Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹28.3 LAdmitted-Finance | -25.00% | ₹28.3 L | L1 | Admitted-Finance |
| 2 | L2₹28.3 LAdmitted-Finance AT PARIA PATAPUR PO KAKARUDRAPUR PS BALIANTA DIST KHORDHA | -24.99% | ₹28.3 L | L2 | Admitted-Finance |
| 3 | L3₹29.8 LAdmitted-Finance | -21.00% | ₹29.8 L | L3 | Admitted-Finance |
| 4 | L4₹31.0 LAdmitted-Finance | -17.79% | ₹31.0 L | L4 | Admitted-Finance |
| 5 | L5₹32.0 LAdmitted-Finance AT LIG 103 WARD NO 38 P O NAYAPALI DIST KHORDHA | -15.10% | ₹32.0 L | L5 | Admitted-Finance |
Tender Value
₹37.7 L
EMD Value
₹37,710
Closing Date
2 Mar 2026, 5:00 pmClosed
GM(C), OMC Ltd.
Office of the GM(C), OMC Ltd., Bhubaneswar
External repair and Painting work to OMC Head Office (Campus-I) in Unit-IV, Bhubaneswar in the district of Khordha.
2026_OMC_126318_1
NIT No.07/OMC/CIVIL/2026
Open Tender
Civil Works - Others
180 days
UNIT -IV BHUBANESWAR
RC, EPF Regd., GSTN, PAN, Registration in CDMS portal, Affidavits, experience, etc. as per DTCN requirements.
2 documents required · 2 mandatory
₹7,080
₹37,710
Yes
27 Apr 2026
20 Feb 2026
5 Mar 2026
20 Feb 2026
2 Mar 2026
20 Feb 2026
Civil Works
Dismantling of brick or stone masonry in lime/ cement mortar in any proportion up to 3m. height including removing the debris from the work site as per the direction of EIC & his subordinates including cost of all labours,T & P etc required to Complete the work . In Ground Floor
Dismantling and removing R.C.C. columns beams slab staircase landing lintels including removing the debris from the work site as per the direction of EIC & his subordinates including cost of all labours,T & P etc required to Complete the work .In Ground Floor
Dismantling and removing R.C.C. columns beams slab staircase landing lintels including removing the debris from the work site as per the direction of EIC & his subordinates including cost of all labours,T & P etc required to Complete the work .In First Floor
Dismantling and removing R.C.C. columns beams slab staircase landing lintels including removing the debris from the work site as per the direction of EIC & his subordinates including cost of all labours,T & P etc required to Complete the work. In Second Floor
Dismantling and removing R.C.C. columns beams slab staircase landing lintels including removing the debris from the work site as per the direction of EIC & his subordinates including cost of all labours,T & P etc required to Complete the work .In Third Floor
Providing, mixing and applying 12mm thick SBR polymer modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. (Make:- Fosroc, Sika, Dr. Fixit)
Providing, mixing and applying 25 mm thick SBR polymer modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. (Make:- Fosroc, Sika, Dr. Fixit)
Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) of 50 mm average thickness in 3 layers applied through the authorised applicator of the manufacturer including cost, carriage , loading & unloading of all materials, Cost of all labour, centering and shuttering, T&P etc required to complete the work in all respect as per direction of EIC. (Make:- Fosroc, Sika, Dr. Fixit)
Chipping of unsound/weak concrete material from slab cornice, beams, columns,chajja, etc.(50mm average thickness) with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge.
Cleaning of reinforcement from rust from the reinforcing bars to give it a total rust free steel surface by using alkaline chemical rust remover of approved make with paint brush and removing loose particles after 24 hours of its application with wire brush and thoroughly washing with water and allowing it to dry, all complete as per direction of Engineer-In-Charge. (Bars Upto 12mm dia)
Providing, mixing and applying epoxy bonding adhesive of approved make on chipped and prepared surface of RCC work, having coverage of about 2.20 sqm per kg, including surface preparation, cleaning, application as per manufacturer’s specification and as directed by the Engineer-in-Charge. (Make:- Fosroc, Sika, Dr. Fixit)
Providing, mixing and applying SBR polymer (of approved make @ minimum 2% by wt. of cement used) modified plain/reinforced cement concrete for structural members having minimum characteristic compressive strength with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria with specified average thickness applied through the authorised applicator of the manufacturer including cost, carriage , loading & unloading of all materials, Cost of all labour, centering and shuttering, T&P etc required to complete the work in all respect as per direction of EIC. In GF (Make:- Fosroc, Sika, Dr. Fixit)
Providing, mixing and applying SBR polymer (of approved make @ minimum 2% by wt. of cement used) modified plain/reinforced cement concrete for structural members having minimum characteristic compressive strength with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria with specified average thickness applied through the authorised applicator of the manufacturer including cost, carriage , loading & unloading of all materials, Cost of all labour, centering and shuttering, T&P etc required to complete the work in all respect as per direction of EIC. In First Floor
Providing, mixing and applying SBR polymer (of approved make @ minimum 2% by wt. of cement used) modified plain/reinforced cement concrete for structural members having minimum characteristic compressive strength with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria with specified average thickness applied through the authorised applicator of the manufacturer including cost, carriage , loading & unloading of all materials, Cost of all labour, centering and shuttering, T&P etc required to complete the work in all respect as per direction of EIC. In Second Floor (Make:- Fosroc, Sika, Dr. Fixit)
Providing, mixing and applying SBR polymer (of approved make @ minimum 2% by wt. of cement used) modified plain/reinforced cement concrete for structural members having minimum characteristic compressive strength with ordinary portland cement, coarse sand and graded stone aggregate of 10mm maximum size in proportion as per design criteria with specified average thickness applied through the authorised applicator of the manufacturer including cost, carriage , loading & unloading of all materials, Cost of all labour, centering and shuttering, T&P etc required to complete the work in all respect as per direction of EIC. In Third Floor (Make:- Fosroc, Sika, Dr. Fixit)
Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost,conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.). In Ground Floor
Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost,conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.). In First Floor
Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost,conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.). In Second Floor
Supplying HYSD bars of approved quality size and grade and cutting, bending, binding and tying the grills in proper position as required for the RCC work in all floors, including cost,conveyance of HYSD bars Fe500 and binding wires of 18 to 20 gauge and cost of labour,T & P and other materials complete in all respact as directed by the EIC. (Linear measurements will be taken & quantity will be calculated on standard weight. Weight of binding wire will not be considered for measurement.). In Third Floor
Surface preparation includes cleaning with metal wire brush to remove all dust, fungus etc., washing with water including removal of the debris from the work site as per the direction of EIC & his subordinates including cost of all labours,T & P etc required to Complete the work .
Repair to plaster of thickness 12mm to 20 mm including cutting the patch in proper shape, raking out joints and preparing plastering the wall surface with white cement based polymer modified self curing mortar including removal of the debris from the work site as per the direction of EIC & his subordinates including cost of all labours,T & P etc required to Complete the work .
Providing and injecting approved Epoxy injection grout in proportion recommended by the manufacturer into cracks/honey-comb area of concrete/masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in-Charge.
Providing and applying fibre reinforced elastomeric liquid water proofing membrane with resilient acrylic polymers having Sun Reflectivity Index (SRI) of 105 on top of concrete roof in three coats @10.76 litre/ 10 sqm. One coat of self-priming of elastomeric waterproofing liquid (dilution with water in the ratio of 3:1) , laying of fiberglass mesh with alkali resistant coating having mesh size 3.9mmx4.0mm and applying two coats of undiluted elastomeric waterproofing liquid (dry film thickness of complete application/system not less than 500 microns). The operation shall be carried out after scrapping and properly cleaning the surface to remove loose particles with wire brushes, complete & to be done through the authorised applicator of the manufacturer of membrane including cost, carriage , loading & unloading of all materials, Cost of all labour, T&P etc required to complete the work in all respect as per direction of EIC. in all respect as per the direction of Engineer-in-Charge. (Make:- Fosroc, Sika, Dr. Fixit)
Labour (Man days) required for miscellaneous work as per the instructions such as removal of vegetation growth from walls, chajjas, parapets and joints, shifting of existing non-functional outdoor A/C units, Non functional plumbing line etc including cost of all labour, transporation loading, unloading, T&P etc. complete as per direction of EIC.
Removal of stacked building rubbish, green waste, garbage etc from site & safe disposal of same far from the site( at a distance of 20Kms or more from the site) including cost of all labour, machineries, T&P etc required for conveyance, loading & unloading, watering & cleaning of site etc complete as per direction of EIC.
Providing and laying of 50mm dia Upvc pipes (Sch-80) with pipe fittings & clamps including making good the wall, ceiling and floor including cost, carriage, loading & unloading of all materials, cost of labour, T&P etc required to complete the work as per specification and direction of the Engineer-In-Charge. (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Providing & laying of 25mm dia Upvc pipes (Sch-80) with pipe fittings & clamps including making good the wall, ceiling and floor including cost, carriage, loading & unloading of all materials, cost of labour, T&P etc required to complete the work as per specification and direction of the Engineer-In-Charge. (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Supplying, fitting and fixingKota stone in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including rubbing and polishing etc complete
Supplying, fixing and testing PVC soil, waste, Rain and vent pipes (SWR) supreme confirming to IS13592 : 2013, type B with rubber ring/Solvent (confirming toIS5382) joint inclusive of allnecessary specials like bends, tees,offsets, door bends, junctions, cowls, etc.,laid underfloor/ fixed on walls,and in pipe shafts etc., complete.The rate shall include necessary GI supports, GI grip bolts, angle brackets, hangers, supports as with suitable GI U-clamps, bolts, nuts and washers etc., The clamps shall be painted with two coats of enamel (approved) paint over a coat of primer etc., complete. (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Supplying all materials, labour, T&P for fitting & fixing and laying 110mm dia PVC cowel of including supply of all jointing materials like gaskets, adhesive ,solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding, testing etc. as per direction of EIC. (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Supplying all materials, labour, T&P, fitting and fixing of UPVC SWR fittings of approved make with requisite testing etc complete as per PH specification and direction of Engineer-in-charge. 110mm dia SWR Door Bend (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Supplying all materials, labour, T&P, fitting and fixing of UPVC SWR fittings of approved make with requisite testing etc complete as per PH specification and direction of Engineer-in-charge. 110mm dia SWR Hill Rest Bend (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Supplying all materials, labour, T&P for fitting & fixing and laying 110mm dia PVC Single junction of including supply of all jointing materials like gaskets, adhesive ,solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding, testing etc. as per direction of EIC.(Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Supplying all materials, labour, T&P for fitting & fixing and laying 110mm dia PVC double junction of including supply of all jointing materials like gaskets, adhesive ,solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding, testing etc. as per direction of EIC. (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
110 mm dia PVC Floor Trap with 125mm dia Round Grating Doom including supply of all jointing material like gasket, adhesive, solvent cement etc as per specification and direction of the Engineer in charges . (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Supply, fitting and laying of 110mm dia PVC pipe (Class-II,0.4mpa) in trench including supply of all jointing materials like gaskets, adhesive, solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding, testing etc. as per direction of EIC. (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Supply, fitting and laying of 110mm dia PVC pipe (Class-II,0.4mpa) in trench with Type-B 1 Standard Bedding having hunching With Pcc(1:3:6) using 20mm Size Chips including supply of all jointing materials like gaskets, adhesive, solvent cement etc. and fixing to walls with supply of wooden plugs and nails, bobbins, clamps including scaffolding, testing etc. as per direction of EIC. (Make: -Supreme/ Ashirbad/ Astral/ Hariplast/ Oriplast/ Supreme)
Scraping old paints with scrappers, sand papering and washing the soap water or soda including scaffolding up to 5m height including cost of all labour, T&P required to complete as direction of EIC .
Scraping old paints with scrappers, sand papering and washing the soap water or soda including scaffolding up to 5m to 8m height including cost of all labour, T&P required to complete as direction of EIC .
Priming one coat with wall cement primer (water bound) to make an even finished surface in ground floors wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffolding, staging charges with cost, conveyance, taxes of all materials, cost of all labour,labour cess T&P etc. complete as per the direction of the Engineer-in-charge. (Make- ASIAN/ BERGER /DULUX)
Priming one coat with wall cement primer (water bound) to make an even finished surface in First floors wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffolding, staging charges with cost, conveyance, taxes of all materials, cost of all labour,labour cess T&P etc. complete as per the direction of the Engineer-in-charge. (Make- ASIAN/ BERGER /DULUX)
Priming one coat with wall cement primer (water bound) to make an even finished surface in second floors wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffolding, staging charges with cost, conveyance, taxes of all materials, cost of all labour,labour cess T&P etc. complete as per the direction of the Engineer-in-charge. (Make- ASIAN/ BERGER /DULUX)
Priming one coat with wall cement primer (water bound) to make an even finished surface in third floors wall surface of approved make and shade including sand papering, applying putty wherever necessary & cost of scaffolding, staging charges with cost, conveyance, taxes of all materials, cost of all labour,labour cess T&P etc. complete as per the direction of the Engineer-in-charge. (Make- ASIAN/ BERGER /DULUX)
Providing weather coat two coats of approved brand and shade over a coat of cement primer to exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost of all materials, labour, T&P etc. complete as directed by EIC.In Ground Floor (Make- ASIAN/ BERGER /DULUX)
Providing weather coat two coats of approved brand and shade over a coat of cement primer to exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost of all materials, labour, T&P etc. complete as directed by EIC. In First Floor (Make- ASIAN/ BERGER /DULUX)
Providing weather coat two coats of approved brand and shade over a coat of cement primer to exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost of all materials, labour, T&P etc. complete as directed by EIC. In Second Floor (Make- ASIAN/ BERGER /DULUX)
Providing weather coat two coats of approved brand and shade over a coat of cement primer to exterior surface of wall exposed to weather including cost of brush, scaffolding, staging charges with cost of all materials, labour, T&P etc. complete as directed by EIC. In Third Floor (Make- ASIAN/ BERGER /DULUX)
Dismantling G.C.I./A.C. sheet roofing by carefully removing bolts, nuts and fixtures, stacking the serviceable materials within a lead of 50 m for reuse, and disposing of unserviceable debris from the work site, including cost of all labour, tools and plants (T&P), scaffolding, safety arrangements, etc., complete as per the direction of the Engineer-in-Charge .
Dismantling steel work in all types of sections up to a height of 5 m above plinth level, excluding cutting of rivets but including dismembering; sorting and stacking the serviceable materials within a lead of 1000 m for reuse; and disposing of unserviceable materials and debris from the work site; including the cost of all labour, tools and plants (T&P), scaffolding, safety arrangements, etc., complete as per the direction of the Engineer-in-Charge.
Fitting, fixing and hoisting of MS hollow sections,angle, flats and other fabricated steel members in position, including hiring and running charges of all lifting appliances, tools and plants, scaffolding, labour charges for alignment and temporary supports, but excluding cost and conveyance of materials, complete as per specification and direction of the Engineer-in-Charge.
Fitting, fixing and hoisting of MS hollow sections,angle, flats and other fabricated steel members in position, including hiring and running charges of all lifting appliances, tools and plants, scaffolding, labour charges for alignment and temporary supports, but excluding cost and conveyance of materials, complete as per specification and direction of the Engineer-in-Charge.(Make:- Tata/JSW/Jindal)
Providing, fitting and fixing of 0.45 mm thick coloured G.C.I./pre-coated galvanised corrugated steel sheet roofing including fixing of ridges, hips, valleys, wind ties and other accessories with J or L hooks, bolts and nuts, bitumen washers, polymer washers etc., including cost, conveyance, loading, unloading, taxes of all materials and cost of all labour, scaffolding, tools and plants required to complete the work as per specification and direction of the Engineer-in-Charge.(Make:- Tata/JSW/Jindal)
Providing, fitting and fixing 0.45 mm thick coloured G.C.I./pre-coated galvanised corrugated steel sheet roofing including fixing of ridges, hips, valleys, wind ties and other necessary accessories with J or L hooks, bolts and nuts, bitumen and polymer washers, etc., excluding cost of sheet materials but including the cost of all labour, scaffolding, tools and plants, and including loading, unloading and all incidental charges required for proper completion of the work as per specification and direction of the Engineer-in-Charge.
Painting two coat with approved brand of synthetic enamel paint of approved shade and quality over old/new wood and iron works including cost of paint, primer, putty, scaffolding, T&P, cost, conveyance, cost of all materials and cost of all labour required for the work etc. complete as per the direction of EIC. (Make- ASIAN/ BERGER /DULUX)
Texture putty of approved shade and quality on wall including cost, conveyance and taxes of all materials, cost of all labour, brushes, scaffolding, T&P etc required to complete the work as directed by the Engineer-in-charge. (Make- ASIAN/ BERGER /DULUX)
Drilling suitable holes in reinforced or plain cement concrete with power driven drill machine to a minimum depth of 100mm upto 200mm in RCC beams, lintels, columns and slabs to introduce steel bars for retaining wall & other RCC structures etc including fixing the steel bars in position using epoxy resin anchor grout of approved make but excluding the cost of reinforcement, all complete as per direction of Engineer-In-Charge.
Triple-stage centering and shuttering for roof slabs, balconies and projections at heights from 7.20 m up to 10.80 m, including providing and fixing necessary formwork, staging, supports, bracing, propping with adjustable steel props or tubular scaffolding, and removal of the same after completion of work as per specification and direction of the Engineer-in-Charge.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
SBD_1.pdf
Tender Documents • 3.15 MB
BOQ_582029.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid