| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.2 CrAdmitted-Finance H NO 96 W NO 9 WARD NO 11 UDHAMPUR PADHA GALI1 UDHAMPUR JAMMU KASHMIR 182101 | UDHAMPUR | JAMMU AND KASHMIR | 182101 | -22.01% | ₹5.2 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.5 Cr+₹22.3 L (4.26%)Admitted-Finance | -18.69% | ₹5.5 Cr+₹22.3 L (4.26%) | L2 | Admitted-Finance |
| 3 | L3₹5.6 Cr+₹37.0 L (7.05%)Admitted-Finance | -16.51% | ₹5.6 Cr+₹37.0 L (7.05%) | L3 | Admitted-Finance |
| 4 | L4₹6.0 Cr+₹78.1 L (14.9%)Admitted-Finance | -10.41% | ₹6.0 Cr+₹78.1 L (14.9%) | L4 | Admitted-Finance |
Tender Value
₹7 Cr
EMD Value
₹14 L
Closing Date
23 Dec 2025, 6:00 pmClosed
SE
bda bharatpur
Widening, strengthening and drainage work from Red Cross Circle to Railway Station
2025_UITBR_516639_1
online nit 25(2025-2026)02 bharatpur Development Authorit
Open Tender
Civil Works
Percentage
bharatpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,500
Secretary, bda
₹14 L
Yes
5 Jan 2026
2 Dec 2025
24 Dec 2025
2 Dec 2025
23 Dec 2025
2 Dec 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Flexible Pavements Dismantling of flexible pavement and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per MoRTH Specification Clause 202
(ii) By Mechanical Means
(A) Bituminous Courses & Granular Courses | 1,100 | Cum | 100 | ₹1,10,000 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer-in-charge. 1: 3: 6 or richer mix. | 400 | Cum | 637 | ₹2,54,800 |
| 3 | Construction of Embankment with Material Obtained from Borrow Pits
(i) Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300-1 and 300-2 with a lead upto 50 m as per MoRTH Specification Clause 305.3
with lead for 10 Km | 2,970 | Cum | 139.75 | ₹4,15,057.5 |
| 4 | (iii) Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 4,400 | Cum | 31 | ₹1,36,400 |
| 5 | 4.2 Granular Sub-Base with Close Graded Material (Table:- 400-1)
Plant mix method
Providing laying spreading and compacting specified graded sand, gravel (crushed stone) as per Table 400-1,400-2 or any other course material as per design mix, as per CBR in sub base course including premixing the material at OMC in wet mix plant, carriage of mixed material spreading in uniform layers with motor grader F.E loader on a prepared base and compacting with vibratory roller to achieve desired density (as per I.S.2720) including all material, labor, machinery, lighting guarding, barricading and maintenance of diversion complete.[MoRTH specification : Clause 401]. By mechanical means. | 2,200 | Cum | 845 | ₹18,59,000 |
| 6 | Wet mix macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406.
By Mechanical Means with all lead | 3,300 | Cum | 1,147 | ₹37,85,100 |
| 7 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering – All work up to plinth level. 1:4:8 ( 1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size). | 1,604 | Cum | 3,302 | ₹52,96,408 |
| 8 | Prime coat
Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 33,000 | Sqm | 31 | ₹10,23,000 |
| 9 | Tack coat
(ii) Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 16,500 | Sqm | 11 | ₹1,81,500 |
| 10 | Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tones per hour using crushed aggregates of specified grading, premixed with bituminous binder minimum @ 4.0 & 4.5 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH Specifications Clause 505 complete in all respects. Bitumen (VG-30)
Grading - II (26.50 mm (Nominal Size))
2*1100*7.5*0.065*2.2 | 2,360 | Tonne | 2,969 | ₹70,06,840 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.12 MB
biddocument.pdf
Tender Documents • 1.21 MB
BOQ_921937.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .