
19 Jan 2023 - 2 Feb 2023
Amount
Excavation stay pit
Excavation of Pole pit hard soil
Erection of RCC, REC, PSC, Poles above 8.23 length
erection of stay set complete
Fixing of V X-arm 3.5/4.5/5.0 with fitting insulators (11/22/33KV)
Fixing of 2Nos flat/cupoint X arm with materials in 11/22/33KV cutpoint.
Fixing of LT 3 Phase cross arm with materials
Paving and stringing of conductor of 1 run size upto ACSR 7/2.59 or AAAC 7/2.50mm
Paving and stringing of conductor of 1 run size upto ACSR 7/2.59 or AAAC 7/3.15mm
Erection of single pole Distribution transformer structure as standard
Dismantling of al types of Pole
Transportation of all types of poles by bullock cart or other vehicle including loaading and un-loading above 5km
AB switch open type side aem strd cutting and drilling of holes
Manufactruing of earth pipe clamps for structure including drilling of holes welding with pipe etc.,
Fixing of HT TI Fitting with Insulators
Fixing of 11KV Pin insulator with pin 11KV
Fixing of 11KV Strain Disc
Drilling of holes in Xarm and clamps
Manufacturing / Alternating of clamps
Transportation of conductor all size from road size to pit locations one KM Conductor
Loading and un loading of poles all type of pole
Loading and unloading of conductor drums from store to head quarter office
Erection of Distribution Transformer structure materials upto 100KVA
Transporting of Distribution Transformer materials and line materials
Loading/Unloading of Line Materials
Loading and unloading Distribution Transformer up to 100KVA
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .