| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.5 CrAccepted-AOC HISAR PHE CIRCLE HARYANA | ₹1.5 Cr | 1 | Accepted-AOC Due to lower rate |
| 2 | 2₹2.0 Cr+₹48.5 L (31.5%)Rejected-AOC | ₹2.0 Cr+₹48.5 L (31.5%) | 2 | Rejected-AOC Due to higher rate |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
29 Sept 2023, 3:00 pmClosed
EXECUTIVE ENGINEER
EE PHE Division Narwana
RENOVATION AND UPGRADATION OF WATER SUPPLY SCHEME AND BALANCE DISTRIBUTION PIPE LINE
2023_HRY_314390_1
2023CDF89E1E F919 4A47 9631 A758955DC2BD570PUH
Open Tender
Civil Works
Works
365 days
NARWANA
4 documents required · 4 mandatory
₹15,000
₹2.6 L
Yes
27 Dec 2023
23 Sept 2023
29 Sept 2023
23 Sept 2023
29 Sept 2023
23 Sept 2023
Amount
Provision for construction of 1 No. Toilet at water works / boosting station including cost of material, labour etc. complete in all respect.
Provision for Development of water works land such as plantation, grassi lawn, land scaping, plinth protection, making kerb etc. complete in all respect.
Construction of water purification plant of 1.00 MLD capacity comprising of labour for DI pipe from existing raw aer main/pump, inlet box, inlet channel , Alum dozing, Flash mixing, Tapeard flocculator, Rectangular setting tank, filter box, over head reservior for back wash including pump sets and and electric control panel, sluice valves, DI PIpes, Di specials , manhole covers, air scour equipment, Chemical house including chlorination equipment and arrangeent of flow measurement and sand bed complete in all respect as per NIT. Labour rate for fixing DI, S/S class K9 ISI marked pipes including cost of DI Specials/fitting, ISI marked PN 1.6 sluice valves including cost of exacavation, laying, cutting , jointing , threading and jointing maerial in horizontal length including connections complete in all respects. From existing raw water main pump to inlet box of filter unit to clear water tank. Note - DI pipe will be supplied by the department free of cost. (BASED ON SCADA SYSTEM-1.00 MLD)
Operation and Maintenance for complete scope of work of 1 MLD WTP mentioned in the DNIT in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months during defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate). complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period ( operation only)
1st year Operation and maintenance after defect liability period
2nd year Operation and maintenance
3rd year Operation and maintenance
4th year Operation and maintenance
5th year Operation and maintenance
Bidder Name
Amount
Umesh Kumar Contractor(GSTN-NA)
KAILASH SINGLA CONTRACTOR(GSTN-NA)
Umesh Kumar Contractor
Umesh Kumar Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .