| 1 | L1₹2.1 CrAccepted-AOC P N ROAD P O P S DIBRUGARH DIST DIBRUGARH ASSAM | DIBRUGARH | ASSAM | 785675 | ₹2.1 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹2.2 Cr+₹10.4 L (4.88%)Rejected-Finance | ₹2.2 Cr+₹10.4 L (4.88%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.2 Cr+₹11.8 L (5.56%)Rejected-Finance | ₹2.2 Cr+₹11.8 L (5.56%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.3 Cr+₹14.2 L (6.68%)Rejected-Finance | ₹2.3 Cr+₹14.2 L (6.68%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.4 Cr+₹22.1 L (10.4%)Rejected-Finance | ₹2.4 Cr+₹22.1 L (10.4%) | L5 | Rejected-Finance L5 |
Tender Value
₹2.4 Cr
EMD Value
₹4.7 L
Closing Date
27 Dec 2019, 2:00 pmClosed
Chief Engineer, PWD (Roads), Assam
O/o the CE, PWD (Roads), Assam, Chandmari, Guwahati, 781003
MLCSNA/RIDF-XXV/Jorhat/05 Construction of RCC Br. no. 39/1 over Mograi river on New Sonowal BOP to Gabharu BOP ( Border road ) Under MLCSNA of RDIF XXV of NABARD 2019-20
2019_PWD_15163_5
CEMLCSNA/RIDFXXV/17/18-19/3
Open Tender
Civil Works
Item Rate
548 days
Jorhat
Please refer Tender documents.
6 documents required · 6 mandatory
₹7,100
Empowered Officer, ASRB
₹4.7 L
Yes
1 Oct 2020
5 Dec 2019
30 Dec 2019
6 Dec 2019
27 Dec 2019
6 Dec 2019
6 Dec 2019 - 27 Dec 2019
Amount
Dismantling of Cement Concrete Pavement (Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000metres ,stacking serviceable materials and unserviceable materials separately.)
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. 'I. Ordinary soil A. Manual Means (I) Without dewatering '(ii) 3 m to 6 m depth
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. including providing plasticiser (Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-1999) (Pile diameter-1000 mm)
Pile load test on single vertical pile in accordance with IS:2911(Part-IV). a). Initial and Routine load test.
Levelling course for Pile cap
Cement concrete for reinforced concrete in pile cap complete as per drawing and Technical Specification including providing plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-1999. 'B. RCC Grade M25 '(ii). Using Batching Plant, Transit Mixer and Concrete Pump
Reinforcement in Foundation: Supplying, fitting and placing TMT IS:1786 Fe500 D bar reinforcement in foundation complete as per drawing and technical specifications (a). TMT-IS 1786 ( Fe-500 D) Primary Producer (TATA/ SAIL/ Esser Steel/ Jindal panther steel/ Shyam steel or equivalent)
Plain/Reinforced cement concrete, in sub structure complete as per drawing and technical specification and steel shuttering formwork (N). Without plasticiser F. RCC Grade M25 a. Height upto 5m 'Case II. With Batching Plant, Transit Mixer and Concrete Pump
Supplying, fitting and placing TMT IS:1786 (Fe 500) bar reinforcement in sub-structure complete as per drawing and technical specifications (b). TMT-IS 1786 ( Fe-500 D) Secondary Producer (ISI approved)
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Supplying, fitting and fixing in position true to line and level forged steel roller bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification 'B. Sandy material
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
SUPER-STRUCTURE- 'Furnishing and Placing Prestressed cement concrete in super-structure as per drawing and Technical Specification' including steel shuttering formwork. (P). 'With plasticiser ( Masterplast PL-1/SPL-2 or equivalent ), air entraining and water reducing plasticiser ( Masterplast PAE or equivalent) and accelerating plasticiser ( Masterplast ACPL or equivalent) conforming to IS-9103-1999. 'E. PSC Grade M-40 'Case II. Using Batching Plant, Transit Mixer and Concrete Pump '(ii) . For T-beam & slab b. Height 5m to 10m
Reinforcement in Super Structure: Supplying, fitting and placing TMT conforming to IS:1786 Fe 500 D reinforcement in super-structure including splicing complete as per drawing and technical specifications (b). TMT-IS 1786 ( Fe-500 D) Secondary Producer (ISI approved)
High tensile steel wires/strands including all accessories for stressing, stressing operations and grouting complete as per drawing and Technical Specifications
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
Construction of precast RCC railing of M30 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequat space between vertical posts for expansion, complete as per approved drawings and technical specifications.
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instruction for installation).
Drainage Spouts complete as per drawing and Technical specification
Painting Two Coats on New Concrete Surfaces' Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces
Carrying out Sub Soil investigation (SSI) for all type of soil (except boring in rock) upto depthof 30 m or refusal (N=100) for each foundation location as per IRC 78-2014 and submission of SSI report to the Engineer in charge for approval . Preparation & submission of Design calculation & Drawings of foundation , sub structure,Super structure as relevant IRC Codes and SSI Report , 2( two) each of Design& Drawing of each bridge to be submitted for approval and 8 ( eight)copies after approval of competent authority. including providing and erecting informatory sign board as per norms of NABARD
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighting not less than 40Kg each.)
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications 'A. Stone/Boulder
Clearing and Grubbing Road Land -.(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to beused or auctioned up to lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm thickness.'(i) By Manual Means:-'B.In area of thorny jungle
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) from private land
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table (300-2) (a), ( Including cost of testing of materials at site and laboratory as directed by the deptt.) '(a) from private land
Granular Sub-base with Close Graded Material (Table:- 400-1)- 'A. 'Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( Including cost of testing of materials at site and laboratory as directed by the deptt.) including all lead and lift and payment of FR ,GST etc complete.'(i). for grading- I Material
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding material to fillup the interstices of coarse aggregate,watering and compacting to the reqd. density ( with all lead and lift and payment of FR,GST etc complete .A) By Manual Means'(iii)'Grading- III (a)Using Screening Crushable type such as Moorum or Gravel
Providing and laying Interlocking Concrete Block Pavement (ICBP) conforming to IS:15658-2006 including all lead and lift complete as per technical specification and as directed. (a). 80mm thick interlocking precast blocks having compressive strength of 40N/sq.mm.
Providing and laying Interlocking Concrete Block Pavement (ICBP) conforming to IS:15658-2006 including all lead and lift complete as per technical specification and as directed. (c) . Providing and laying M-40 grade cement concrete Edge block/ Edge restraints complete as per Technical specification clause 1504.
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand)(i). 90cm equilateral traingle
Retro reflectorised Traffic sign: Providing and erecting of Retro-Reflectrorised cautionary, mandatory & informatory sign as per IRC: 67 made of high intensity encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick fixed on an angle iron of 25x25x4mm supported on a mild steel angle iron post 75mm x 75mm x 6mm firmly fixed to the ground by means of properly design foundation with M-15 grade Cement concrete 45cm x 45cm x 60cm, 60cm below ground level as per approved drawing and sign. ( All the Steel work must be Tata/Sail/or any other approved brand)(iv). 80cmm x 60 cm rectangular
Guard Posts - Supplying, fitting and fixing RCC guard post 150cm long erected 75cm above the ground and 75cm below the ground with M-15 grade (nominal mix 1:2:4 with broken stone aggregate up to 20mm size) of cement concrete and required reinforcement tied in position with annealed black wire including centering, moulding the top, curing including painting concrete surfaces in 23cm strips upto 0.75m from the top alternately in black and white and having 2 nos. reflective band of desired shade etc. complete as per design and as directed. (b) . 15 cm dia. RCC guard post with reinforcement of 4nos. 12mm dia TMT main steel bars and 6mm TMT/ MS stirrups at 15cm c/c.
SUB WAY : 'Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirment of table 300-2 ( Including cost of testing of materials at site and laboratory as directed by the deptt.) (a) from private land
Granular Sub-base with Close Graded Material (Table:- 400-1)- 'A. 'Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density,complete as per cl. 401( Including cost of testing of materials at site and laboratory as directed by the deptt.) including all lead and lift and payment of FR ,GST etc complete.'(i). for grading- I Material
Construction of cold weather Bamboo bridge overall width of 3.70m and clear road way 3m with jungle wood post 20cm to 25cm dia 5nos. In each rows and rows being 2.1m. apart except for the navigable span which should be 3m. Post to be driven at least 180cm. or more below ground level including providing 20cm to 25cm center to center and placed over 20 cm dia, jungle wood dham, 15cm dia. jungle wood bracing collar fixed by bolts and nuts, straps etc. mature bholuka Bamboo cross groth all closely packed and tied 75cm wide track way made from 38mm thick 1st class local plank fixed on 75mmx100mm first class local wood battens 120cm apart and 3 lines of jati bamboo horizantal railing fixed in bholuka bamboo post placed at 210cm apart and white washed including all necessary nuts and bolts, coir ropes, struts, nails etc. complete with a layer of brushwood to exposed portion out-side trackway with earth topping complete as per direction of the department.
Biju Duarah
M/s B.K. Mozika
Utpal Thakur
Tej Karan Jain
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .