Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Qualified |
| 2 | Accepted-Technical | Accepted-Technical Qualified |
| 3 | Accepted-Technical | Accepted-Technical Qualified |
| 4 | Accepted-Technical | Accepted-Technical Qualified |
| 5 | Accepted-Technical | Accepted-Technical Qualified |
Tender Value
₹59.3 L
EMD Value
₹59,330
Closing Date
2 Jul 2026, 5:30 pmClosed
Divisional Officer
RURAL WORKS DIVISION NO.II, MALKANGIRI
PWD Road - MV 114 A_Road_2nos Boxcell culvert-1X6X3-_At 1.100 km and 1.300 km
2026_CERWI_132509_1
03/2026-27
Open Tender
Civil Works - Roads
Percentage
60 days
Malkangiri
2 documents required · 2 mandatory
₹10,000
₹59,330
Yes
16 Aug 2026
22 Jun 2026
3 Jul 2026
22 Jun 2026
2 Jul 2026
22 Jun 2026
22 Jun 2026 - 1 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in cutting in hard soil within the initial lead and lift including rough dressing and breaking the clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3 Mtr. In depth etc. complete as per direction of the Engineer-in-charge. | 597.06 | cum | 282.88 | ₹1,68,896.33 |
| 2 | Providing andlaying mannually with sand in regular layers not exceeding 150mm thick including all labour materials T&P royalty etc. | 161.84 | cum | 764.99 | ₹1,23,805.98 |
| 3 | Cement concrete of M-15 grade with 40mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying etc complete. | 259.76 | cum | 5,598.72 | ₹14,54,345.9 |
| 4 | Cement concrete of M-15 grade with 40mm and down grade black hard granite (crusher broken) stone chips including hoisting and laying etc complete. Above D wall | 116.68 | cum | 5,701.86 | ₹6,65,293.02 |
| 5 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete. Below bed level in foundation RAFT | 58.5 | cum | 6,865.37 | ₹4,01,624.15 |
| 6 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete.HUNCH | 54.3 | cum | 8,908.22 | ₹4,83,716.35 |
| 7 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete.DECK SLAB | 70.2 | cum | 9,816.84 | ₹6,89,142.17 |
| 8 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete.WEARGIN COAT | 8.77 | cum | 6,864.02 | ₹60,224.91 |
| 9 | R.C.C. work of M-25 using 20mm and down graded chips including cost of all materials labour T&P etc complete.HAND RAIL | 31.12 | cum | 2,394.18 | ₹74,506.88 |
| 10 | Providing M.S reinforcement for R.C.C work including cutting, bending, binding, tying the grills and placing in position including cost of steel etc. with all labour, materials, T&P, taxes and CESS etc. complete as per specification and direction of the E | 130 | qtl | 9,587.88 | ₹12,46,424.4 |
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 6.19 MB
Tendernotice_1.pdf
PDF • 0.78 MB
BOQ_597201.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .