Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance HOUSE NO 2 BOKAKHAT GOLAGHAT ASSAM 785612 | BOKAKHAT | GOLAGHAT | ASSAM | 785612 | ₹1.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.6 Cr+₹4.0 L (2.56%)Admitted-Finance | ₹1.6 Cr+₹4.0 L (2.56%) | L2 | Admitted-Finance |
| 3 | L3₹1.6 Cr+₹7.5 L (4.77%)Admitted-Finance BIKHUPON CHALIHA GOLAGHAT ASSAM 785621 | GOLAGHAT | GOLAGHAT | ASSAM | 785621 | ₹1.6 Cr+₹7.5 L (4.77%) | L3 | Admitted-Finance |
| 4 | L4₹1.7 Cr+₹8.7 L (5.56%)Admitted-Finance | ₹1.7 Cr+₹8.7 L (5.56%) | L4 | Admitted-Finance |
| 5 | L5₹1.8 Cr+₹25.8 L (16.5%)Admitted-Finance AT ROAD BOKAKHAT ASSAM | ₹1.8 Cr+₹25.8 L (16.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Sri Manoj Pareek L1 | JITU BHUYAN L2 | Mohinis Trade and Construction L3 | DILIP TERANG L4 | M/S. M.P. AGARWALLA L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Clearing and Grubbing of road land including up rooting rank vegitation grass, bush, shrubs, sapllags and tress of girth upto 300 mm removal of stumps of trees cut earlier and diposal of unserviceable materials and staking of serviceable materials to be used or auctioned, up to a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201.. i) By Manual means A. In area of non thorny jungle. | 1.28 | Hect | - | - | - | - | - |
| 2.00 | Construction of sub grade and earthen shoulders with approved materials obtained from borrow pits, with all lifts & lead transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 with a lead up to 1000m as per Technical SpecificationClause 303.1. a) From private land | 5,689.2 | Cum | - | - | - | - | - |
| 3.00 | Construction of Granular sub-base providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80 - 100 KN Static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401. (ii)For Grading II Material | 937.5 | Cum | - | - | - | - | - |
| 4.00 | Providing laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheels steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. (A) By manual Means | 561.98 | Cum | - | - | - | - | - |
| 5.00 | Providind and laying Inter Locking Block Pavement ( M40) having thickness 80mm as per technical specification clause 1504 ( inclusive of Edge restraint and carriage ) | 7,498.3 | Sqm | - | - | - | - | - |
| 6.00 | Excavation for structures :- Earth work in excavation for foundation of structure up to 3m dept as per drawing and technical specification clause 1104…..etc. i) Ordinary soil up to 3m depth | 69.84 | Cum | - | - | - | - | - |
| 7.00 | Bedding of pipe :- i) Type A (concrete cradle bedding) Laying cement conc. as per clause 1105(i) | 33.66 | Cum | - | - | - | - | - |
| 8.00 | Providing and laying RCC pipe NP-3 as per design in single row. Providing and laying RCC pipe NP-3 for culverts on 1st class bedding of granular material in single row including fixing collar with cement mortar 1:2 …..ete….. clause 1106. 1000mm dia. | 30 | RM | - | - | - | - | - |
| 9.00 | Brick masonry work in cement mortar in foundation of head wall …etc….. Clause 1109. (a) Brick masonry in 1:4 Cement mortar. | 49.17 | Cum | - | - | - | - | - |
| 10.00 | Plastering with cement mortar (1:4) 15mm thickness on Brick work in substructure as per technical specification. | 46.98 | Sqm | - | - | - | - | - |
Tender Value
₹1.7 Cr
EMD Value
₹3.5 L
Closing Date
5 Feb 2020, 4:00 pmClosed
Chief Engineer, PWD (Roads), Assam
O/o the Chief Engineer, PWD (Roads), Assam, Chandmari, Guwahati, 781003
Kar/AD19-20/09 Improvement of Road from BBDC road to Bogijan Durga Mandir, Dokhora Bey Gaon under Assam Darshan for the year 2019-20.
2020_PWD_16002_152
CE/Maint/A.D./404/2019/2
Open Tender
Civil Works
Item Rate
270 days
Karbi Anglong
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,200
Empowered Officer, ASRB
₹3.5 L
Yes
O/o the Chief Engineer, PWD (Roads), Assam
5 Mar 2020
25 Jan 2020
6 Feb 2020
25 Jan 2020
5 Feb 2020
25 Jan 2020
25 Jan 2020 - 1 Feb 2020
28 Jan 2020
Amount
Clearing and Grubbing of road land including up rooting rank vegitation grass, bush, shrubs, sapllags and tress of girth upto 300 mm removal of stumps of trees cut earlier and diposal of unserviceable materials and staking of serviceable materials to be used or auctioned, up to a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness as per Technical Specification Clause 201.. i) By Manual means A. In area of non thorny jungle.
Construction of sub grade and earthen shoulders with approved materials obtained from borrow pits, with all lifts & lead transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2 with a lead up to 1000m as per Technical SpecificationClause 303.1. a) From private land
Construction of Granular sub-base providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with 80 - 100 KN Static roller capacity to achieve the desired density, complete as per Technical Specification Clause 401. (ii)For Grading II Material
Providing laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheels steel/vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density grading 3 as per Technical Specification Clause 405. (A) By manual Means
Providind and laying Inter Locking Block Pavement ( M40) having thickness 80mm as per technical specification clause 1504 ( inclusive of Edge restraint and carriage )
Excavation for structures :- Earth work in excavation for foundation of structure up to 3m dept as per drawing and technical specification clause 1104…..etc. i) Ordinary soil up to 3m depth
Bedding of pipe :- i) Type A (concrete cradle bedding) Laying cement conc. as per clause 1105(i)
Providing and laying RCC pipe NP-3 as per design in single row. Providing and laying RCC pipe NP-3 for culverts on 1st class bedding of granular material in single row including fixing collar with cement mortar 1:2 …..ete….. clause 1106. 1000mm dia.
Brick masonry work in cement mortar in foundation of head wall …etc….. Clause 1109. (a) Brick masonry in 1:4 Cement mortar.
Plastering with cement mortar (1:4) 15mm thickness on Brick work in substructure as per technical specification.
Routine Maintanence for 1st year
Routine Maintanence for 2nd year
Routine Maintanence for 3rd year
JITU BHUYAN
Mohinis Trade and Construction
DILIP TERANG
M/S. M.P. AGARWALLA
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.87 MB
Tendernotice_2.pdf
PDF • 0.46 MB
Tendernotice_3.pdf
PDF • 0.05 MB
BOQ_24507.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .