| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC | ₹2.8 Cr | L1 | Accepted-AOC Financial bid accepted |
| 2 | L2₹2.8 CrRejected-Finance RAHMANPUR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹2.8 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹3.1 CrRejected-Finance 424 1A OUTSIDE DATIA GATE NEAR RAGHURAJ SCHOOL PATHORIYA JHANSI U P | JHANSI | UTTAR PRADESH | 284001 | ₹3.1 Cr | L3 | Rejected-Finance L3 |
| 4 | L4₹3.2 CrRejected-Finance | ₹3.2 Cr | L4 | Rejected-Finance L4 |
| 5 | L5₹3.7 CrRejected-Finance 132 C P MISSION COMPOUND JHANSI U P | JHANSI | JHANSI | UTTAR PRADESH | ₹3.7 Cr | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹22.8 L
Closing Date
26 Dec 2025, 12:00 pmClosed
S.E, Jhansi Circle, P.W.D., Jhansi
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
Construction work from Saidpur to Bhairoghat Temple Link Road.
2025_CEJNS_1099752_1
9518/44 C-jhs-cir/25, Date 05.12.2025
Open Tender
Civil Works - Roads
365 days
Lalitpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,100
₹22.8 L
Yes
Office of the S.E, Jhansi Circle, P.W.D., Jhansi
6 Mar 2026
18 Dec 2025
26 Dec 2025
18 Dec 2025
26 Dec 2025
18 Dec 2025
20 Dec 2025
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (1 Km. Cartage)
Laying and spreading available soil in the subgrade on a prepared surface, pulversing, mixing the spread soin in place with rotavator with 2 per cent slaked lime having minimum 70 per cent of centents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC to the desired density to form a layer of improved Sub-grade as per Technical Specification Clause 403.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting stone aggregates of specific sizes to Water bound macadam-2 specification including spreading in uniform thickness, hand packing, rolling with smooth three wheel 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of course aggregate, watering and compacting to the reqiured density Grading 2 as per MORD Technical Specification Clause 405.
Providing, laying, spreading and compacting stone aggregates of specific sizes to Water bound macadam-3 specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of course aggregate, watering and compacting to the reqiured density Grading 3 as per MORD Technical Specification Clause 405
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means as per Technical Specification Clause 502
Providing and applying tack coat with Bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with air compressor as per Technical Specification Clause 503.
Providing laying & rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates using VG-10 grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a three wheel 80-100 kN static roller capacity, finished to required level and grades to be followed by Seal coat-C Technical Specification Clause 508.
Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grede and cross fall using Type C as per Technical Specification MORD sepecification no. Clause 510. as per Data Book item No. 5.12 (B) Case - III TypeC
Brick edging on both sides of the road of first class bricks 8 cm (3") wide and 12 cm. 4.5" deep laid with mud mortar Including labour and supply of bricks finished to required template and proper alignment and also including dressing and ramming the excavated earth as directed by Engineer-In-Charge. SI. No. (Chp. 4 No. 765)
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Providing and fixing road safety and signage board, Retro reflectorised informatory sign board (1.2m x 0.90 m) as per IRC:67 made of high intensity grade sheathing fixed over aluminium sheets sporated single mild steel angle iron post 75x75x6 etc. complete including fixing (information regarding scheme and other details).
Earth work in excavation of foundation of structure as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material.
Sand/Stone dust Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9
Providing concrete for plain/reinforced concrete (P.C.C grade M-10) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Stone masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204
Providing concrete for plain/reinforced concrete (P.C.C. grade M-20) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less then 25 kg beyond curtain wall
Providing and applying reinforced cement concrete pipe NP-3 for culvert on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection work, back filling, concrete and masonary works in head walls and parapets Clouse 1106. (For 1000 mm Dia)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.75% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (1.50% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (2.25% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (3% Construction Cost)
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 (1 Km. Cartage)
Laying and spreading available soil in the subgrade on a prepared surface, pulversing, mixing the spread soin in place with rotavator with 2 per cent slaked lime having minimum 70 per cent of centents of CaO, grading with motor grader and compacting with the smooth wheel road roller at OMC to the desired density to form a layer of improved Sub-grade as per Technical Specification Clause 403.
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Providing, laying, spreading and compacting stone aggregates of specific sizes to Water bound macadam-3 specification including spreading in uniform thickness, hand packing, rolling with three wheel 80-100 kN static roller in stages to proper grade and camber, applying and brooming, crushable screening to fillup the interstices of course aggregate, watering and compacting to the reqiured density Grading 3 as per MORD Technical Specification Clause 405
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.
Earth work in excavation of foundation of structure as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious material, dressing of sides and bottom and backfilling with approved material.
Sand/Stone dust Fillling in foundation trenches as per drawing and technical specification Clause 305.3.9
Providing concrete for plain/reinforced concrete (P.C.C grade M-10) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Stone masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204
Providing and laying reinforced cement concrete (R.C.C. Grade M 30) in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202
Providing concrete for plain/reinforced concrete (P.C.C. grade M-20) in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203
Pointing with cement mortar (1:3) on brickwork as per drawing and technical specification Clauses 613.3 and 1204
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7
Construction of flexible apron 1 m thick comprising of loose stone boulders weighing not less then 25 kg beyond curtain wall
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 1st year maintenance cost (0%)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 2nd year maintenance cost (0.25% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 3rd year maintenance cost (0.50% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 4th year maintenance cost (0.75% Construction Cost)
The routine maintenance of above road work including embankment,patri,pavement, road sides and cross drains, hume pipe culvert etc to the required standards and in the manner as defined in CB Condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual Completion Date and ends after five years. (including cost of material T&P labour but excluding GST) for 5th year maintenance cost (1% Construction Cost)
stage.html
html • 0.05 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
T2.pdf
Tender Documents • 1.21 MB
BOQ_2026027.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid