Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹3.4 L
EMD Value
₹3,450
Closing Date
30 Jun 2026, 5:00 pmClosed
EXECUTIVE OFFICER NAC DIGAPAHANDI
NAC OFFICE DIGAPAHANDI
CONSTRUCTION OF TOILET NEAR BADA MATHA AT DIGAPAHANDI NAC
2026_ORULB_132191_3
DIGNAC-05/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
NAC DIGAPAHANDI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
₹3,450
Yes
2 Jul 2026
18 Jun 2026
2 Jul 2026
18 Jun 2026
30 Jun 2026
18 Jun 2026
18 Jun 2026 - 18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil or gravelly soil within 50m initial lead and 1.50m initial lift including rough dressing breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 0.3m depth and as per direction of the Engineer-in-Charge | 1 | cum | 1 | ₹1 |
| 2 | Providing, supplying, filling in foundation and plinth with sand including watering and ramming with cost, conveyance, royalty, taxes of all materials with all labour, T&P etc., complete. | - | cum | - | - |
| 3 | Cement concrete of proportion (1:4:8) in F&F using 40mm size hbg metal of approved quality including cost, conveyance, taxes & royalty of all materials and labour with T&P etc. complete in all respect . | 1 | cum | 1 | ₹1 |
| 4 | Fly ash bricks of 23 Cm. x 12 Cm. x 8 Cm. size having crushing slrength not less than 75 Kg./Cm2 with cement mortar (1:6) in superstructure including splays, cuttings, circular moldings, watering & curing for 7 days, cost, conveyance, taxes & royalties of all materials, labour with T&P etc. complete in all respect. | 1 | cum | - | - |
| 5 | R.C.C. work M-20 grade with 20mm and down grade black hard granite crusher broken stone chips including hoisting and laying and T&P,Labour ,Materials Roylity etc complete. | 1 | cum | 1 | ₹1 |
| 6 | Labour for cutting,bending, binding of MS Rod and placing it in proper position and cost of MS rod with all cost complete. | 1 | qntl | 1 | ₹1 |
| 7 | Rigid smooth centering and shuttering for R.C.C. works including false works and dismentalling then after casting including cost of materials complete in ground floor. | - | cum | 1 | - |
| 8 | 12mm thick cement plaster in cm (1:6) finished smooth to brick masonry including racking out joints including watering, curing, cost, conveyance, taxes, royalties, labour with T&P etc. complete in all respect. | - | cum | 1 | - |
| 9 | Fixing of tiles in dadoos skirting and risers of steps on 12mm thick cement plaster 1:3 jointed with neat cement slurry mixed with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, taxes & royalties of all materials, labour with T&P complete in all respect. (Ceramic Tiles) | 1 | cum | - | - |
| 10 | Providing & Fixing of tiles in floors treds or steps and landing on 25mm thick bed of cement mortar 1:1 jointed with neat cement slurry mixed with pigments to match the shade of the tiles, including rubbing & polishing etc. complete including cost, conveyance, taxes & royalties of all materials, labour with T&P complete in all respect. | 1 | cum | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.52 MB
NITDTCN.pdf
Tender Documents • 5.51 MB
BOQ_596924.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .