Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.9 LAccepted-AOC | L1 | Accepted-AOC L1 Accept | |
| 2 | L2₹21.5 L+₹62,202.24 (2.98%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | PTK CONSTRUCTION L2 | M.R.M.CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Pot Holes For Salem - Cochin road to Kandampalayam KM 0/0-1/46 H/O Kandhampalayam (R - 47 ) | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burryingng and burning etc.,Clearing and grubbing road land including uprooting wild vegetation, grass, bushes ,scrubs,saplings and trees of girths upto 300mm, removal of stumps of such trees cut earlie and disposal of unserviceable material and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm thickness as per technical specification clause 201. etc. complete. | 2,160 | Sqm | 7 ₹15,120 | 6.35 ₹13,716 Lowest |
| 3.00 | Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A | 126 | Cum | 145 ₹18,270 | 140.45 ₹17,696.7 Lowest |
| 4.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 7.04 | Cum | 4,610 ₹32,454.4 | 4,590.86 ₹32,319.65 Lowest |
| 5.00Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) 250 mm thick, including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory Soil Compactor to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as pwe clause 406 of MORTH Rev-5 | |||||
| 6.00 | KM - 0/0 - 1/0 | 15.12 | Cum | 2,690 ₹40,672.8 | 2,679.9 ₹40,520.09 Lowest |
| 7.00 | KM - 1/0 - 1/46 | 16.6 | Cum | 2,690 ₹44,654 | 2,679.9 ₹44,486.34 Lowest |
| 8.00Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | |||||
| 9.00 | KM - 0/0 - 1/0 | 219.64 | Sqm | 100 ₹21,964 | 83.32 ₹18,300.4 Lowest |
| 10.00 | KM - 1/0 - 1/46 | 165.99 | Sqm | 100 ₹16,599 | 83.32 ₹13,830.29 Lowest |
Tender Value
₹21.2 L
EMD Value
₹21,180
Closing Date
7 Nov 2025, 3:00 pmClosed
BDO BP
BDO BP
Rural Roads Maintenance at perundurai 2025 26
2025_RDTN_616812_1
2520/2025/A2
Open Tender
Civil Works - Roads
Item Rate
120 days
Perundurai Block
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹21,180
7 Nov 2025
24 Oct 2025
7 Nov 2025
24 Oct 2025
7 Nov 2025
24 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_737059.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_737059.xls
BOQ • 0.32 MB
Techbid.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .