| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.3 LAccepted-AOC 63 S MAHANIRBAN ROAD KOLKATA 700029 | KOLKATA | KOLKATA | WEST BENGAL | 700029 | ₹19.3 L | L1 | Accepted-AOC Lowest Rate offered |
| 2 | L2₹19.7 LRejected-Finance NAWABPUR RAJARHAT KOLKATA 700135 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700135 | ₹19.7 L | L2 | Rejected-Finance Higher Rate offered |
| 3 | L3₹20.0 LRejected-Finance | ₹20.0 L | L3 | Rejected-Finance Higher Rate offered |
Tender Value
₹19.4 L
EMD Value
₹38,711
Closing Date
17 Feb 2026, 11:50 amClosed
AGM(E)-III, WB HIDCO Ltd.
Dhana Dhanya Auditorium, Alipore, Kolkata.
Construction of Sub Structure for hoarding related to Mahakal Mahatirtha in Matigara, Siliguri, Darjeeling.
2026_HIDCO_1002377_2
606/HIDCO/AGM-III/NIT-26/25-26
Open Tender
CIVIL WORKS
10 days
Siliguri
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹38,711
11 Mar 2026
9 Feb 2026
19 Feb 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
Earthwork in excavation of foundation trenches or drains, inall sorts of soil (including mixed soil but excluding laterite or sand stone) including removing, spreading or stacking the spoils within a lead of 75m. as directed.Th eitem includes necessary trimming the sides of trenches, levelling,dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm.
(b)Depthof excavation for additional depth beyond 1,500mm. and upto 3,000mm. but not requiring shoring.
Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand.
Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (a) For works in foundation, basement and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof) a)Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work.
Supplying ready mixed concrete of M30 Grade with well graded stone chips of 20mm nominal size containing designed quantity of cement per Cu.m of wet concrete produced in computerised batching plant under controlled condition using approved superplastisizer,designing concrete mix following I.S.10262 and I.S.456, transporting the mix with agitation in transit mixer to work site depositing the mix on a platform erected for the purpose at required levels of concreting and then placing the mix in its final location of form work, compacting and curing the same complete as per specification & direction of the Engineer-in-charge including computerised batching plant transit mixer with all accessories vibrators etc. inclusive of all other incidental charges in this connection complete but excluding cost of hire charge of platform and its supporting staging which would be paid through separate item. [cement to be supplied by the Manufacturer/ supplier] In ground floor and foundation. (i) Without approved concrete pump
Earthwork in filling in foundation trenches or plinth with good earth, in layers not exceeding 150mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
Add CGST @9% of total amount to Rs.16,26,500.44
Add SGST @9% of total amount to Rs.16,26,500.44
Add Construction Cess @1% of total amount to Rs.16,26,500.44
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
TENDER_DOC.pdf
Tender Documents • 1.73 MB
2911.pdf
Tender Documents • 0.16 MB
BOQ_2456721.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid