Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹88,426.36Admitted-Fee/PreQual/Technical/Finance | -40.00% | ₹88,426.36 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.0 L+₹13,116.58 (14.8%)Admitted-Fee/PreQual/Technical/Finance | -31.10% | ₹1.0 L+₹13,116.58 (14.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.0 L+₹14,737.73 (16.7%)Admitted-Fee/PreQual/Technical/Finance | -30.00% | ₹1.0 L+₹14,737.73 (16.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹1.2 L+₹34,191.52 (38.7%)Admitted-Fee/PreQual/Technical/Finance | -16.80% | ₹1.2 L+₹34,191.52 (38.7%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
8 Aug 2026, 5:00 pmClosed
Executive Engineer REW Kishtwar
Hall No. 4 Executive Engineer REW Kishtwar
BOQ
2026_RDPR_317415_29
eNITNo 38 of REW KISHTWAR 2026-27Dated.23.07.2026
Open Tender
Civil Works
Percentage
30 days
KISHTWAR
NIT
2 documents required · 2 mandatory
₹600
Executive Engineer REW Kishtwar
₹3,000
13 Aug 2026
23 Jul 2026
10 Aug 2026
23 Jul 2026
8 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Community information board with size of 4-0*3-0*0-9 above plinth level with having degree angle slope in brick masonry (1:4) mix including plaste paint lettering all compelete including lead lift and caariage | - | Nos | - | - |
| 2 | Demolishing stone rubblemasonrymanually/bymechanical means includingstacking of serviceable material and disposal of unserviceable material within 50 meters lead | - | CUM | - | - |
| 3 | P / L OF Dry stone solling (dry metal ) any kind of thickness | - | CUM | 1 | - |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work1 Foundations, footings, bases for columns | - | SQM | - | - |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 40 mm nominal size) | 1 | CUM | - | - |
| 6 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size | - | CUM | 1 | - |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | - | KG | - | - |
| 8 | C/O Stone | - | CUM | - | - |
| 9 | C/O Sand & BAJREE | 1 | CUM | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_1040371.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .