Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.9 LAdmitted-Fee/PreQual/Technical/Finance | ₹5.9 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹6.4 L+₹58,528 (10.0%)Admitted-Fee/PreQual/Technical/Finance | ₹6.4 L+₹58,528 (10.0%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹6.5 L+₹69,440 (11.9%)Admitted-Fee/PreQual/Technical/Finance | ₹6.5 L+₹69,440 (11.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | TE YELLOW CITY BUILDERS L2 | S.V AND CO L1 | VETRI CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete | 1,500 | M3 | 129.8 ₹1,94,700 | 118 ₹1,77,000 Lowest | 132 ₹1,98,000 |
| 2.00 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete. having width of 3m -10m | 1,730 | M3 | 129.8 ₹2,24,554 | 118 ₹2,04,140 Lowest | 132 ₹2,28,360 |
| 3.00 | Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete | 1,730 | M3 | 129.8 ₹2,24,554 | 118 ₹2,04,140 Lowest | 132 ₹2,28,360 |
Tender Value
₹7.8 L
EMD Value
₹7,800
Closing Date
7 Jul 2026, 3:00 pmClosed
THE COMMISSIONER, ERODE CITY MUNICIPAL CORPORATION
246,MEENAKSHI SUNDARANAR SALAI,ERODE
Desilting of channel and Earth work for storm water drain at Annaikattu Odai Surampatti in ward No. 48.
2026_MAWS_680845_1
E1-5348-2026-1-ERODE CITY MUNICIPAL CORPORATION
Open Tender
Civil Works
Works
60 days
ERODE CITY MUNICIPAL CORPOATION
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,800
7 Jul 2026
15 Jun 2026
7 Jul 2026
15 Jun 2026
7 Jul 2026
15 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete | 1,500 | M3 | - | - |
| 2 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete. having width of 3m -10m | 1,730 | M3 | - | - |
| 3 | Earth work excavation deploying earth moving machinery for desilting channel having a width of more than 10m and forming bund on either sides and depositing the earth on banks including jungle clearance etc complete | 1,730 | M3 | - | - |
stage.html
html • 0.02 MB
finance_818215.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
1.pdf
Tender Documents • 0.46 MB
BOQ_818215.xls
BOQ • 0.23 MB
COR.pdf
PDF • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .