| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAccepted-AOC | ₹27.9 L | L1 | Accepted-AOC ACCEPTED BEING LOWEST BIDDER |
| 2 | L2₹30.4 L+₹2.6 L (9.21%)Rejected-Finance S 15 SACRED WORLD OPP SACRED HEART TOWN WANWADI PUNE 411040 | PUNE | MAHARASHTRA | 411040 | ₹30.4 L+₹2.6 L (9.21%) | L2 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER |
| 3 | L3₹37.7 L+₹9.9 L (35.4%)Rejected-Finance AADARSH RESIDENCY LANE 06 PAWAR COLONY NEAR PMC SCHOOL VITTHAL NAGAR S NO 15 HADAPSAR PUNE | ₹37.7 L+₹9.9 L (35.4%) | L3 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER |
| 4 | L4₹44.8 L+₹17.0 L (60.9%)Rejected-Finance SR NO 281 3 7 ANAND NAGAR NEAR DHANORI JAKAT NAKA LOHEGAON PUNE 411047 | PUNE | PUNE | MAHARASHTRA | 411047 | ₹44.8 L+₹17.0 L (60.9%) | L4 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER |
| 5 | L5₹45.0 L+₹17.2 L (61.5%)Rejected-Finance SOMNATH NAGAR SR NO 43 1 2 GREWAL HOUSING SOCIETY PUNE NAGAR ROAD WADGAON SHERI PUNE 411 014 | PUNE | PUNE | MAHARASHTRA | 411014 | ₹45.0 L+₹17.2 L (61.5%) | L5 | Rejected-Finance REJECTED BEING NOT LOWEST BIDDER |
| Sl No | Description | Qty | Unit | RAJENDRA CONSTRUCTION L6 | Aadarsh Bharat Enviro Pvt Ltd L3 | Sunshine Ventures L1 | MOHANLAL MATHRANI CONS. PVT. LTD. L7 | VP DEVELOPERS AND CONTRACTOR L4 | Ganesh Enterprises L5 | PAVEWAY CONSTRUCTIONS PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in soft /loose soil surfaces formed to required slope, gradient, camber, and super elevation etc.complete all as specified and directed by Engr-in-Charge. | 150 | Sqm | 41 ₹6,150 | 40 ₹6,000 | 30 ₹4,500 | 117 ₹17,550 | 88 ₹13,200 | 50 ₹7,500 | 12 ₹1,800 Lowest |
| 2.00 | Excavation over areas n. exc 1.5m deep and getting out hard/dense soil and getting out etc complete all as specified and directed by Engr-in-Charge. | 736.05 | Cum | 410 ₹3,01,780.5 | 160 ₹1,17,768 | 130 ₹95,686.5 | 370 ₹2,72,338.5 | 310 ₹2,28,175.5 | 400 ₹2,94,420 | 90 ₹66,244.5 Lowest |
| 3.00 | Removing excavated materila exc 250 m but not exc 500 m and depositing where directed complete all as specified and directed by Engr-in-Charge. | 588 | Cum | 351 ₹2,06,388 | 50 ₹29,400 Lowest | 290 ₹1,70,520 | 270 ₹1,58,760 | 210 ₹1,23,480 | 450 ₹2,64,600 | 50 ₹29,400 Lowest |
| 4.00 | Removing excavated material ( soils) not exceeding 50m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and directed by Engr-in-Charge. | 170.55 | Cum | 251 ₹42,808.05 | 75 ₹12,791.25 | 240 ₹40,932 | 170 ₹28,993.5 | 520 ₹88,686 | 250 ₹42,637.5 | 30 ₹5,116.5 Lowest |
| 5.00 | Rolling and consolidating formation surfaces in cutting with 8 to 10 tonne power roller complete to required levels, gradient , slopes, camber and super elevation including filling depression with and including approved earth which may occur during rolling complete all as specified and directed by Engr-in-Charge. | 210.3 | 10 Sqm | 51 ₹10,725.3 | 25 ₹5,257.5 | 18 ₹3,785.4 Lowest | 26 ₹5,467.8 | 200 ₹42,060 | 20 ₹4,206 | 30 ₹6,309 |
| 6.00 | M & L for Laying and compacting 200 mm thick (compacted thickness) Granular Sub Base Course (GSB) grading as per Grade I as specified Table 400-1 of MaRTH specifications for Road and Bridge works, 2013, in a single layer over compacted subgrade with natural sand, crushed gravel, crushed stone, crushed slag or combination thereof as per the grading required The materials are mechanically mixed, spread and leveling on the subgrade by using motor grader of adequate capacity, and rolling with vibratory roller of capacity 80-100 KN static weight for achieving required compaction density of atleast 98% of the Maximum Dry Density. Consolidating to required gradient and camber complete all as specified and directed with finished surface tolerances as per Table 900-1 of MaRTH specifications for Road and Bridge works, 2013 complete all as specified and directed by Engr-in-Charge. | 210.3 | 10 Sqm | 4,510 ₹9,48,453 | 4,000 ₹8,41,200 | 2,490 ₹5,23,647 Lowest | 4,500 ₹9,46,350 | 5,400 ₹11,35,620 | 5,000 ₹10,51,500 | 2,500 ₹5,25,750 |
| 7.00 | M & L fo Laying and compacting 150 mm thick WMM laid in two layers of 75 mm each (compacted thickness) Wet Mix Macadam (WMM) grading as per table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with wate to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-1 OOKN static weight and consolidating to required gradien and camber complete all as specified and directed The finished surface tolerances to be as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013 complete all as specified and directed by Engr-in-Charge. | 210.3 | 10 Sqm | 4,000 ₹8,41,200 | 3,800 ₹7,99,140 | 2,600 ₹5,46,780 | 4,500 ₹9,46,350 | 3,300 ₹6,93,990 | 4,300 ₹9,04,290 | 2,400 ₹5,04,720 Lowest |
| 8.00 | M & L for Preparing unsurfaced WMM top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer of paving bitumen VG-10 grade bitumen at 7.5Kg/10 Sqm all as specified..complete all as specified. | 210.3 | 10 Sqm | 375 ₹78,862.5 | 290 ₹60,987 | 220 ₹46,266 Lowest | 750 ₹1,57,725 | 500 ₹1,05,150 | 300 ₹63,090 | 500 ₹1,05,150 |
| 9.00 | M & L Premix bituminous macadam laid/rolled and compacted to required gradient and camber with 8 to 12 tone power roller (consolidated thickness 75mm or less) with binder content paving bitumen VG-30 of 4% by weight of total mix laying with paver machine and mixing in hot mix plant complete all as specified and directed by Engr-in-Charge. Note: The contractor quoted the rate shall be deemed to include the following elements:
1. The contractor shall got the mix design done through Govt approved lab and same shall be got approved from GE before incorporating in the work.
2. In case variation in the bitumen content as per approved design mix in comparison with the bitumen content as specified above, the variation in the quantity of bitumen shall be adjusted with price adjustment. | 105.15 | Cum | 10,000 ₹10,51,500 | 8,500 ₹8,93,775 | 5,200 ₹5,46,780 Lowest | 11,000 ₹11,56,650 | 9,770 ₹10,27,315.5 | 8,600 ₹9,04,290 | 7,500 ₹7,88,625 |
| 10.00 | M & L for Bitumanuous premixed asphaltic semi dense concrete 40mm consolidated thickness with bitumen of grade VG-30 with 5.5% binder content by weight of total mix duly rolled and compacted to required camber and gradient with 8-12 tonne power roller and vibrating roller etc incl applying tack coat @2.5 Kg/ 10 Sqm applying complete all as specified and directed by Engr-in-Charge. Note: The contractor quoted the rate shall be deemed to include the following elements:
1. The contractor shall got the mix design done through Govt approved lab and same shall be got approved from GE before incorporating in the work.
2. In case variation in the bitumen content as per approved design mix in comparison with the bitumen content as specified above, the variation in the quantity of bitumen shall be adjusted with price adjustment. | 210.3 | 10 Sqm | 5,500 ₹11,56,650 | 4,000 ₹8,41,200 | 3,120 ₹6,56,136 Lowest | 5,470 ₹11,50,341 | 3,540 ₹7,44,462 | 3,600 ₹7,57,080 | 4,000 ₹8,41,200 |
Tender Value
₹55.7 L
EMD Value
₹1.1 L
Closing Date
23 Jun 2026, 6:00 pmClosed
CWE Khadki Pune
Headquarters CWE Khadki, Military Engineer Services, Range Hills Road, Khadki, Pune-411003
PROVN OF APPROACH ROAD FOR VARIOUS STORE HOUSES OF NO 02 AND 04 SUB DEPOT AT ARSENAL AREA OF CAFVD KHADKI AND PROVN OF INTERNAL ROAD AT RESIDENTIAL AREA OF NIRIKSHAN VIHAR TYPE IV AND V AT CQA AMN KHADKI UNDER GE CENTRAL KHADKI
2026_MES_767141_1
CWE/KKE/TOKEN-74 OF 2025-26
Open Tender
Civil Works - Roads
Item Rate
120 days
CWE Khadki Pune
AS PER TENDER DOCUMENTS
6 documents required · 6 mandatory
₹1,000
Yes
GE CENTRAL KHADKI
₹1.1 L
Yes
8 Sept 2026
22 May 2026
26 Jun 2026
22 May 2026
23 Jun 2026
15 Jun 2026
22 May 2026 - 6 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface excavation not exceeding 30 cm deep and averaging 15 cm deep and getting out in soft /loose soil surfaces formed to required slope, gradient, camber, and super elevation etc.complete all as specified and directed by Engr-in-Charge. | 150 | Sqm | 53.1 | ₹7,965 |
| 2 | Excavation over areas n. exc 1.5m deep and getting out hard/dense soil and getting out etc complete all as specified and directed by Engr-in-Charge. | 736.05 | Cum | 450 | ₹3,31,222.5 |
| 3 | Removing excavated materila exc 250 m but not exc 500 m and depositing where directed complete all as specified and directed by Engr-in-Charge. | 588 | Cum | 582.6 | ₹3,42,568.8 |
| 4 | Removing excavated material ( soils) not exceeding 50m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and directed by Engr-in-Charge. | 170.55 | Cum | 320.4 | ₹54,644.22 |
| 5 | Rolling and consolidating formation surfaces in cutting with 8 to 10 tonne power roller complete to required levels, gradient , slopes, camber and super elevation including filling depression with and including approved earth which may occur during rolling complete all as specified and directed by Engr-in-Charge. | 210.3 | 10 Sqm | 26 | ₹5,467.8 |
| 6 | M & L for Laying and compacting 200 mm thick (compacted thickness) Granular Sub Base Course (GSB) grading as per Grade I as specified Table 400-1 of MaRTH specifications for Road and Bridge works, 2013, in a single layer over compacted subgrade with natural sand, crushed gravel, crushed stone, crushed slag or combination thereof as per the grading required The materials are mechanically mixed, spread and leveling on the subgrade by using motor grader of adequate capacity, and rolling with vibratory roller of capacity 80-100 KN static weight for achieving required compaction density of atleast 98% of the Maximum Dry Density. Consolidating to required gradient and camber complete all as specified and directed with finished surface tolerances as per Table 900-1 of MaRTH specifications for Road and Bridge works, 2013 complete all as specified and directed by Engr-in-Charge. | - | 10 Sqm | 5,248.95 | - |
| 7 | M & L fo Laying and compacting 150 mm thick WMM laid in two layers of 75 mm each (compacted thickness) Wet Mix Macadam (WMM) grading as per table 400-13 of MaRTH specifications for Road and Bridge works 2013 manufactured in WMM plant material comprising of clean, crushed, graded aggregate and granular material premixed with wate to a dense mass, spreading with sensor paver and rolling with vibratory roller of capacity 80-1 OOKN static weight and consolidating to required gradien and camber complete all as specified and directed The finished surface tolerances to be as per Table 900-1 of MaRTH specifications for Road and Bridge works 2013 complete all as specified and directed by Engr-in-Charge. | - | 10 Sqm | 4,424.52 | - |
| 8 | M & L for Preparing unsurfaced WMM top surfaces by brushing with wire brushes for removing caked mud etc, sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc and applying evenly a priming/tack coat with bituminous primer of paving bitumen VG-10 grade bitumen at 7.5Kg/10 Sqm all as specified..complete all as specified. | - | 10 Sqm | 360.6 | - |
| 9 | M & L Premix bituminous macadam laid/rolled and compacted to required gradient and camber with 8 to 12 tone power roller (consolidated thickness 75mm or less) with binder content paving bitumen VG-30 of 4% by weight of total mix laying with paver machine and mixing in hot mix plant complete all as specified and directed by Engr-in-Charge. Note: The contractor quoted the rate shall be deemed to include the following elements:
1. The contractor shall got the mix design done through Govt approved lab and same shall be got approved from GE before incorporating in the work.
2. In case variation in the bitumen content as per approved design mix in comparison with the bitumen content as specified above, the variation in the quantity of bitumen shall be adjusted with price adjustment. | 105.15 | Cum | 8,915.7 | ₹9,37,485.86 |
| 10 | M & L for Bitumanuous premixed asphaltic semi dense concrete 40mm consolidated thickness with bitumen of grade VG-30 with 5.5% binder content by weight of total mix duly rolled and compacted to required camber and gradient with 8-12 tonne power roller and vibrating roller etc incl applying tack coat @2.5 Kg/ 10 Sqm applying complete all as specified and directed by Engr-in-Charge. Note: The contractor quoted the rate shall be deemed to include the following elements:
1. The contractor shall got the mix design done through Govt approved lab and same shall be got approved from GE before incorporating in the work.
2. In case variation in the bitumen content as per approved design mix in comparison with the bitumen content as specified above, the variation in the quantity of bitumen shall be adjusted with price adjustment. | 210.3 | 10 Sqm | 3,966.75 | ₹8,34,207.53 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.56 MB
BOQ_859140.xls
BOQ • 3.95 MB
TENDER.pdf
Tender Documents • 1.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .