Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical OK |
| 2 | Accepted-Technical | Accepted-Technical OK |
| 3 | Rejected-Technical | Rejected-Technical Dis-Qualified due to bidder has not submitted networth and balance sheet of last financial year |
Tender Value
₹6.2 Cr
EMD Value
₹3.1 L
Closing Date
15 Apr 2026, 5:30 pmClosed
CMO SONKATCH
CMO SONKATCH
Interception And Diversion of Nallahs with STP works Project of Sonkatch town under SBM 2.0
2026_UAD_490875_1
500 Date 13.03.2026
Open Tender
Civil Works - Water Works
Lump-sum
365 days
Sonkatch
Prequalification conditions, wherever applicable, are given in the Bid Data Sheet
3 documents required · 3 mandatory
₹20,000
₹3.1 L
Sonkatch
6 May 2026
16 Mar 2026
17 Apr 2026
16 Mar 2026
15 Apr 2026
16 Mar 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1 Design and build sewage treatment plant of installed capacity 3.00 MLD and all appurtenant structures and allied works;
2 Construction of Rcc sump well along with providing and installing pumps and pumping main comprising of DIK7 class pipe of 150- & 300-mm diameter having length of 1800 & 50 m respectively from sump well to STP
3 Construction of 2 Nos Interception Diversion Structure.
(I&D-1= L-25 m, H-1.0 m, FTL-1.55 MLD)
(I&D-2= L-11 m, H-1.0 m, FTL-1.15 MLD)
4 Providing and laying of HT Feeder having the length of 2.40 kms. and Electrical 1 Nos. Substations
5 Reuse of the Treated Sewer water for the Green space comprising of Dik7 pipe of 150mm diameter having the length of 3200 meters. | 1 | Lump-Sum | 6,16,00,000 | ₹6,16,00,000 |
| 2 | Operation and Maintenance Cost For 1st Years | 1 | Lump-Sum | 12,61,000 | ₹12,61,000 |
| 3 | Operation and Maintenance Cost For 2nd Years | 1 | Lump-Sum | - | - |
| 4 | Operation and Maintenance Cost For 3rd Years | 1 | Lump-Sum | - | - |
| 5 | Operation and Maintenance Cost For 4th Years | 1 | Lump-Sum | - | - |
| 6 | Operation and Maintenance Cost For 5th Years | 1 | Lump-Sum | - | - |
| 7 | Operation and Maintenance Cost For 6th Years | 1 | Lump-Sum | - | - |
| 8 | Operation and Maintenance Cost For 7th Years | 1 | Lump-Sum | - | - |
| 9 | Operation and Maintenance Cost For 8th Years | 1 | Lump-Sum | - | - |
| 10 | Operation and Maintenance Cost For 9th Years | 1 | Lump-Sum | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.62 MB
DocumentLWM.pdf
Tender Documents • 2.15 MB
DPRLWM.pdf
Other Document • 8.62 MB
Annexure-E_IandD.pdf
Other Document • 2.69 MB
BOQ_579438.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .