| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-AOC | ₹2.0 Cr Quoted ₹1.7 Cr | L1 | Accepted-AOC Accepted by Tender Awarded Committee |
| 2 | L2₹1.7 Cr+₹3.3 L (1.91%)Rejected-Finance NO 17 NEW CAUVERY NAGAR THANJAVUR 613 001 | THANJAVUR | TAMIL NADU | 613001 | ₹1.7 Cr+₹3.3 L (1.91%) | L2 | Rejected-Finance After accepting L1 Bidder L2 bidder will be rejected |
| Sl No | Description | Qty | Unit | SRI JAGATHI CONSTRUCTION L2 | Karunaharan L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth. Data worked out for 48 m3 per day/8 hrs. | 753 | Cum | 384 ₹2,89,152 | 376 ₹2,83,128 Lowest |
| 2.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 186 | Cum | 2,641 ₹4,91,226 | 2,591 ₹4,81,926 Lowest |
| 3.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 720 | Cum | 1,191 ₹8,57,520 | 1,169 ₹8,41,680 Lowest |
| 4.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 127 | Cum | 6,617 ₹8,40,359 | 6,491 ₹8,24,357 Lowest |
| 5.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for Flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means | 89 | Cum | 6,617 ₹5,88,913 | 6,491 ₹5,77,699 Lowest |
| 6.00 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by mechanical means | 130 | Cum | 8,281 ₹10,76,530 | 8,123 ₹10,55,990 Lowest |
| 7.00Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | |||||
| 7.01 | In foundation and basement | 179 | Cum | 9,466 ₹16,94,414 | 9,286 ₹16,62,194 Lowest |
| 7.02 | In Ground floor | 44 | Cum | 9,612 ₹4,22,928 | 9,429 ₹4,14,876 Lowest |
| 8.00 | Vacum dewatering on freshly laid and thoroughly vibrated concrete surface to produce a homogeneous and smooth concrete surface .Suction matshall be spread over the levelled fresh concrete surface and shall be connected by the suction hose to the vaccum pump for dewatering of surplus water in the concrete . After dewatering is complete , the concrete surface is trawled with minimum two passes to achieve a wear resistance concrete surface | 600 | Sqm | 69 ₹41,400 | 67 ₹40,200 Lowest |
Tender Value
₹1.7 Cr
EMD Value
₹2.0 L
Closing Date
13 Oct 2025, 5:45 pmClosed
Executive Engineer
Tamil Nadu State Agricultural Marketing Board, CIPET Road, Thiru.Vi.Ka industrial estate, Guindy, Chennai-32
Construction Of 1000 MT Storage Godown at Kumbakonam RM in Thanjavur District.
2025_TAMBC_607767_1
TNSAMB-2025-32-01
Open Tender
Civil Works
Lump-sum
300 days
at Kumbakonam RM in Thanjavur District.
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.0 L
4 Dec 2025
23 Sept 2025
14 Oct 2025
23 Sept 2025
13 Oct 2025
23 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .