| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 CrAdmitted-Finance | ₹8.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.8 CrAdmitted-Finance | ₹8.8 Cr | L2 | Admitted-Finance |
| 3 | L3₹9.2 CrAdmitted-Finance AROMA MANSION LUM DONGSURAK UMPLING RYNJAH SHILLONG 793003 | SHILLONG | EAST KHASI HILLS | MEGHALAYA | 793003 | ₹9.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹9.4 CrAdmitted-Finance | ₹9.4 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical Non- Compliant with the Earnest Money Deposit (EMD Validity Requirement |
| Sl No | Description | Qty | Unit | ALOYSIUS ARENGH L3 | Bimal Kumar Agarwala L2 | GAURAV HARLALKA L1 | Shri.Ziaul Hoque L4 |
|---|---|---|---|---|---|---|---|
| 1.00School | |||||||
| 1.01 | School1 | 1 | Nos | 6,03,99,856.91 ₹6.0 Cr | 5,73,04,238.35 ₹5.7 Cr | 4,24,06,805 ₹4.2 Cr | 5,97,70,650 ₹6.0 Cr |
| 1.02 | School2 | 1 | Nos | 3,13,24,859.08 ₹3.1 Cr | 3,05,00,406.71 ₹3.1 Cr | 4,24,06,805 ₹4.2 Cr | 3,46,85,963 ₹3.5 Cr |
Updated dates
Tender Value
Refer Docs
EMD Value
₹21.5 L
Closing Date
28 Oct 2025, 3:00 pmClosed
Director of School Education and Literacy
Director of School Education and Literacy
Construction of additional facilities at Bajengdoba U.P. School and Daram Union Govt. U.P. School (North Garo Hills)
2025_EDADB_1813_1
SHCDM-II/CW-03/NCB/02
Open Tender
Civil Works
730 days
North Garo Hills
As per RFP
2 documents required · 2 mandatory
₹10,000
Yes
Director
₹21.5 L
Yes
Directorate of School Education and Literacy
13 Feb 2026
24 Sept 2025
28 Oct 2025
24 Sept 2025
28 Oct 2025
10 Oct 2025
25 Sept 2025 - 9 Oct 2025
8 Oct 2025
School
School1
School2
Package No : CW-06 (Lot-2)
Bill of Quantities for Bajengdoba Govt. Upper Primary School
Bill of Quantities
BOQ item No
Earth work in excavation by manual/ mechanical means (Hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in charge. (For site preparation)
All kinds of soil
In ordinary rock
In hard rock (Blasting prohibited)
Same as Item 1.0 above but for each additional 1 m depth or part thereof beyond the initial depth of 1.5 m
All kinds of soil
In ordinary rock
In hard rock (Blasting prohibited)
Earth work in excavation by manual means upto a depth of 2 m below the existing ground level for foundation, trenches of foundations, footings of columns/ walls, retaining wall, septic tank etc. including bailing out water where necessary and removal of surplus earth with all lead and lifts as directed and specified for the following classification of soils.
All kinds of soil (ordinary soil/ hard soil/ dense soil)
In ordinary rock (soft rock/ medium rock/ hard shale)
In hard rock (soft rock/ medium rock/ hard shale) (Blasting prohibited)
Earth work in excavation by mechanical means upto a depth of 2 m below the existing ground level for foundation, trenches of foundations, footings of columns/ walls, retaining wall, septic tank etc. including bailing out water where necessary and removal of surplus earth with all lead and lifts as directed and specified for the following classification of soils.
All kinds of soil (ordinary soil/ hard soil/ dense soil)
In ordinary rock (soft rock/ medium rock/ hard shale)
In hard rock (soft rock/ medium rock/ hard shale) (Blasting prohibited)
Same as Items 3.0 & 4.0 above but for each additional 1 m depth or part thereof beyond the initial depth of 2 m
All kinds of soil
In ordinary rock
In hard rock (Blasting prohibited)
Disposal of surplus earth/ unserviceable material from the work site including loading and unloading complete as directed for a total of 15 km (i.e. 10 km beyond the initial lead of 5 km)
Excavated earth
Excavated rock
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered).
Upto a depth of 1.50 m
Above 1.50 m upto 3.00 m depth
Earthwork in filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, including breaking of clods, consolidating each layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
With available excavated earth
Extra over Item for additional lift of 1.5m or part thereof for all types of soils
Sand filling in plinth in layers not exceeding 150mm in depth including breaking of clods, consolidating by watering and ramming complete as directed (maximum depth 45 cm)
SUB TOTAL
Centering and shuttering including strutting, propping etc. and removal of form for all heights complete and as directed by the Engineer-in-charge.
Shuttering for sides of plain cement concrete work in blinding concrete, plinth protection, copings, sills etc.
Foundations, footings, bases of columns, raft, grade slab etc. for mass concrete (using steel)
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. (using steel)
Suspended floors, roofs, landings, balconies and access platforms, shelves (using steel)
Lintels, beams, plinth beams, girders, bressumers and cantilevers (using steel)
Columns, Pillars, Piers, Abutments, Posts and Struts (using steel)
Stairs/ spiral staircase, (excluding landings) (using timber)
Edges of slabs and breaks in floors and walls (using timber)
Weather shade, Chajjas, corbels etc., including edges (using timber)
Extra for additional height in centering, shuttering wherever required with adequate bracing, propping etc., including cost of de-shuttering and de-centering at all levels, over a height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be measured)
Suspended floors, roofs, landings, beams and balconies (Plan area to be measured) (For total height of 9.90 m (i.e. 6.40m over and above the standard height of 3.5 m)
SUB TOTAL
Plain cement concrete works in foundation bed for footing steps, walls, brick works etc. below plinth level as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately).
1 :3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size)
Providing and laying cement concrete in retaining walls etc. and all works above plinth level such as pilasters, columns, pillars, posts, struts, buttresses, parapets, coping, plain window sills, fillets, sunken floor etc.,, up to first floor level, excluding the cost of centering, shuttering and finishing
1:3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) (For cement concrete screed below floors)
1 :2:4 (1 cement: 2 coarse sand: 4 graded stone aggregate 20mm nominal size)
SUB TOTAL
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per ls: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.
All works up to plinth level
All works above plinth level up to first floor level
Extra for providing richer mixes:
Providing M-30 grade concrete
Extra over item No 14.2 & 15.0 above for each subsequent floor or part thereof above the first floor level.
Supplying, fitting and fixing in position reinforcement bars up to lst floor level, conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20 G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (Rates inclusive of all wastage, lappage, hooks, chairs, anchorage etc. and no measurement for the same is required)
Thermo-Mechanically Treated bars
quintal
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
Package No : CW-06 (Lot-2)
Bill of Quantities
BOQ item No
Earth work in excavation by mechanical means upto a depth of 2 m below the existing ground level for foundation, trenches of foundations, footings of columns/ walls, retaining wall, septic tank etc. including bailing out water where necessary and removal of surplus earth with all lead and lifts as directed and specified for the following classification of soils.
All kinds of soil (ordinary soil/ hard soil/ dense soil)
In ordinary rock (soft rock/ medium rock/ hard shale)
In hard rock (soft rock/ medium rock/ hard shale) (Blasting prohibited)
All kinds of soil
In ordinary rock
In hard rock (Blasting prohibited)
Disposal of surplus earth/ unserviceable material from the work site including loading and unloading complete as directed for a total of 15 km (i.e. 10 km beyond the initial lead of 5 km)
Excavated earth
Excavated rock
Close timbering in trenches including strutting, shoring and packing cavities (wherever required) complete. (Measurements to be taken of the face area timbered).
Upto a depth of 1.50 m
Above 1.50 m upto 3.00 m depth
Earthwork in filling (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, including breaking of clods, consolidating each layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
With available excavated earth
Extra over Item for additional lift of 1.5m or part thereof for all types of soils
Sand filling in plinth in layers not exceeding 150mm in depth including breaking of clods, consolidating by watering and ramming complete as directed (maximum depth 45 cm)
SUB TOTAL
Centering and shuttering including strutting, propping etc. and removal of form for all heights complete and as directed by the Engineer-in-charge.
Shuttering for sides of plain cement concrete work in blinding concrete, plinth protection, copings, sills etc.
Foundations, footings, bases of columns, raft, grade slab etc. for mass concrete (using steel)
Suspended floors, roofs, landings, balconies and access platforms, shelves (using steel)
Lintels, beams, plinth beams, girders, bressumers and cantilevers (using steel)
Columns, Pillars, Piers, Abutments, Posts and Struts (using steel)
SUB TOTAL
Plain cement concrete works in foundation bed for footing steps, walls, brick works etc. below plinth level as directed and specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured and paid separately).
1 :3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size)
Providing and laying cement concrete in retaining walls etc. and all works above plinth level such as pilasters, columns, pillars, posts, struts, buttresses, parapets, coping, plain window sills, fillets, sunken floor etc.,, up to first floor level, excluding the cost of centering, shuttering and finishing
1:3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominal size) (For cement concrete screed below floors)
SUB TOTAL
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per ls: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge.
All works up to plinth level
All works above plinth level up to first floor level
Supplying, fitting and fixing in position reinforcement bars up to lst floor level, conforming to relevant I.S. Code for R.C.C. work/ R.B. walling including straightening, cleaning, cutting and bending to proper shapes and length as per details, supplying and binding with 20 G annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete. (Rates inclusive of all wastage, lappage, hooks, chairs, anchorage etc. and no measurement for the same is required)
Thermo-Mechanically Treated bars
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.53 MB
BOQ_1973.xls
BOQ • 2.11 MB
Specifications.pdf
Additional Documents • 4.59 MB
SupplementaryInformationEHSlot2.rar
Additional Documents • 32.26 MB
DrawingsCW06Lot02.rar
Additional Documents • 32.50 MB
Download all tender documents and submit your bid