| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.8 LAccepted-AOC KUMBAKONAM | ₹16.8 L | L1 | Accepted-AOC Lowest Amount Quoted |
| 2 | L2₹17.4 L+₹55,636.75 (3.30%)Rejected-Finance | ₹17.4 L+₹55,636.75 (3.30%) | L2 | Rejected-Finance Highest Amount Quoted |
Tender Value
₹17.0 L
EMD Value
₹35,000
Closing Date
28 Aug 2024, 3:00 pmClosed
District Collector,Mayilduthurai
District Collector Office,Mayiladuthurai
Periodic Renewal of PMGSY Roads Santhapadugai road Km 0/0 - 0/870 in Kollidam Block in Mayiladuthurai District (Pkg No TN09-184R) Under PMGSY 2023-2024 Incentive Grand
2024_RDTN_136009_1
DIPR/3092/TENDER/2024 dt16.08.2024
Open Tender
Civil Works - Roads
Item Rate
120 days
Santhapadugai
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
₹35,000
District Collector Office,Mayiladuthurai
6 Dec 2024
19 Aug 2024
28 Aug 2024
20 Aug 2024
28 Aug 2024
20 Aug 2024
21 Aug 2024
Amount
Periodic renewal and 5 year routine maintenance of MRL - 33 Santhapadugai Road Km 0/0 - 0/870 in Old Package No.TN 09-184/ New Package no. TN 09-184R at Kollidam Block of Mayiladuthurai District
Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 50mm using 45mm IRC size HBG metal
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BITUMINOUS CONCRETE 25 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 25mm thick using 0.13cum of 13.20-11.20mm. 0.17cum of 6.7-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
White washing for existing culverts
10.00m span culvert
HM stones
Providing Name board
Road marking
Repainting information board
Clearing the light jungle including all labour charges for burrying and burning etc., complete.
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting sidedrain etc, complete. as per SS20 A
Collection and supply of US Gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading etc.complete,
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to berectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
KANNAN A
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .