Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.9 LAccepted-Finance | ₹24.9 L | L1 | Accepted-Finance Lowest Value |
| Sl No | Description | Qty | Unit | S P M ENGINEERING ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00Excavation of Pole/Stay pits | ||||
| 2.00 | Excavation of pole pit up to 27”(8.0m) pole | 200 | Each | 450 ₹90,000 Lowest |
| 3.00 | Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual | 100 | Each | 550 ₹55,000 Lowest |
| 4.00 | Stay bit 4.5” to 5” depth | 100 | Each | 450 ₹45,000 Lowest |
| 5.00 | Hard rock without blasting (where houses are located) | 30 | Each | 1,500 ₹45,000 Lowest |
| 6.00 | Medium rock and debse medium rock without requires blasting | 15 | Each | 700 ₹10,500 Lowest |
| 7.00Erection of Poles | ||||
| 8.00 | PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual | 250 | Each | 550 ₹1,37,500 Lowest |
| 9.00 | PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual | 100 | Each | 650 ₹65,000 Lowest |
| 10.00 | Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/Tubular pole by using JCB or manual | 15 | Each | 650 ₹9,750 Lowest |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
23 Feb 2026, 2:30 pmClosed
SE/SEDC/SLM
o/o of the SE/SEDC/SLM
Works contract for execution of extension Improvement DCW and various works in Suramangalam Sub Division in respect of West Division.
2026_EB_659664_1
SE/SEDC/WC.060/25-26dt.17.2.26
Open Tender
Electrical and Maintenance Works
Works
365 days
West Division
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹25,000
13 Aug 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation of Pole/Stay pits | - | - | - | - |
| 2 | Excavation of pole pit up to 27”(8.0m) pole | 200 | Each | - | - |
| 3 | Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual | 100 | Each | - | - |
| 4 | Stay bit 4.5” to 5” depth | 100 | Each | - | - |
| 5 | Hard rock without blasting (where houses are located) | 30 | Each | - | - |
| 6 | Medium rock and debse medium rock without requires blasting | 15 | Each | - | - |
| 7 | Erection of Poles | - | - | - | - |
| 8 | PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual | 250 | Each | - | - |
| 9 | PSC/ RCC poles/Metal poles above 8.00m by using JCB or manual | 100 | Each | - | - |
| 10 | Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/Tubular pole by using JCB or manual | 15 | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_791476.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].