Tender Value
₹10.3 L
EMD Value
₹20,680
Closing Date
12 May 2026, 10:00 amClosed
Municipal Engineer m.C Sirsa
Municipal Engineer m.C Sirsa
Repair and Installation of rcc slab on drain located at various road in mc limit,mc sirsa
2026_HRY_519539_1
SIRSA Tender
Open Tender
Miscellaneous
M.C Sirsa
Repair and Installation of rcc slab on drain located at various road in mc limit,mc sirsa
3 documents required · 3 mandatory
₹1,000
₹20,680
Yes
12 May 2026
5 May 2026
12 May 2026
5 May 2026
12 May 2026
5 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Works | |||||
| 1.01 | [11.6.1]15 mm cement plaster on the rough side of single or half brick wall of mix : 1. 1:4 (1 cement: 4 fine sand) [Through Rate] | 230 | Sqm | 138 | ₹31,740 |
| 1.02 | [6.16]Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor four level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate] | 70.08 | cum | 6,113 | ₹4,28,399.04 |
| 1.03 | [6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Through Rate] | 139.36 | Sqm | 282 | ₹39,299.52 |
| 1.04 | [6.34.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect above plinth level Note:- Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more. [Through Rate] | 7,000 | Kg. | 68 | ₹4,76,000 |
| 1.05 | [7.20.2]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 2. Cement Mortar 1:6 (1 cement : 6 coarse sand) [Through Rate] | 14.03 | cum | 4,146 | ₹58,168.38 |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
BOQ_598437.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid