| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 CrAccepted-AOC 304 MAGIZHAMPOO STREET GOMATHIPURAM 6TH MAIN ROAD MADURAI 21 | MADURAI | TAMIL NADU | 625001 | ₹6.3 Cr Quoted ₹6.6 Cr | L1 | Accepted-AOC L1 Contractor |
| 2 | L2₹6.7 Cr+₹12.5 L (1.90%)Rejected-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | ₹6.7 Cr+₹12.5 L (1.90%) | L2 | Rejected-Finance L2 CONTRACTOR |
| Sl No | Description | Qty | Unit | Suganya Constructions L2 | M/s. LUCKY ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00Strengthening and Black topping of Paraipatti Saranthangi road R - 52 | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 1,911.6 | Sqm | 6.42 ₹12,272.47 | 6.3 ₹12,043.08 Lowest |
| 3.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 3,319.31 | Sqm | 23.54 ₹78,136.56 | 23.1 ₹76,676.06 Lowest |
| 4.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 B | 955.8 | Cum | 131.61 ₹1,25,792.84 | 129.15 ₹1,23,441.57 Lowest |
| 5.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 6.00 | Km 0/0 - 1/000 | 562.5 | Cum | 374.5 ₹2,10,656.25 | 367.5 ₹2,06,718.75 Lowest |
| 7.00 | Km 1/0 - 2/000 | 562.5 | Cum | 388.41 ₹2,18,480.63 | 381.15 ₹2,14,396.88 Lowest |
| 8.00 | km 2/0 - 2/700 | 368.44 | Cum | 388.41 ₹1,43,105.78 | 381.15 ₹1,40,430.91 Lowest |
| 9.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 1,493.44 | Cum | 2,173.17 ₹32,45,499 | 2,132.55 ₹31,84,835.47 Lowest |
| 10.00 | Providing and laying Prime Coat over WBM/ WMM surface using 7 Kg of Emulsion Bitumen (SS1) per 10 sqm for preparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 502 of MORTH Rev-5 | 9,956.25 | Sqm | 88.54 ₹8,81,526.38 | 86.89 ₹8,65,098.56 Lowest |
Tender Value
Refer Docs
EMD Value
₹6.7 L
Closing Date
25 Jun 2025, 3:00 pmClosed
Additional collector(D) DRDA Madurai
O/O of Additional collector
Upgradation / Strengthening of 5 nos of Roads in of Madurai District under SASCI (2025-26) Packgage no TN-MDU/01/ SASCI (2025-26)
2025_RDTN_567861_1
DIPR/2876/TENDER/MDU SASCI
Open Tender
Civil Works
Item Rate
180 days
Madurai
Refer tender document
4 documents required · 4 mandatory
₹0
₹6.7 L
O/O of Additional collector DRDA Madurai
1 Nov 2025
12 Jun 2025
25 Jun 2025
13 Jun 2025
25 Jun 2025
19 Jun 2025
19 Jun 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ.xls
BOQ • 0.49 MB
Tenderdocument.pdf
Tender Documents • 0.76 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .