| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹53.5 LAdmitted-Fee/PreQual/Technical/Finance | ₹53.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹59.0 L+₹5.5 L (10.3%)Admitted-Fee/PreQual/Technical/Finance 6 184 SAMIMUTHANPATTI MARAMBADI | DINDIGUL | TAMIL NADU | ₹59.0 L+₹5.5 L (10.3%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹61.9 L+₹8.4 L (15.7%)Admitted-Fee/PreQual/Technical/Finance | ₹61.9 L+₹8.4 L (15.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹65.4 L+₹11.9 L (22.2%)Admitted-Fee/PreQual/Technical/Finance | ₹65.4 L+₹11.9 L (22.2%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹66.0 L+₹12.5 L (23.4%)Admitted-Fee/PreQual/Technical/Finance | ₹66.0 L+₹12.5 L (23.4%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | NPGBROTHERS L17 | K.Durai L18 | m senthil kumar L5 | P P INFRA THENI L14 | SENTHAAMARAI CONSTRUCTIONS L6 | M L S STHAPATHY & CO L13 | Madura Construction L9 | K DURAIYAN L19 | K.VASANTHAKUMAR L3 | A ULAGU LAKSHMANAN L10 | KP CONSTRUCTIONS L2 | THREE SQUARE DESIGNERS L1 | P S STALIN CONTRACTOR L15 | jawahar constructions L8 | SHRI BRINDHAVAN BUILDERS L12 | KVR BUILDERS L11 | KLK Construction L16 | SPS AND CO L7 | S K G CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and subsoils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers | 502 | Cum | 150 ₹75,300 | 240 ₹1,20,480 | 285.26 ₹1,43,200.52 | 190 ₹95,380 | 134 ₹67,268 | 210 ₹1,05,420 | 10 ₹5,020 Lowest | 225 ₹1,12,950 | 277 ₹1,39,054 | 80 ₹40,160 | 180 ₹90,360 | 90 ₹45,180 | 325 ₹1,63,150 | 200 ₹1,00,400 | 350 ₹1,75,700 | 220 ₹1,10,440 | 200 ₹1,00,400 | 150 ₹75,300 | 100 ₹50,200 |
| 2.00 | Supplying and filling in foundation and basement with M sand in layers of not more than 15cm.thick well rammed watered and compactedetc., complete compIying with standard specification | 323 | cum | 2,750 ₹8,88,250 | 2,200 ₹7,10,600 | 423 ₹1,36,629 Lowest | 2,000 ₹6,46,000 | 1,150 ₹3,71,450 | 1,710 ₹5,52,330 | 1,900 ₹6,13,700 | 2,655 ₹8,57,565 | 1,295 ₹4,18,285 | 1,500 ₹4,84,500 | 2,000 ₹6,46,000 | 2,375 ₹7,67,125 | 2,016 ₹6,51,168 | 2,000 ₹6,46,000 | 1,970 ₹6,36,310 | 1,112.5 ₹3,59,337.5 | 1,450 ₹4,68,350 | 1,800 ₹5,81,400 | 500 ₹1,61,500 |
| 3.00 | Providing ,Laying Spreading and compacting graded stone aggregate for wet Mix Macadam 25mm thick lncluding premixing the materials with water at OMC in machnancial Mix Plant Conveyance of mixed materilas by Tipper to Site, laying in uniform Iayers using pavers in sub Base base course On Well Prepared Surface and compacting with Vibratory Roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental chargegsetc,.... completed as per claus 406 of morth | 480 | cum | 3,100 ₹14,88,000 | 2,400 ₹11,52,000 | 2,598 ₹12,47,040 | 2,200 ₹10,56,000 | 1,385 ₹6,64,800 | 2,700 ₹12,96,000 | 1,950 ₹9,36,000 | 3,650 ₹17,52,000 | 1,813 ₹8,70,240 | 2,500 ₹12,00,000 | 2,300 ₹11,04,000 | 2,425 ₹11,64,000 | 2,574 ₹12,35,520 | 1,900 ₹9,12,000 | 2,240 ₹10,75,200 | 5,133 ₹24,63,840 | 2,426 ₹11,64,480 | 2,200 ₹10,56,000 | 1,000 ₹4,80,000 Lowest |
| 4.00 | Supplying and laying of lnterlocking Paver Block Stone 83mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and labour charges... etc complete complying with the standard specification and as directed by the departmental officers | 3,190 | Sqm | 1,300 ₹41,47,000 | 1,500 ₹47,85,000 | 1,230 ₹39,23,700 | 1,330 ₹42,42,700 | 1,450 ₹46,25,500 | 1,250 ₹39,87,500 | 1,350 ₹43,06,500 | 1,365 ₹43,54,350 | 1,165 ₹37,16,350 | 1,300 ₹41,47,000 | 950 ₹30,30,500 | 770 ₹24,56,300 Lowest | 1,287 ₹41,05,530 | 1,290 ₹41,15,100 | 1,250 ₹39,87,500 | 930 ₹29,66,700 | 1,398 ₹44,59,620 | 1,250 ₹39,87,500 | 1,500 ₹47,85,000 |
| 5.00 | Cement concrete 1:5:10 (one cement, fine sand and ten hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15cm thick well rammed consolidated and curing etc... | 5.1 | cum | 6,900 ₹35,190 | 5,500 ₹28,050 | 5,848 ₹29,824.8 | 8,500 ₹43,350 | 4,300 ₹21,930 | 5,300 ₹27,030 | 5,550 ₹28,305 | 8,150 ₹41,565 | 4,312 ₹21,991.2 | 5,000 ₹25,500 | 5,000 ₹25,500 | 4,500 ₹22,950 | 7,020 ₹35,802 | 5,000 ₹25,500 | 5,300 ₹27,030 | 3,000 ₹15,300 Lowest | 5,500 ₹28,050 | 5,000 ₹25,500 | 3,000 ₹15,300 Lowest |
| 6.00 | Brick work in following cement mortor 1:5using best quality burnt clay brick of size 9”x4 3/8 x 2 ¾” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including cost mortor platicizer curing etc... complete complying with standard specification as directed by departmental officers, | 14.14 | Cum | 7,800 ₹1,10,292 | 6,500 ₹91,910 | 8,007 ₹1,13,218.98 | 8,500 ₹1,20,190 | 3,600 ₹50,904 | 7,600 ₹1,07,464 | 6,300 ₹89,082 | 11,355 ₹1,60,559.7 | 5,824 ₹82,351.36 | 6,000 ₹84,840 | 7,500 ₹1,06,050 | 5,600 ₹79,184 | 8,775 ₹1,24,078.5 | 7,000 ₹98,980 | 7,460 ₹1,05,484.4 | 5,000 ₹70,700 | 7,500 ₹1,06,050 | 5,500 ₹77,770 | 3,500 ₹49,490 Lowest |
| 7.00Sub Total | ||||||||||||||||||||||
| 8.00 | GST @ 18% | 1 | GST | 12,13,925.76 ₹12,13,925.76 | 12,39,847.2 ₹12,39,847.2 | 10,06,850.39 ₹10,06,850.39 | 11,16,651.6 ₹11,16,651.6 | 10,44,333.36 ₹10,44,333.36 | 10,93,633.92 ₹10,93,633.92 | 10,76,149.26 ₹10,76,149.26 | 13,10,218.15 ₹13,10,218.15 | 9,44,688.88 ₹9,44,688.88 | 10,76,760 ₹10,76,760 | 9,00,433.8 ₹9,00,433.8 | 8,16,253.02 ₹8,16,253.02 Lowest | 11,36,744.73 ₹11,36,744.73 | 10,61,636.4 ₹10,61,636.4 | 10,81,300.39 ₹10,81,300.39 | 10,77,537.15 ₹10,77,537.15 | 11,38,851 ₹11,38,851 | 10,44,624.6 ₹10,44,624.6 | 9,97,468.2 ₹9,97,468.2 |
Tender Value
₹83.1 L
EMD Value
₹51,600
Closing Date
16 Sept 2026, 3:00 pmClosed
Joint Commissioner/Executive Officer
Joint Commissioner/Executive Officer, Head Office, Arulmigu Dhandayuthapani Swamy Temple Palani
Providing Paver Block Flooring Area on North Side of Main Admin Building in Arulmigu Palaniandavar Womence Arts College at Ottanchattram in Dindigul District.
2026_HRCE_698962_1
2/2026-2027
Open Tender
Civil Works
Works
180 days
Oddanchatram
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹51,600
16 Sept 2026
28 Aug 2026
16 Sept 2026
28 Aug 2026
16 Sept 2026
1 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and subsoils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers | 502 | Cum | - | - |
| 2 | Supplying and filling in foundation and basement with M sand in layers of not more than 15cm.thick well rammed watered and compactedetc., complete compIying with standard specification | 323 | cum | - | - |
| 3 | Providing ,Laying Spreading and compacting graded stone aggregate for wet Mix Macadam 25mm thick lncluding premixing the materials with water at OMC in machnancial Mix Plant Conveyance of mixed materilas by Tipper to Site, laying in uniform Iayers using pavers in sub Base base course On Well Prepared Surface and compacting with Vibratory Roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental chargegsetc,.... completed as per claus 406 of morth | 480 | cum | - | - |
| 4 | Supplying and laying of lnterlocking Paver Block Stone 83mm thick Over a base layer of crushed stone sandfilling incl. Cost of materials laying and labour charges... etc complete complying with the standard specification and as directed by the departmental officers | 3,190 | Sqm | - | - |
| 5 | Cement concrete 1:5:10 (one cement, fine sand and ten hard broken stone jelly) using 40mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15cm thick well rammed consolidated and curing etc... | 5.1 | cum | - | - |
| 6 | Brick work in following cement mortor 1:5using best quality burnt clay brick of size 9”x4 3/8 x 2 ¾” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including cost mortor platicizer curing etc... complete complying with standard specification as directed by departmental officers, | 14.14 | Cum | - | - |
| 7 | Sub Total | - | - | - | - |
| 8 | GST @ 18% | - | GST | - | - |
stage.html
html • 0.05 MB
finance_840204.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.49 MB
Bookled.pdf
Tender Documents • 0.95 MB
BOQ_840204.xls
BOQ • 0.28 MB
DRAWING.pdf
Additional Documents • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .