| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.9 CrAccepted-AOC 201 2ND FLOOR IRIS TECH PARK SECTOR 48 SOHNA ROAD GURGAON 122018 HARYANA | GURUGRAM | HARYANA | 122018 | L1 | Accepted-AOC Accepted | |
| 2 | L2₹68.3 Cr+₹1.4 Cr (2.07%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹72.0 Cr+₹5.1 Cr (7.65%)Rejected-Finance HOUSE NO 120P HOUSE NO 120P SECTOR 4 REWARI 123401 | REWARI | HARYANA | 123401 | L3 | Rejected-Finance Rejected | |
| 4 | L4₹76.4 Cr+₹9.5 Cr (14.2%)Rejected-Finance A 1 C C COLONY OPP RANA PARTAP BAGH DELHI 2021R4024 | NEW DELHI | DELHI | 110001 | L4 | Rejected-Finance Rejected | |
| 5 | L5₹77.5 Cr+₹10.6 Cr (15.9%)Rejected-Finance PLOT NO B1 INFOCITY 122004 | REWARI | REWARI | HARYANA | 122004 | L5 | Rejected-Finance Rejected |
Tender Value
₹57.0 Cr
EMD Value
₹1.1 Cr
Closing Date
28 Sept 2021, 5:00 pmClosed
Executive Engineer (EDC), Infra-I, GMDA
Plot no.03, Sector 44 Gurugram
Strengthening and up gradation of 6-Lane in both ways Sector Dividing road of Sector 81A/82A, 81/82, 85/86, 89/90, (NH-8 Rampura Chowk to Pataudi road), Asset Id 66, 67 and 68 Gurugram
2021_HRY_168100_3
Job No. 01/2021/EDC/Infra-I
Open Tender
Civil Works
Works
548 days
Gurugram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 Cr
Yes
Office of SE-IV, GMDA Room no.510
28 Jan 2022
1 Sept 2021
29 Sept 2021
1 Sept 2021
28 Sept 2021
1 Sept 2021
10 Sept 2021
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Milling of distress bituminous layer up to 90 mm depth in single pass with suitable milling machine (capable of milling @200-300 sqm area per Hr.) including picking up milled material and stacking old useful material in PWD/Site to handover material to the department as per direction of Engineer | 2,04,823 | Per sqm | - | - |
| - | Recovery of milling material (80 % of the existing)( The amount computed by rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material recovered from milling of bituminous layer has been calculated taking assumption that 80% of milled material will be retrieved and can be reused. The milled material can only be used in GSB work after modification (bringing it to required specification) after approval from employer.
In case it is not possible to use this material on the work, the agency can take away this material.
The price quoted against the recovery of material shall have minimum reserve price of Rs. 1726/- per cum.) | 14,747.26 | Per cum | - | - |
| - | Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of WMM And GSB layer have been calculated taking assumption that 60% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specification) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material . This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed as Rs.720/- per cum | 28,375.2 | Per cum | - | - |
| - | Dismantling of existing median (Kerbs without Channel ) and to be disposed off as C&D waste. | 9,919 | Per Mtr | - | - |
| - | Recovery of Kerb Stone ( 70% of the total length)( The amount computed by rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Kerb stones obtained from dismantling of existing median, islands has been calculated taking assumption that 70% of existing kerb stones will be retrieved and can be reused.
The retrieved kerb stones can be used in median after approval from the employer.
In case it is not possible to use these kerb stones on the work, the agency can take away this material.
The price quoted against the recovery of existing kerb stones shall have minimum reserve price of Rs. 255/- per m.) | 6,943.3 | Per Mtr | - | - |
| - | Loosening and compaction of sub-grade with existing soil and with replaced new soil of CBR 8% if existing soil is unsuitable up to a depth of 0.5m below from top of subgrade with 98% density as per MORT&H (5th Revision 2013) specifications. Excavated earth can be used for replacement soil as per approval from Engineer-in-charge. | 82,878.03 | Per cum | - | - |
| - | Construction of Granular Sub Base by providing close graded crushed material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per Technical Specificationss clause 401 Grading – 1 (Table 400-1). | 59,283.47 | Per cum | - | - |
| - | Constructing Wet Mix Macadam base complete as per Technical Specificationss Clause 406 (Table 400-13). | 59,373.55 | Per cum | - | - |
| - | Providing and applying Bituminous Prime Coat as per Technical Specificationss Clause 502 @ 7.5 kg/10 sqm. | 2,79,864.69 | Per sqm | - | - |
| - | Providing and applying Bituminous Tack Coat as per Technical Specificationss clause 503 | 5,69,766.88 | Per sqm | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
ApprovedDNIT.pdf
Tender Notice • 21.70 MB
BOQ_245479.xls
BOQ Document • 0.43 MB
82827391.pdf
Tender Document • 0.35 MB
82827398.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .