Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.9 Cr+₹12.2 L (4.34%)Rejected-AOC | ₹2.9 Cr+₹12.2 L (4.34%) | L2 | Rejected-AOC Rejected |
Tender Value
₹3.4 Cr
EMD Value
₹3.4 L
Closing Date
23 Jun 2026, 5:00 pmClosed
Executive Officer Brajrajnagar Municipality
Brajrajnagar Municipality At-Lamtibahal PO-Brajrajnagar Dist-Jharsuguda
Public Library
2026_ORULB_130360_2
BRJNRM -03/2026-27
Open Tender
Civil Works - Buildings
Percentage
240 days
Brajrajnagar Municipality
Please refer Tender documents
2 documents required · 2 mandatory
₹10,000
₹3.4 L
Yes
3 Aug 2026
3 Jun 2026
24 Jun 2026
3 Jun 2026
23 Jun 2026
3 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A-1-GROUND FLOOR:- Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of
slopes and bed to design section and depositing the the excavated materials away from work site as per the specification and as directed by the Engineering- charge within an initial lead of 1km from the place of excavation complete. | 0.2 | One Cum | 0.6 | ₹0.12 |
| 2 | Supply & Filling in Foundation and Plinth with excavated materials including watering and ramming as directed by Engineer-in- charge for cum. | 0.8 | One Cum | 1 | ₹0.8 |
| 3 | Filling foundation and plinth with sand and well watered and rammered etc. complete including cost of sand. | 0.12 | One Cum | - | - |
| 4 | Cement concrete (1:3:6) by using 4 cm size B.H.G metal including cost, conveyence etc. complete. | 0.2 | One Cum | 1 | ₹0.2 |
| 5 | R.C.C. works (M-20) in foundation, footing, beams, plinth band,footing ,base of columns,lintels, roofs, chhajas mass concrete etc. using 10 mm & 20 mm size black hard granite crusher broken chips including hoisting, lowering, laying and compacting, watering, curing for 28 days including centering and shuttering and finished the exposed surface smooth including all cost, conveyances, royalties and taxes of all materials and cost of labour with T & P required for the work etc. all complete in all respect but excluding cost of Steel and labour charges for bending and binding as per the Direction of the Engineer in charge. A)FOUNDATION, FOOTING AND BASE OF COLUMN | 0.6 | One Cum | 0.2 | ₹0.12 |
| 5.1 | B)PLINTH BEAM | 0.8 | One Cum | 0.2 | ₹0.16 |
| 5.2 | C)ALL KINDS OF BEAMS AND COLUMN | 0.6 | One Sqm | - | - |
| 5.3 | D)G.F SLAB,LANDING AND CHAJJA | 0.99 | One Sqm | - | - |
| 5.4 | E)G.F STAIRCASE EXCLUDING LANDING | - | One Sqm | - | - |
| 5.5 | F)LINTEL BAND | 1 | One Sqm | 0.2 | ₹0.2 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.85 MB
BOQ_593768.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .