Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 CrAccepted-AOC MATERE HOUSE SEC NO 14 PRADHIKARAN PUNE MAHARASHTRA INDIA 412105 | PUNE | MAHARASHTRA | 412105 | L1 | Accepted-AOC CONTRACT AWARDED BEING THE LOWEST BIDDER | |
| 2 | L2₹5.0 Cr+₹21.8 L (4.59%)Rejected-Finance 20 SC BOSE COLONY GALI NO 02 DEFENCE LAB ROAD RATNADA JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L2 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 3 | L3₹5.1 Cr+₹35.6 L (7.50%)Rejected-Finance | L3 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 4 | L4₹5.4 Cr+₹68.3 L (14.4%)Rejected-Finance PLOT NO 13 3RD FLOOR BANSAL PLAZA SECTOR 6 COMMERCIAL COMPLEX DWARKA NEW DELHI 110075 | NEW DELHI | NEW DELHI | DELHI | 110075 | L4 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER | |
| 5 | L5₹6.7 Cr+₹1.9 Cr (40.2%)Rejected-Finance 43 MANAK BHAVAN FIRST FLOOR GUMANPURA KOTA 324 007 RAJASTHAN | KOTA | KOTA | RAJASTHAN | 324007 | L5 | Rejected-Finance BEING OTHER THAN LOWEST BIDDER |
| Sl No | Description | Qty | Unit | M/s Prem Associates H2 | M K ENGINEERS CO. H5 | V M MATERE INFRASTRUCTURES INDIA PVT LTD H6 | M/S RADIUS SYNERGIES INTERNATIONAL PVT LTD H3 | B B BUILDERS H1 | BEST INFRA H4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Design, Supply, installation , testing, commissioning, integrate and maintain the Advance Metering infrastructure (AMI) of smart meters of different makes to ensure interchangeability at later date as per BIS16444 using communication technology including GPRS/RF/Hybrid (RF + cellular) as per CEA/TRAI regulations in order to achieve overall economy in operation and maintenance . The AMI software and associated infrastructure should be capable of handling atleast 500 Nos of meters in the present phase of work of different makes as per BIS:16444 with expansion capacity upto 4000 Nos at each location / Station mentioned below of meters (during further phases of smart meters work) without any additional infrastructure and cost implication (except RF/GPRS meters, DCU and software as the case may be), including training and knowledge transfer, all expenditure incl periodic charges of telecom operator from installation till date of physical completion, obtaining audit of software for smart meters by CERT-India empanelled firms / CERT Auditor of Armed Forces, comprising all as specified having minimum parameters / specification as under:- | |||||||||
| 1.10 | Smart RF/Cellular Single Phase AC Meter Tamper Proof, Static Meter of Class 1.0, 315 V, 50 Hz, 10 A-60 A conforming to IS-16444 and relevant IEC standards with inbuilt Radio Frequency communication facility with self healing mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry including Polycarbonate Meter Box of suitable size for 1 Phase meter with viewing glass, concealed hinge and earth bolt plugged complete all as specified and directed. Meter Should support sending the following data : 15/30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for Cumulative Energy and Max Demand to software Meter should have connect / disconnect functionality operable from mdm/billing software and prepaid features would be MDM / Billing end as per prevalent IS Including Taking down of existing meter and deposit to MES store yard for safe custody all as specified and as directed
Location :- (1)GE (AF) Nagpur= 635 Nos (2) GE (AF) Ojhar = 808 Nos (301 nos at 11 BRD and 507 Nos at 25 ED) (3) GE (AF) Gurgaon = 468 (172 Nos at 54 ASP, 276 Nos at 13 BRD and 20 Nos at sekhon Vihar) (4) GE (AF) Tughlakabad = 314 Nos (274 Nos at 7 BRD and 40 Nos at 12 BRD Nazafgarh) (5) AGE(I) (AF) Manauri= 155 Nos (6) GE (AF) E/M Chakeri =245 (7) GE (AF) (B/R) Chakeri = 216 (8) Borgad =88. | 2,929 | Each | 11,054 ₹3,23,77,166 | 11,350 ₹3,32,44,150 | 10,300 ₹3,01,68,700 | 8,629.46 ₹2,52,75,688.34 Lowest | 12,010 ₹3,51,77,290 | 9,971 ₹2,92,05,059 |
| 1.20 | Smart RF/Cellular Three Phase AC Meter Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 10 A-100 A conforming to IS-16444 and relevant IEC standards with inbuilt Radio Frequency communication facility with self healing mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry including Polycarbonate Meter Box of suitable size for 3 Phase meter with viewing glass, concealed hinge and earth bolt plugged complete all as specified and directed. Meter Should support sending the following data : 15/30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for Cumulative Energy and Max Demand to software Meter should have connect / disconnect functionality operable from mdm/billing software and prepaid features would be MDM / Billing end as per prevalent IS . Including Taking down of existing meter and deposit to MES store yard for safe custody all as specified and as directed. Including Taking down of existing meter and deposit to MES store yard for safe custody all as specified and as directed
Location :- (1)GE (AF) Nagpur= 137 Nos (2) GE (AF) Gurgaon = 492 (22 Nos at 54 ASP, 70 Nos at 13BRD and 400 Nos at Sekhon vihar) (3) GE (AF) Tughlakabad = 24 Nos ( 04 Nos at 7 BRD and 20 Nos at 12 BRD Nazafgarh) (4) GE (AF) (B/R) Chakeri = 27 | 680 | Each | 14,500 ₹98,60,000 | 12,500 ₹85,00,000 | 14,500 ₹98,60,000 | 11,815.46 ₹80,34,512.8 | 15,800 ₹1,07,44,000 | 10,738 ₹73,01,840 Lowest |
| 1.20The communication system shall support:- (a) On demand energy transfer (b) Two way communication with DCU/HES (c) Clock Synchronisation facility with HES (Head End System) (d) Communication including different makes of meter shall be such that it should communicate with same DCU directly or via Mesh Network. (e) Meter Protocol shall be open interface system in accordance of transmission control protocol/internet protocol. (f) The cost of the meter would include 2 years recurring sim charges during the defect liability period. | |||||||||
| 1.20Notes for item Nos. 1.1 & 1.2 (a) Contractor has to execute MoU with respective AMISP before survey for finalizing the scheme along with number of RF meters & cellular meters, DCU and Repeaters as required. Cost of DCU and Repeaters is deemed to be included in the quoted rates, One type of DCU should be able to integrate/ communicate with three different makes of meter. List of accns (station wise) where meters are to be installed is as per para 11 of Sch A Notes. AMISP vendor has to submit the certificate for empanelment for successful demonstration of end-to –end AMI prepaid solution issued by REC. (b) OEM/AMISP rep will carry out the survey for finalizing the scheme as per para (a) above before execution and same shall be approved by GE(s). (c) Development /deployment of Software and application including hosting of GCC and obtaining cyber security clearance to enable AMI ready for operation 'Go live' to be done before procurement /installation of smart meters. (d) Vulnerability assessment (VA) and Audit of smart meter software application and associated ICT infrastructure is to be mandatorily undertaken through listed CERT-in empanelled agency and audit report to be submitted by contractor to GE(s) for obtaining Mandated cyber clearance by respective user. (e) Contractor has to Execute SLA (service level Agreement) with AMISP in addition to MoU , it has to be submitted to the GE(s) Before commencement of work ( penalty categories & its applicable % penalty shall be as mentioned under relevant PS clause (f) Any item not mentioned or missing in the BOQ or PS but required for the smooth, seamless and efficient functioning of AMI infrastructure including web based application and mobile application are deemed to be included in the quoted rates. (g) Hosting/ Storage of data on GCC should have 100% backup of data securely and properly (h) Quoted rates shall be inclusive of cost of all the material , software & hardware (including DCU’s Repeaters, SIM’s and all Accessories and Ancillaries, etc if required as per survey and design. | |||||||||
| 1.20Notes (Contd...) (j) The contractor would be responsible from removing the existing meter, noting down the reading and depositing it with the MES. (k) It would be possible to run the meter either in prepaid or postpaid mode. (l) The meters would carry 5 year warranty. Provision for comprehensive operation and maintenance including repair/replacement of defective meters /DCU and other associated components (software/hardware) required to make system functional at all times including periodic charges of telecom operator for a period of 5 years ( including the defect liability period of 2 years) after completion of work is deemed to be included in the quoted rates. (m) Payment schedule shall be as per relevant Clause. (n) Contractor/AMISP has to do the demonstration for compatibility of the entire software with three more smart meter makes in addition to the make approved by GE(s) during execution. Certificate to this effect shall be issued by GE(s). (o) The OEM would need to share the Authentication / Encryption keys of the meters along with relevant protocol details with the department. The department would need complete support of the OEM to be able to integrate the meter with any software of the department choice. (p) Meter installed inside a LT panel made of MS should also be able to communicate with DCU/RF meters in mesh properly if any | |||||||||
| 1.30 | Supply and Setup of Meter Data Management (MDM) system including supply and configuration of the Web based Software with following modules:
(i) Meter Data Management Module
The meter data management module would be deemed for collecting the data from the meter to DCU and server and vice versa, make the data available in bidirectional mode ton the currency recharge, online payment gateway, post paid billing modules, scheduling maintenance, low balance warning, quarter wise KVA allocation/tripping, tariff regulations, software customisations etc all as directed by the Engr-in-Charge.
(ii) Secure Mobile App/PC Based/Swipe Machine/Online Payment Gateway for all users assigned by the BSO/GE.
(a) 30 min instantenous data from all the meters for minimum seven parameters- Cumulative Energy, Power, Current, Voltage, Power Factor and Frequency.
(b) Abstract Download for Monthly and quarterly billing survey data for cumulative energy and max demand and tampering features.
(iii) Billing Module: The billing module capable to create data sheet for currency recharges, recharge history, maximum demand individually, user complaint registers, cheque/payment reconcillations, fixed charges, energy bill details etc. | 3,609 | Each | 2,590 ₹93,47,310 | 300 ₹10,82,700 | 100 ₹3,60,900 Lowest | 1,911.6 ₹68,98,964.4 | 2,700 ₹97,44,300 | 1,521 ₹54,89,289 |
| 1.30(iv) Occupation and Vacation Module: Provision to enter admin controls for transfers/vacations. The system would support occupation/ vacation based on the unit categories. The system would support automatic data capture on occupation and vacation events. (v) Customer Module: The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis. (vi) Energy Accounting Module The system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case tally with incomer EB energy meter. (vii) Communication Module The system would provide communication of energy data and bills via print, email and sms methods. (viii) Meter Master Data: The system would support meter master data repository. The system would support meter replacement process. (ix) Excel Export:The system would support export of metering and billing data in excel format. | |||||||||
| 1.30(x) Customer Care Module - the software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution. (xi) Meter Installation Module - The software would include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself. (xii) Activities Communication - The software support communication of the various activities such as occupation, vacation, meter change. personal detail change etc. with the user as well as the department on email. | |||||||||
| 1.30Notes: The additional functional requirements of MDMS are as follows: (a) Asset Management: i) Meter Location (Apartment, shop, industry/address etc). ii) Consumer Information (Name, Account, ID etc) iii) Meter details (Meter No. 1 phase/3 phase, with or without relay etc). iv) Meter Configuration (Demand integration period, load profile capture period etc). v) GIS information (connection, feeder/transformer/pole etc) b) Meter data: i) Accept meter data from HES process, store 1500 meter data at least for 6 month and analyze. ii) Schedule and on demand meter reads and pinging of meter. iii) Storage of all connected meter events and alarm. (storing of 5 years data or more via archiving) iv) Provide complete history and audit trail for all data for 30 days (configurable period) v) Handle net metering/meters at the same premises. vi) Manage at a minimum 15 mint interval data. | |||||||||
Tender Value
₹6.3 Cr
EMD Value
₹6.4 L
Closing Date
23 Apr 2025, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer(AF) Nagpur
HQ CE (AF) Nagpur Vayusena Nagar Nagpur-07
PROVISION OF SMART PREPAID METERS AT VARIOUS MES UNITS UNDER CE AF NAGPUR
2025_MES_696386_1
AF_NGP_801237
Open Tender
Civil Works
Item Rate
365 days
NAGPUR
For MES Enlisted Contractors- Class A Category b (i) For other Contractor meeting enlistment Criteria of MES for Class A Category b (i)
8 documents required · 8 mandatory
₹3,000
GE AF NAGPUR
₹6.4 L
Yes
HQ CE (AF) Nagpur
17 Jun 2025
4 Feb 2025
30 Apr 2025
4 Feb 2025
23 Apr 2025
16 Apr 2025
4 Feb 2025 - 11 Feb 2025
12 Feb 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Design, Supply, installation , testing, commissioning, integrate and maintain the Advance Metering infrastructure (AMI) of smart meters of different makes to ensure interchangeability at later date as per BIS16444 using communication technology including GPRS/RF/Hybrid (RF + cellular) as per CEA/TRAI regulations in order to achieve overall economy in operation and maintenance . The AMI software and associated infrastructure should be capable of handling atleast 500 Nos of meters in the present phase of work of different makes as per BIS:16444 with expansion capacity upto 4000 Nos at each location / Station mentioned below of meters (during further phases of smart meters work) without any additional infrastructure and cost implication (except RF/GPRS meters, DCU and software as the case may be), including training and knowledge transfer, all expenditure incl periodic charges of telecom operator from installation till date of physical completion, obtaining audit of software for smart meters by CERT-India empanelled firms / CERT Auditor of Armed Forces, comprising all as specified having minimum parameters / specification as under:- | - | - | - | - |
| - | Smart RF/Cellular Single Phase AC Meter Tamper Proof, Static Meter of Class 1.0, 315 V, 50 Hz, 10 A-60 A conforming to IS-16444 and relevant IEC standards with inbuilt Radio Frequency communication facility with self healing mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry including SMC Meter Box of minimum size 250 X 250 X 155 mm or as suitable for 1 Phase meter with viewing glass, concealed hinge and earth bolt plugged complete all as specified and directed. Meter Should support sending the following data : 15/30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for Cumulative Energy and Max Demand to software Meter should have connect / disconnect functionality operable from mdm/billing software and prepaid features would be MDM / Billing end as per prevalent IS .
Location :- (1)GE (AF) Nagpur= 635 Nos (2) GE (AF) Ojhar = 808 Nos (301 Nos at 11 BRD and 507 Nos at 25ED Deolali) (3) GE (AF) Gurgaon = 285Nos (172 Nos at 54 ASP, 93 Nos at 13 BRD and 20 Nos at Shekhon Vihar) (4) GE (AF) Tughlakabad = 314 Nos (274 Nos at 7 BRD and 40 Nos at 12 BRD Nazafgarh) (5) AGE(I) (AF) Manauri= 155 Nos (6) GE (AF) E/M Chakeri =245 (7) GE (AF) (B/R) Chakeri = 216 (8) Borgad-88 | - | Each | - | - |
| - | Smart RF/Cellular Three Phase AC Meter Tamper Proof, Static Meter of Class 1.0, 415 V, 50 Hz, 10 A-100 A conforming to IS-16444 and relevant IEC standards with inbuilt Radio Frequency communication facility with self healing mesh network with default and on demand display, billing data generation facility, anti-tamper features, Microprocessor and LED/LCD based circuitry including SMC Meter Box of minimum size 300 X 300 X 200 mm or as suitable for 3 Phase meter with viewing glass, concealed hinge and earth bolt plugged complete all as specified and directed. Meter Should support sending the following data : 15/30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, monthly billing survey for Cumulative Energy and Max Demand to software Meter should have connect / disconnect functionality operable from mdm/billing software and prepaid features would be MDM / Billing end as per prevalent IS .
Location :- (1)GE (AF) Nagpur= 137 Nos (2) GE (AF) Gurgaon = 492 (22 Nos at 54 ASP, 70 Nos at 13 BRD and 400 Nos at Shekhon Vihar) (3) GE (AF) Tughlakabad = 24 Nos (04 Nos at 7 BRD and 20 Nos at 12 BRD Nazafgarh) (4) GE (AF) (B/R) Chakeri = 27 | 680 | Each | - | - |
| - | The communication system shall support:-
(a) On demand energy transfer
(b) Two way communication with DCU/HES
(c) Clock Synchronisation facility with HES (Head End System)
(d) Communication including different makes of meter shall be such that it should communicate with same DCU directly or via Mesh Network.
(e) Meter Protocol shall be open interface system in accordance of transmission control protocol/internet protocol.
(f) The cost of the meter would include 2 years recurring sim charges during the defect liability period. | - | - | - | - |
| - | MAKE of Meters: L&T, Elmeasure, Secure, Schneider, HPL, Genus, Anchor panasonic
Make of Meter Box : Sintex/Hensel/L&T
Notes:
(a)OEM/AMISP rep will carry out the survey for finalising the scheme and number of RF meters and cellular meters before execution and same shall be approved by GE (b) The contractor would be responsible from removing the existing meter, noting down the reading and depositing it with the MES.
(c) It would be possible to run the meter in both prepaid and postpaid mode
(d) The meters would carry 5 year warranty. Provision for comprehensive operation and maintenance including repairs/replacement of defective meters/DCU and other associated components (software/hardware) required to make the system functional at all times including periodic charges of telecom operator for a period of 5 years (including the defect liability period of 2 years) after completion of work is deemed to be included in the quoted rates. Payment schedule shall be as follows:-
(i) 50 % payment on supply of entire material.
(ii) 10 % payment on testing and commissioning of the AMI.
(iii) 10 % payment after completion of defect liabilty period (2 years from completion)
(iv) 10 % payment after completion of 1st year from completion of defect laibility period.
(v) 10 % payment after completion of 2nd year from completion of defect laibility period.
(vi) 10 % payment after completion of 3rd year from completion of defect laibility period.
(e) The OEM would need to share the Authentication / Encryption keys of the meters along with relevant protocol details with the department. The department would need complete support of the OEM to be able to integrate the meter with any software of the department choice.
(f) Meter installed inside a meter LT panel made of MS if any should also be able to communicate with DCU/RF meters in mesh properly. | - | - | - | - |
| - | Supply / Planning / Setup/Tuning of RF/GPRS Communication infrastructure including the Network Management and Headend for the project the IP-67 protection Data Concentrator Units (DCU) compatible for remote Automatic Metering Infrastructure (AMI) solution and capable of communicating with the smart energy Meter in the corresponding frequency band and with the data server through GPRS/Ethernet. It would have internal memory to store data of at least 200 modules. It would have inbuilt battery back-up. It would have IP-67 protection. It would support auto discovery of the meters and self healing mechanism for the breaks in the RF network.It would have the following minimum features:
(1) It shall be able to configure the communication with underlying nodes / meters
(2) It should be able to pull data at conifigurable frequency from the nodes / meters. It shall be able to prioritise control commands.
(3) DCU would support on demand data from nodes.
(4) DCU would support data transfer via cellular / optical fibre communication. In case of cellular communication, it would support dynamic IP sim from any telecom service provider (minimum 4G and fallback to 2G) working in the location.
(5) DCU would be able to communicate to the nearest meters directly. For farther meters, it would allow communication through exisiting meters via mesh or other formation (repeater meters etc).
(6) DCU would allow more than one make of meters for the communication.
(7) Quoted rates deemed to include for hosting and GPRS charges/communication charges/broadband charges for minimum 2 years of defect liability period after completion. | - | Each | - | - |
| - | Location :- (1) GE (AF) Nagpur= 12Nos (2) GE (AF) Ojhar = 08 Nos (3) GE (AF) Gurgaon = 13 (4) GE (AF) Tughlakabad =06 Nos (5) AGE(I) (AF) Manauri=02 Nos (6) GE (AF) E/M Chakeri =01 (7) GE (AF) B/R Chakeri = 05, (8) Borgad-06 Nos
One Lot of HES (Head End System) / Gateway as per design shall be capable of meter data acquisition at user selected period, mantain time synchronism with smart energy /water meter and mantain communication device status and will provide visual interface to view the data/events with following features: | - | - | - | - |
| - | (a) Remote smart meter data reading at configurable intervals (upto 1500 meters)
(b) Acquisition of meter data on demand.
(c) Two way communication with meter/DCU/MDMS.
(d) Command for connect and disconnect the smart meter.
(e) Audit report and event alarm logging.
(f) Encryption of data for source communication.
(g) Mantain time sync with DCU/meter.
(h) Store raw data for duration of one week.
(j) Setting of smart meter configurable parameter.
(k) Communication device status and history.
(l) Critical and non critical meter event like temer/power failure etc. | - | - | - | - |
| - | Supply and Installation of single phase meter as repeaters
Location :-(1)GE (AF) Nagpur= 17 Nos (2) GE (AF) Ojhar = 26 Nos (3) GE (AF) Gurgaon = 08 (4) GE (AF) Tughlakabad = 10Nos (5) AGE(I) (AF) Manauri= 05 Nos (6) GE (AF) E/M Chakeri =01 (7) GE (AF) (B/R) Chakeri = 05, (8) Borgad-10 | - | Each | - | - |
| - | Supply and Setup of Meter Data Management (MDM) system including supply and configuration of the Web based Software with following modules:
(i) Meter Data Management Module
The meter data management module would be deemed for collecting the data from the meter to DCU and server and vice versa, make the data available in bidirectional mode ton the currency recharge, online payment gateway, post paid billing modules, scheduling maintenance, low balance warning, quarter wise KVA allocation/tripping, tariff regulations, software customisations etc all as directed by the Engr-in-Charge.
(ii) Secure Mobile App/PC Based/Swipe Machine/Online Payment Gateway for all users assigned by the BSO/GE.
(a) 30 min instantenous data from all the meters for minimum seven parameters- Cumulative Energy, Power, Current, Voltage, Power Factor and Frequency.
(b) Abstract Download for Monthly and quarterly billing survey data for cumulative energy and max demand and tampering features.
(iii) Billing Module: The billing module capable to create data sheet for currency recharges, recharge history, maximum demand individually, user complaint registers, cheque/payment reconcillations, fixed charges, energy bill details etc. | - | Each | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
COMPLETETPEXCLNITBOQ.pdf
BOQ • 2.03 MB
BOQ_779768.xls
BOQ • 0.43 MB
162474504.pdf
Tender Documents • 6.08 MB
162474506.html
Tender Documents • 0.06 MB
162590510.pdf
Tender Documents • 0.24 MB
164353240.pdf
Tender Documents • 0.30 MB
165179587.pdf
Tender Documents • 0.28 MB
166035045.pdf
Tender Documents • 0.29 MB
166927140.pdf
Tender Documents • 0.31 MB
167327547.pdf
Tender Documents • 0.32 MB
167964782.pdf
Tender Documents • 18.79 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .